Skip to the record
Search everything, all in one place.

Original source · versioned page text

Cover letter

of 7

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Conditions

Additional Conditions Minor Change 6 September 2022 – Mini golf facility
      Approved Plans
19. Development undertaken in accordance with this approval must generally comply with the
    approved plans of development. The approved plans are listed in the following table and
    may be amended by these conditions.
           Plan No.       Rev.     Plan/Document Name                          Date
           -              -        Noosa Hills Proposed 18 Hole Miniature Golf 26/07/22
                                   Course, Prepared by RCDG
           -              -        Kiosk Floor Plan, prepared by the applicant -

Development built in accordance with plans

      Nature and Extent of Use
20.   The approved hours of operation of the mini golf facility are:
      a.       Sunday, Monday, Tuesday, Wednesday: 9:00am to 6:00pm
      b.       Thursday to Saturday & Public Holidays & School Holidays: 9:00am to 9:00pm
21.   The kiosk must not be open to the general public.


The use to be undertaken in accordance with these conditions.


      Car Parking
22.   A minimum of 25 additional car parking spaces must be provided and marked on the
      site and made available and accessible at all times while the use is open for business.
      The works must be undertaken in accordance with an Operational Works approval and
      must include in particular:
      a.       disabled parking space/s within the total
      b.       dimensions, crossfalls and gradients in accordance with Australian Standard
               AS/NZS2890.1:2004 Parking Facilities
23.   All car parking areas and access driveways must be maintained exclusively for vehicle
      parking and manoeuvring and kept in a tidy and safe condition at all times.
24.   Directional signage must be provided to direct customers to the car parking spaces
      provided on site.


25 Spaces provided and to be constructed in accordance with the notes on SCG’s
plans.


      Stormwater Drainage
25.   Stormwater runoff from the development must be disposed of on-site without causing
      scour or damage to the subject site or any adjoining property.

Drainage is to connect into existing flow path swales to the south of the carpark as per
SCG plans.
Log in to download the original file

Cover letter.pdf · 621 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.