Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Appendix E - Integrated Water Management Plan

Attached to the e-mail Multiple Housing Type 3 Retirement & Special Needs (48 units) - MCU18/0009.

of 53

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 29, section 1. The text section number identifies this passage in the reader.

2.0     PRE- AND POST-DEVELOPMENT RUNOFF RATES BY THE RATIONAL METHOD

The Rational Method has been used in this study as a sanity-check on the flow rates predicted by the
Urbs models.

Pre-Development:

The pre-development topography, cover and drainage pattern of the 0.82 hectare design catchment can
be seen in Figure 2 on page 6 of this report. The pre-development C10 runoff coefficient, for an
impervious fraction of 22 percent, is 0.744. The time of concentration, for sheet flow lengths of 60 to 70
metres at slopes of 3 to 4 percent through reasonably well-maintained grass and trees is 15 minutes. The
consequent pre-development peak flow rates are therefore calculated as follows:

Q100 = 0.00278 x 1.2 x 0.744 x 210 x 0.82 = 0.43 m3/sec
Q10 = 0.00278 x 1.0 x 0.744 x 145 x 0.82 = 0.25 m3/sec
Q1 = 0.00278 x 0.8 x 0.744 x 85 x 0.82 = 0.11 m3/sec

Post-Development:

The post -development cover and drainage pattern can be seen in Figure 2 on page 6 of this report. The
pre-development C10 runoff coefficient, for an impervious fraction of 65 percent, is 0.830. The time of
concentration, for sheet flow lengths of 20 to 25 metres at slopes of 3 to 4 percent through well-
maintained grass and trees, followed by 40 to 50 metres of allotment piping at 1 m/sec, is 10 minutes.
The consequent post-development peak flow rates are therefore calculated as follows:

Q100 = 0.00278 x 1.2 x 0.830 x 251 x 0.82 = 0.57 m3/sec
Q10 = 0.00278 x 1.0 x 0.830 x 173 x 0.82 = 0.33 m3/sec
Q1 = 0.00278 x 0.8 x 0.830 x 83 x 0.82 = 0.15 m3/sec




3.0     BROAD-BRUSH DETENTION VOLUME

The 43 percent in the catchment’s impervious fraction (from 22 percent to 65 percent) is about two
thirds of what would typically be expected for development of a medium-sized “Res A” lot. Given that
medium-sized “Res A” development generally requires about 250 cubic metres of detention volume for
each hectare of development platform, the proposed extension of facilities into the 0.82 hectare at
Cartwight Village should therefore be expected to require a detention volume in the order of:

Two-thirds of 250 x 0.82 = 137 cubic metres.




                                                                                                   Page 4
      Brisbane Stormwater Management Pty Ltd Document File: Carramar.Doc
Log in to download the original file

Appendix E - Integrated Water Management Plan.pdf · 6.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.