In summary, the modelling has suggested a minimum 100 year detention volume of 118 cubic metres,
or maybe as much as 140 cubic metres if like-for-like storm durations are considered to be a vital
requirement. Both of these volumes are reasonably consistent with the broad-brush estimate of 137
cubic metres at the bottom of page 4 of this report. A nominal volume of 130 cubic metres was
therefore adopted, on the basis that the use of the latest infiltration allowances and temporal patterns at
the detailed design stage will most likely result in a slight reduction in the required detention volume,
albeit at the expense of substantially greater design complexity..
The 130 cubic metre volume was then simply apportioned between the three groups of roof areas, on
the basis of contributing roof area as a proportion of total roof area, resulting in the conceptual
arrangement shown in Figure 4 below. This provides a total of 131 cubic metres, using the ecoAID
underground cellular system. Details of this system are shown in the brochure in Appendix A hereto.
RW
NORTH
VILLA 5 VILLA 6
ecoAID SYSTEM
7 ROWS x 12 UNITS
SPLIT INTO 2 CELLS
DET VOL 61 m3
RW B5
0 SCALE 50 m
VILLA 4
ecoAID SYSTEM
3 ROWS x 9 UNITS
DET VOL 21 m3
RW
ecoAID SYSTEM
5 ROWS x 14 UNITS
DET VOL 49 m3
VILLA 3
TOTAL DETENTION VOLUME 131 m3
B4
ENTRY
RW B3
B1
VILLA 2
VILLA 1
B2
COOROY - NOOSA ROAD
Figure 4: Conceptual Arrangement Of Detention Volume
Page 8
Brisbane Stormwater Management Pty Ltd Document File: Carramar.Doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.