Original source · versioned page text
Appendix E - Integrated Water Management Plan
Attached to the e-mail Multiple Housing Type 3 Retirement & Special Needs (48 units) - MCU18/0009.
Plans and drawings: the text below has words only, no drawings.
Original PDF page 41, section 1. The text section number identifies this passage in the reader.
5
4
1 2
6
KEY FEATURES & BENEFITS
1 Corrugated Arch Design – incorporating a true parabolic inner profile for
optimum load-shed via soil arching, with boxed-out corrugations providing arch
stiffness and rigidity ensuring structural integrity over the system’s 100 year+
design life. 3
2 Six slots per corrugation – Reducing chamber emptying time.
3 End Cap to close out row – Flat end cap base design ensuring no rotation of end
cap and chambers occurs when backfill material is placed. The end caps have cut
out guides accommodating pipe inlets up to 625mm outside diameter.
4 Moulded side entry ports (100mm Ø or 150mm Ø) – Integrated lateral pipe
ports allowing side entry lot connections directly into the ecoAID system and also
used to aid system equalisation and water distribution.
5 Moulded vertical entry ports (100mm Ø or 150mm Ø) – Integrated vertical pipe
ports to accommodate breather pipes for system ventilation, inspection access
7
and used for water extraction pipes on stormwater harvesting applications.
6 Keyed feet with stiffeners – The flat keyed feet of the chambers are locked
into place by the embedment aggregate preventing movement during backfill
placement and compaction.
7 Each chamber weighs only 15 kg – Can be installed by one person ensuring safe
and rapid installation. 8
8 Single or double layer configuration – Can be designed and installed in two
layers to increase effective volume.
ecoAID® Underground Stormwater Management
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.