Original source · versioned page text
Appendix E - Integrated Water Management Plan
Attached to the e-mail Multiple Housing Type 3 Retirement & Special Needs (48 units) - MCU18/0009.
Plans and drawings: the text below has words only, no drawings.
Original PDF page 31, section 1. The text section number identifies this passage in the reader.
The model set-up for the post-development scenario is shown in Figure 3, below.. The model structure
has 17 subareas. Subareas 1 to 10 represent areas other than the proposed roofs, whereas subareas 11 to
18 represent the proposed roofs. The runoff from subareas 11 to 18 are conceptually lumped together
before passing through a single conceptual detention volume , before being conjoined with the sum of
the runoffs from subareas 1 to 10.
The corresponding coding of the Urbs catchment file for this post-development scenario can be seen in
Appendix C hereto.
NORTH
1
11 12
VILLA 5 VILLA 6
2
0 SCALE 50 m
3
STORMWATER CATCHMENT BDY 13
FOR PROPOSED EXTENSION VILLA 4
4 DB OUT
5
14
VILLA 3
15
ENTRY
6 7
LANDSCAPED
PODIUM
17 8
9 16
VILLA 2
VILLA 1
10
COOROY - NOOSA ROAD
Figure 3: URBS Model Layout For Post-Development Scenario
The pre-development and post-development models shared the same operating parameters – namely, an
alpha parameter of 2.0 and an m parameter of 0.80, with reach factor lengths varying from 1.9 to 2.5 in
Page 6
Brisbane Stormwater Management Pty Ltd Document File: Carramar.Doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.