Original source · versioned page text
PG-9236, 2022-10-31, Asr Ver 1
Project No. PG-9236 Page | 1 November 2022 Ref: PG-9236, 2022-11-01, ASSMP VER 1 Looroo Property Trust – Acid Sulfate Soil Management Plan – Proposed Residential Development, 128-132 Gympie Terrace, Noosaville Acid Sulfate Soil Management Plan (ASSMP) PROPOSED RESIDENTIAL DEVELOPMENT 128-132 GYMPIE TERRACE, NOOSAVILLE Objective The objective of the ASSMP is to control any acid generation from insitu ASS materials and to restrict to an acceptable level any potential on-site and off-site environmental impacts. A further objective is to manage earthworks activities and provide measures to maintain water quality within the site and in adjacent areas. Proposed It is understood that the proposed development is to comprise the Development construction of a two storey residences above a single storey basement. Earthworks are envisaged to consist of cuts of up to 3m for the basement. A total volume of material to be disturbed is less than 3,000m3. Subsurface Conditions Mapping The site is located in an area that is mapped on the Queensland Department of Natural Resources and Mines Acid Sulfate Soils Tweed Heads to Redcliffe sheet as Disturbed Land likely to contain ASS. ASS Investigation Drilling and sampling encountered a reasonably consistent profile of sand that: • did not indicate any obvious ASS presence from a visual and tactile perspective in the fill or the natural profile. • indicated that the upper level sands were not acid sulfate soils and the sands between 1.5m and 2.5m indicated a low level of acid sulfate soil present. • had the highest liming rate required to neutralise the acidity of 8kg/m3 (based on laboratory testing of selected samples). For the lower level silty sands. • The proposed excavations (to 3m) will disturb the acid sulfate soils. • Given the proposed excavation levels, disturbance of acid sulfate soils will occur and treatment for acid sulfate will be required for materials distributed greater than 1.5m below ground level. Management To mitigate and manage potential adverse environmental impacts Strategy during site construction operations, the following will be undertaken: • an ASS consultant should review the site earthworks schedule and plan of operations; • adoption of appropriate erosion control measures to limit sediment loss due to run-off from site works area; • where excavation below the water table, or if disturbance of any silty sands is necessary, a materials handling and management strategy and procedures for lime treatment of any disturbed material will be required; • monitoring and treatment (if necessary) of waters in detention basins to a level suitable for discharge into external waterways; and • site supervision by approved persons and regular reporting to the Project Engineer/Manager throughout the construction phase.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.