Original source · versioned page text
Appendix F - Survey
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
C (D)
D) D)
W( S(
(D)
D (D)
C
D)
8 1 W( S(
D)
P5014 RP35096 D)
C (D)
C(
D)
D)
W( D)
C(
S(
D (D)
(D) D)
D) C C(
W( D) (D)
S( W
D)
W (D) 90.49
(D)
C(
S (D
W (D) D) C D)
W (D) W( C(
)
W (D) 90.71 D) (D)
W (D) S( W
W (D)
C (D) C (D) C (D) C (D) C (D) W (D) C (D) W C (D) C (D) C (D) C (D) C (D) C (D) W (D) C (D) C (D)
(D) 91.20 91.06 91.01 W 90.89
(D)
W (D) C 90.78 90.33 D)
S (D)
W (D) (D) W (D)
Kerb and Channel C(
W (D)
91 90.44 90.47 S(
D) (D)
W
90.91 LEGEND:
S (D
91.09 91.01 C( 90.78 90.68 90.57 D)
D)S (C) S (C) S (C) S (C) D) C(
)
S (C)
91.14
S (C) 90.58 C( Road Terrain
90.97 90.65 (D)
W (D)
90.85 90.74 W Kerb Back Driveway
Road edge linemarking C(
D) (D)
C
(D Kerb Invert Footpath
D) C ) Edge of Bitumen Slab Edge
90.61 C(
(D) Edge of Gravel Retaining Wall Base
W Road Crown Retaining Wall Top
C( 90.74
Centreline of Road D) D) Traffic Park Meter Change of Grade
90.93 D) C( C
91.26 91.06 C( (D
) Traffic Light Top of Bank
91.16 (D)
C (D)
W (D)
Traffic Pit Toe of Bank
Site Benchmark
W
1
School Street
C( Traffic Sign Waterline
D)
(D) Traffic Post Box Garden Edge
Nail in Bitumen Guide post
C
SP275888 Structures Creek Toe of Bank
D)
(D) C
(D
C(
RL 91.20m Road edge linemarking C(
D) 90.52
W ) Building Line Creek Top of Bank
90.58 Roof Ridgeline Creek Invert
90.65 C (D)
Fence Line Creek Waterline
90.78
C (D)
W (D)
91.19 Bitumen 91.01 90.90 (D) Gate Tree
C( W Tree Canopy
D) Hand Rail
Guide post (D) Cattle Grid Control Point/PSM
D)
C
C(
W (D) W (D) W (D) W (D) W (D) W (D) W (D) W (D) Bollard Drainage
W (D) W (D) W (D) W (D) W (D) W (D) W (D) C(
D) Sewer D(*) Drainage line
C (D) C (D) C (D) C (D) C (D) C (D) C (D) C (D) C (D) C (D) C (D) C (D) S(*) Sewer Line Open Drain
C (D) C (D) C (D) EOH
D)
EOH EOH
Manhole
C(
EOH T2 Valve
91
EOH EOH
EOH EOH Inspection Opening Field Inlet
EOH EOH
EOH EOH 90.90 Manhole Downpipe
EOH EOH 91.01 90.65 H 90.39
EO Electrical Communications
C(
91.04 90°00'
D)
E(*) Electricity Line C(*) Communication Line
T5 T4
T1 Overhead Line TOH Overhead Line
Concrete
T3 EOH
20.117
C (D)
90.95 Pits/Manholes Pits/Manholes
90.87 H
EO Pole Pillar
Street Light Gas
C (D)
//
//
Light In-Ground G(*) Gas Line
H Water Valve
EO
90.73 90.35 90.30 W(*) Water Line Marker
General
C (D)
Meter
Chainwir //
90.81 Valve Pothole
90.94 90.81 90.82 Floor Level 91.11 H Fire Hydrant
Tap Subsurface Utility - QL
C (D)
Sprinkler * (A) * QL-A (H±50mm,V±50mm)
Fuel * (B) * QL-B (H±300mm,V±500mm)
e fence
//
C( P(*) Fuel Line * (C) * QL-C (H±300mm,2D)
D)
C (D)
Floor Level 91.13 Fitting * (D) * QL-D (Exist Record)
90.21
90.82
90.02 1
C (D)
C(
D)
SP316907 NOTES:
Ridge line
90.79
89.99
C (D)
90.70 90.81
C( 90.11 1. Drawn to scale on an A3 sheet.
D) Concrete
//
//
Weatherboard house 2. Contour Interval... 0.25m
C (D)
3. All levels are in metres on the Australian Height
C( 89.92 Datum referred to (PSM154817) - RL 92.282 AHD
D) 89.99
situated in RECTORY ST POMONA.
C (D)
4. All Boundaries are vide title and subject to
90
confirmation by survey.
90.63 90.80 90.79 5. The Location of Underground services are in
C (D)
//
//
Scale 1:250 90.69 90.65
90.17 90.14 90.04 accordance with AS5488:2019, the Australian
Standard for classification of Subsurface Utility
Gravel
90.61 Concrete
D (C)
Stormwater Pipe: Information (SUI). The exact nature and location
90.31 (House connection)
of these services should be confirmed prior to
0m 5 10 15 20 25 90.10
90.08
90.04 construction.
90.50 6. Area vide title : 1868m²
90.52
7. Field Survey Completed on 09/08/2024 & 23/10/2024
//
//
90.09 90.07 90.05 90.08
D (C)
90.07 90.05 89.78
90.41 90.14 90.12
90.42
//
D (C)
Level datum: AHD Derived ((PSM154817))
90.04 Horiz datum: PLAN ((RP35096))
90.11 90.06
//
90.36 90.37 90.15 Coord Origin: Arbitrary ((NW Cor Site))
GDA System: Not Applicable Coordinate System: Plane 1:1
90.22 90.15 90.06 See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 3 sections
Section 2
90.10 Meridian: + 0°00'00" RP35096
90.05
90.16 90.10
D (C)
90.29 90.24 Title:
//
Gravel 89.94 VERIFICATION PLOT
90.27 90.18
0°00' Colorbond fence
90.23
90.29 90.20 90.13 Lot 14 on RP35096
//
14 2 5 School Street, Pomona
D (C)
Steel shed 89.89
RP35096 90.19 90.16 SP316907
21 90.18 90.17
90.01
// 56.931
90.08 90.04 90.00
Rowan Anderson
P5015 Client:
90
75.901
CP
165°
Locality: Pomona
D (C)
//
SP316907
26'
Local Gov: Noosa Shire Council
Surveyed By: WA Approved: CJ
90.10 89.92
90.16 Date Created: 23/10/24 Scale:
S (D)
90.08 90.05 1:250
//
//
90.14 90.08 89.97
D (C)
22 File Ref: 241221
P5015 Plan No: 241221_002_VER Rev: A
Page 1 of 3 A3
Section 3
90.27 90.18
0°00' Colorbond fence
90.29 90.23 90.13
90.20
14
D (C)
2
//
//
Steel shed 89.89
RP35096 90.19 90.16 SP316907
21 90.18 90.17
90.01
90.08 90.04 90.00
P5015
90
75.901
CP
165° //
D (C)
56.93
SP316907
26'
1
//
90.10 89.92
90.16
S (D)
90.08 90.05
D (C)
90.14 90.08 89.97
22
P5015 LEGEND:
S (D)
Road Terrain
//
//
90.13 90.15 90.07 Kerb Back Driveway
D (C)
Kerb Invert Footpath
89.89 Edge of Bitumen Slab Edge
90.06 90.05
Gravel 89.93 Edge of Gravel Retaining Wall Base
Timb
89.97
C (D
) Pad Road Crown Retaining Wall Top
Traffic Park Meter Change of Grade
S (D)
er fe //
C (D 90.07 Traffic Light Top of Bank
) 90.14 90.08 Traffic Pit Toe of Bank
D (C)
90.12 Traffic Sign Waterline
nce
C (D
)
SW Field Inlet:
Traffic Post Box Garden Edge
D) Creek Toe of Bank
IL: 89.559 S( Structures
//
C (D Type: 100 PVC Building Line Creek Top of Bank
)
Roof Ridgeline Creek Invert
S (D)
90.15 90.15 90.00 Fence Line Creek Waterline
90.11 90.08 90.03 D)
S( Gate Tree
Hand Rail Tree Canopy
Sewer MH:
Cattle Grid Control Point/PSM
D) Bollard
S(
//
(Unable to open) 89.96 Drainage
IL: 88.45 (from records) Sewer Pipe: Sewer D(*) Drainage line
Type: 160 PE-100 (Abandoned)
S(*) Sewer Line Open Drain
S (D)
//
90.05 n
rde S(
D) Valve Manhole
90.13
90.07 Ga Inspection Opening Field Inlet
90.14 S (D) S (D) Manhole Downpipe
90.18 S (D) S (D) S (D) S (D) //
)
S (D) Communications
S (D
S (D) S (D) S (D) Electrical
90 E(*) Electricity Line C(*) Communication Line
Sewer MH: Garden 89.86
EOH Overhead Line TOH Overhead Line
*Plotted from records*
IL: 88.58 (from records) Sewer MH: 89.98 Pits/Manholes Pits/Manholes
S (C)
Type: 160 PE-100 (Unable to open) // Pole Pillar
IL: 87.32 (from records) 90.02 Street Light Gas
//
Type: 160 PE-100 89.84
)
Light In-Ground Gas Line
S (D
G(*)
T6 Water Valve
90.23 W(*) Water Line Marker
90.19 T7
T8 // Meter General
Valve Pothole
S (C)
T14
H Fire Hydrant
Timber fence
Tap Subsurface Utility - QL
)
S (D
//
T13 Sprinkler * (A) * QL-A (H±50mm,V±50mm)
Garden T15 T29
T30 Fuel * (B) * QL-B (H±300mm,V±500mm)
//
4 P(*) Fuel Line * (C) * QL-C (H±300mm,2D)
.23 ' Fitting * (D) * QL-D (Exist Record)
40
°51
S (C)
89.84 /
/ 23 8 T27
)
S (D
90.16
Scale 1:250 T12 1 NOTES:
90.15 T11 // T16 RP35098 1. Drawn to scale on an A3 sheet.
//
)
S (C)
T26
89.93 2. Contour Interval... 0.25m
S (D
0m 5 10 15 20 25 T10 //
T28 89.50 3. All levels are in metres on the Australian Height
89.49 Datum referred to (PSM154817) - RL 92.282 AHD
n ce 89.53 situated in RECTORY ST POMONA.
T9 r fe 89.59
be 90 4. All Boundaries are vide title and subject to
90 Tim f Bank
)
Bottom o
S (D
confirmation by survey.
S (C)
//
89.82
89.71 5. The Location of Underground services are in
//
S (D) S (D) S (D)
89.94
90 S (D) accordance with AS5488:2019, the Australian
S (D) S (D) 89.76 S (D)
S (D) S (D)
S (D)
S (D) 90.39 Standard for classification of Subsurface Utility
S (D) Information (SUI). The exact nature and location
S (D)
S (D) 90.45 90.38
S (D) 90.49 T24 of these services should be confirmed prior to
S (D) 90.48 90
90.45 T22 construction.
90.17
Top of Bank
Sewer MH: T23 6. Area vide title : 1868m²
(Unable to open) T20 T21 T25
90 7. Field Survey Completed on 09/08/2024 & 23/10/2024
IL: 87.04 (from records) T18
T17
T19 89
Type: 160 PE-100 88.78
88.95 88.86
88.99
88.99
88.77
89.06 Bottom of Bank 89.03
88.77
88.96 D (D)
D (D)
88.94 88.69 D (D)
89 D (D)
89.05 88.98 88.65 D (D) Level datum: AHD Derived ((PSM154817))
88.99 88.68 D (D)
D (D)
D (D) Horiz datum: PLAN ((RP35096))
D (D) D (D) 88.79
D (D)
D 88.81
D (D) D (D) D (D) 88.79 (D) Coord Origin: Arbitrary ((NW Cor Site))
D (D)
D (D)88.84
D (D) D (D) D (D) D (D) 88.91 GDA System: Not Applicable Coordinate System: Plane 1:1
88.77
Channel 89 88.94 Meridian: + 0°00'00" RP35096
89.01 89.01 88.97 88.96
89.07 89.05 89.06 89
Title:
89.05 89.09
89.25
VERIFICATION PLOT
89.11
89.17 Bottom of Ban
k 89.51
89.60
89.55 Lot 14 on RP35096
89.79 89.64
89.70
89.87 89.69 5 School Street, Pomona
Top of Bank
90
90.10 89.94 89.87
90.01 90.00 89.96 89.82
Client: Rowan Anderson
Unsealed Bitumen Driveway Locality: Pomona
Rifle Street Local Gov: Noosa Shire Council
C (D) C (D) C (D) C (D) C (D) C (D) C (D) C (D) C (D) C (D) C (D) C (D) C (D) C (D) C (D) C (D) C (D) C (D) C (D) C (D) C (D) C (D) Surveyed By: WA Approved: CJ
Date Created: 23/10/24 Scale: 1:250
W (D) W (D) W (D) W (D) W (D) W (D) W (D) W (D) W (D) W (D) W (D) W (D) W (D) W (D) W (D) W (D) W (D) W (D) W (D) W (D) W (D) W (D) File Ref: 241221
Plan No: 241221_002_VER Rev: A
Page 2 of 3 A3
Section 4
LEGEND:
Road Terrain
Kerb Back Driveway
Kerb Invert Footpath
Edge of Bitumen Slab Edge
Edge of Gravel Retaining Wall Base
Road Crown Retaining Wall Top
Traffic Park Meter Change of Grade
Traffic Light Top of Bank
Traffic Pit Toe of Bank
Traffic Sign Waterline
Traffic Post Box Garden Edge
Tree Schedule Tree Schedule Structures
Building Line
Roof Ridgeline
Fence Line
Creek Toe of Bank
Creek Top of Bank
Creek Invert
Creek Waterline
Gate Tree
PointNumber Type Diameter Spread Height PointNumber Type Diameter Spread Height Hand Rail
Cattle Grid
Bollard
Tree Canopy
Control Point/PSM
Drainage
T1 NATIVE 0.1 1.5 2 T16 NATIVE 0.5 12 22 Sewer
S(*) Sewer Line
D(*) Drainage line
Open Drain
Manhole
Valve
Inspection Opening Field Inlet
T2 NATIVE 0.2 4 3 T17 NATIVE 0.1 3 8 Electrical
Manhole Downpipe
Communications
E(*) Electricity Line C(*) Communication Line
T3 NATIVE 0.2 4 3 T18 NATIVE 0.1 3 8 EOH Overhead Line
Pits/Manholes
TOH Overhead Line
Pits/Manholes
Pole Pillar
T4 NATIVE 0.2 4 3 T19 NATIVE 0.1 3 4 Water
Street Light
Light In-Ground
Gas
G(*) Gas Line
Valve
W(*) Water Line Marker
T5 NATIVE 0.2 4 3 T20 NATIVE 0.1 3 4 Meter
Valve
General
Pothole
H Fire Hydrant
T6 NATIVE 0.3 7 20 T21 NATIVE 0.1 3 9 Tap
Sprinkler
Subsurface Utility - QL
* (A) * QL-A (H±50mm,V±50mm)
Fuel * (B) * QL-B (H±300mm,V±500mm)
* QL-C (H±300mm,2D)
T7 NATIVE 0.3 8 8 T22 NATIVE 0.1 3 10 P(*) Fuel Line
Fitting
* (C)
* (D) * QL-D (Exist Record)
T8 NATIVE 0.3 9 22 T23 NATIVE 0.1 3 5
NOTES:
T9 NATIVE 0.1 3 4 T24 NATIVE 0.1 3 5 1. Drawn to scale on an A3 sheet.
2. Contour Interval... 0.25m
T10 NATIVE 0.2 5 5 T25 NATIVE 0.1 3 5 3. All levels are in metres on the Australian Height
Datum referred to (PSM154817) - RL 92.282 AHD
situated in RECTORY ST POMONA.
T11 NATIVE 0.4 5 9 T26 NATIVE 0.7 15 28 4. All Boundaries are vide title and subject to
confirmation by survey.
T12 NATIVE 0.3 5 7 T27 NATIVE 0.6 12 24 5. The Location of Underground services are in
accordance with AS5488:2019, the Australian
Standard for classification of Subsurface Utility
T13 NATIVE 0.2 5 7 T28 NATIVE 0.4 7 12 Information (SUI). The exact nature and location
of these services should be confirmed prior to
construction.
T14 NATIVE 0.2 5 7 T29 NATIVE 0.5 8 20 6. Area vide title : 1868m²
7. Field Survey Completed on 09/08/2024 & 23/10/2024
T15 NATIVE 0.2 5 7 T30 NATIVE 0.6 12 20
Level datum: AHD Derived ((PSM154817))
Horiz datum: PLAN ((RP35096))
Coord Origin: Arbitrary ((NW Cor Site))
GDA System: Not Applicable Coordinate System: Plane 1:1
Meridian: + 0°00'00" RP35096
Title:
VERIFICATION PLOT
Lot 14 on RP35096
5 School Street, Pomona
Client: Rowan Anderson
Locality: Pomona
Local Gov: Noosa Shire Council
Surveyed By: WA Approved: CJ
Date Created: 23/10/24 Scale: 1:550
File Ref: 241221
Plan No: 241221_002_VER Rev: A
Page 3 of 3 A3