Council archive · source document
Minor Change Existing Approval 132003.221172.A
Officer: Wilhelm Koschade Direct Telephone: 07 53296215 Our Reference: 132003.221172.A : JELDER Your Reference: 2353 5 July 2018 W Jenner C/- Martoo Consulting Pty Ltd PO Box 1684 NOOSA HEADS QLD 4567 [email protected] Dear Sir/Madam, Decision Notice – Minor Change Planning Act 2016 I refer to your application received on 13 June 2018, requesting a minor change to an existing development approval. Council decided your requested changes. Details of the decision are as follows: APPLICATION details Application No: 132003.221172.A Street address: 61 Elanda St Sunshine Beach Qld 4567 Real property description: Lot 408 RP 48112 Planning Scheme: The Noosa Plan (27 November 2017) Decision details The following type of approval was issued on 14 October 2004. Preliminary Approval for Material Change of Use - Duplex Dwelling In relation to the request to make a minor change to the existing approval, Council on 3 July 2018, decided to approve the requested changes. The changes are detailed below. A. Approve the change. B. Amend conditions 2, 5 and 8 C. Delete condition 6.1. currency period of approval The currency period for this development approval finishes on 16 December 2020. assessment manager conditions Land Use Deleted. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 100.01 B Site Plan, drawn by Gockel Architects 08/06/2018 200.01 B Garage Level Plan, drawn by Gockel Architects 08/06/2018 200.02 B Lower Apartment Plan, drawn by Gockel Architects 08/06/2018 200.03 B Upper Apartment Plan, drawn by Gockel Architects 08/06/2018 200.04 B Terrace Level Plan, drawn by Gockel Architects 08/06/2018 300.01 B Western Elevation, drawn by Gockel Architects 08/06/2018 300.02 B Southern Elevation, drawn by Gockel Architects 08/06/2018 300.03 B Eastern Elevation, drawn by Gockel Architects 08/06/2018 300.04 B Northern Elevation, drawn by Gockel Architects 08/06/2018 The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. The development must not exceed 40% maximum site cover, as defined by the Schedule to the Planning Scheme. The development is to provide a minimum 222m2 of landscaped open space, as defined by the Schedule to the Planning Scheme. The development site must be landscaped. The works must be undertaken in accordance with an Operational Works approval and The Noosa Plan for the coastal area and must include in particular: 6.1 Deleted. 6.2 Provision of 2 x 100 Litre street trees within the road reserve. 6.3 All landscape works must be established and maintained in accordance with the approved design for the life of the development, and in a manner that ensures healthy, sustained and vigorous plant growth. All plant material must be allowed to grow to full form and be refurbished when its life expectancy is reached. 6.4 All landscape works must be maintained generally in accordance with the approved design for the life of the development. Existing trees on the site and within road reserves are to be retained, except where required to be removed due to building operations or the conduct of the approved use. The landscaped plans referred to above are to denote areas of existing vegetation or existing trees proposed to be retained. All fencing shall be setback an average of 1 metre from the front property boundary. The area of land between the fence and the front property boundary shall be densely landscaped to screen any fencing. Any deck areas are not to be enclosed with shutters, glass panelling or the like, thus remaining as open structures. Balustrading is to be of open and transparent materials. The maximum height of the development must not exceed 12m above the finished ground level and the natural ground level. Certification must be submitted to Council from a Licensed Surveyor which certifies that the building does not exceed the maximum height requirement of this Decision Notice. Deleted. Deleted. Deleted. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must be submitted, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for operational works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. The requirements of this development approval are to be effected, prior to the use of the premises. Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect compliance with conditions. This Development Permit for a Material Change of Use lapses if:- 17.1 the use has not commenced by 16 December 2020, unless application is made and approved by Council for an extension; or 17.2 the use of any premises pursuant to the Development Permit ceases. The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to obtaining a Development Permit for building works. Land Development Vehicle Access A 4.5 metre wide vehicular access driveway to serve the development shall be constructed from the Elanda Street frontage of the site. The driveway shall be designed and constructed to Council’s design standards and to grades that prevent vehicles from scraping and/or bottoming. Should any driveways be constructed to grades that do not comply with AS2890.1-1993 and AS2890.2-1989, Council will require that the driveway be removed and reconstructed to levels that do comply. All vehicles shall enter and leave the site in a forward direction. Carparking Carparking shall be provided within the site as shown on the approved plans, except as modified herein. A minimum of 3 covered carpark spaces shall be provided on site and the carparking area shall be designed to comply with the provisions of AS 2890.1-1993 with a minimum head clearance (headroom) at any point of 2.2m. Deleted. Vegetation Protection Existing trees to be retained shall be protected during the construction phase by providing temporary fencing around the trees. Plans submitted for Operational Works approval shall clearly show this. Roadworks Contributions A roadworks contribution of $1,061 towards the Coastal Major Road Network shall be paid to the Council prior to obtaining a Development Permit for Operational Works. This amount will be subject to variations in the Price Index, All Groups Brisbane from June 2004 until the date of payment. Roadworks Widening The Elanda Street frontage of the development shall be provided with kerb & channelling and bitumen road widening. The new kerb & channel shall be aligned so that it is located 8 metres off the existing kerb & channel on the western side of the road measured from the nominal face of the kerb. All associated and ancillary work including pavement correction to the existing pavement, drainage works, modification of the footpath, and adjustments to any existing infrastructure shall be undertaken to complete the roadworks widening. Plans detailing this work shall be prepared and submitted to Council for approval prior to obtaining a Development Permit for Operational Works. Frontage Works Footpath improvements such as topsoiling, grassing, and tree planting are required to the Elanda Street frontage of the site in accordance with Planning Scheme Policy PSP1 Landscaping Guidelines. Grass shall be couch, free of weeds. A new 1.2 metre wide concrete path shall be constructed along the frontage of the site in accordance with Council’s design standards and to an alignment that protects any significant vegetation or any underground services. The path shall be designed and constructed to ensure pedestrian safety using non-slip materials and to produce an evenly graded surface finish. Pathway Contributions A pathway contribution of $246 towards external major pathways, in accordance with Planning Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the Council prior to obtaining a Development Permit for Operational Works. This amount will be subject to variations in the Price Index, All Groups Brisbane from June 2004 until the date of payment. Stormwater Drainage All stormwater drainage shall be collected on site and discharged so there is no net increase in stormwater runoff from the site. Plans of the drainage design shall be prepared by a Registered Professional Civil Engineer and submitted to Council prior to obtaining a Development Permit for Operational Works. Any stormwater discharged to Council’s street drainage system shall have a maximum discharge at any one location of 25 litres/second. All site stormwater drainage shall be by means of a gravity system. Sewer Mains The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in accordance with Council’s standards and requirements at no cost to Council. Town Water Supply The site shall be connected to Council’s existing town water supply and be constructed in accordance with Council’s standards and requirements at no cost to Council. Each water connection to the water reticulation system shall extend to the property boundary and be metered. Where multiple units are served by a single service, multiple water meters to each individual unit shall be installed. All fees for the supply of water meters shall be paid to the Council. Service Easements A registered easement shall be created over the existing sewer main that crosses the rear of the site. The easements shall generally be parallel to and centred over the sewer main and be equivalent in width to twice the depth to invert level of the sewer at the deepest point within the allotment (measured from the finished surface) and be no less than 3.0 metres wide. In this regard, plans submitted for Operational Works approval shall accurately show the location of the easement. In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in writing that the Title Deed and the easement documents will be lodged at the Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of Council will be attended to promptly. A duly executed copy of the easement shall be submitted to Council for perusal prior to the use commencing. Any changes required by Council’s Solicitor must be corrected immediately. No building or other structure shall be constructed or encroach over an easement. Any building or structure within proximity of an easement or any other public utility’s underground must have its foundations designed so that no surcharge loads are imposed upon such underground infrastructure. Foundations must be taken down a minimum of 1 metre below a line of influence measured 1 metre in the direction of the foundation from the centreline of the closest underground service and along the natural angle of repose of the foundation soil type(s). Plans, and supportive documents, detailing these proposed foundations shall be designed by a registered practicing Geotechnical Engineer and submitted with the application for a Development Permit for Operational Works. Headworks Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28 and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks Contributions respectively and at the rates applicable at the time of payment. An estimate only of the contribution rates as of June 2004 under the current policies is as follows: Water Supply $ 4,255 Sewerage $ 2,905 TOTAL $ 7,160 All headworks contributions must be paid prior to the issue of a Development Permit for Operational Works. Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the headworks contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full. In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled, the contribution or trading bank guarantee will be returned. Earthworks Earthworks required on site shall be carried out in accordance with Section 3.8 of Council’s Engineering Design Standards Manual and so as not to cause the ponding of water on any adjoining lands or the blockage of, or interference with any natural watercourses. Earthworks carried out on site shall not affect the structural integrity of any of the existing fences that border the development site unless it is intended to replace such fences. In this regard any fences to be replaced shall be clearly shown on the plans submitted for Operational Works approval. Erosion and Sediment Control Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. Plans detailing the methods of controlling erosion and sediment are required to be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. General Any damage caused to any public utility during the course of construction shall be repaired to Council’s standards and at no cost to Council. Any alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site shall be at no cost to Council. The transportation of all materials to and from the site shall be undertaken in a manner such that no particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall be covered to prevent materials including dust being windblown from the vehicle. A Registered Professional Engineer of Queensland shall certify engineering drawings and specifications for all engineering works, which shall be submitted in conjunction with an application for a Development Permit for Operational Works. Building Services A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged with Council at completion of the work confirming compliance with the maximum building height above natural surface, required by the provisions of the Planning Scheme. Environmental Health The developer must provide a suitably screened imperviously paved area large enough for all refuse and recycling containers. A wash down area is required with a cold-water tap, hose and drain outlet connected to sewer. The drain outlet is to be designed to prevent stormwater entry to the sewerage system. Swimming pool or spa pumps are to be contained in an acoustically treated enclosure or located in a manner which prevents a noise nuisance beyond the subject land in accordance with the nuisance provisions of the Environmental Protection Regulation 1998. On the spot fines apply for such offences. All lift plant including motors, shall be situated within the building or suitably provided with noise reduction measures and located as to prevent a noise nuisance beyond the subject land in accordance with the nuisance provisions of the Environmental Protection Regulation 1998. On the spot fines apply for such offences. Noise emission from air conditioning equipment shall comply with the following requirements: 49.1 The equipment shall be installed and located in a manner which prevents noise nuisance beyond the subject land in accordance with the nuisance provisions of the Environmental Protection Regulation 1998 and Council’s Local Law No. 12 - Control of Nuisances. Infringement Notices (on-the-spot fines) may apply for offences. 49.2 Submission of written certification from a suitably qualified person confirming that the noise levels comply when measured at the nearest residential boundary. This is required immediately after installation of the equipment and prior to any occupation of the building, and in a format approved by Council. 49.3 A person must not use equipment on any day if it makes or causes noise to be made 49.3.1 Before 7am or after 10pm: More than the lower of either – 40 d(B)A 3 d(B)A above the background noise level 49.3.2 From 7am to 7pm: More than the lower of either – 50 d(B)A 5 d(B)A above the background noise level 49.3.3 From 7pm to 10pm: More than 3 d(B)A above the background noise level. Additional Condition – 27 April 2018 The proposed windows and awnings/hoods must be included to each elevation as specifically detailed in the list of approved plans referral agencies Not Applicable advisory notes The following Advisory Notes are for information purposes only and do not form conditions of approval: Building is to comply with the Building Code of Australia Section C Fire Resistance in regard to distances or protection required. Payment via credit card transaction will not be an acceptable method of payment for development contributions conditioned in this permit. The Environmental Protection Regulation 1998 and Local Law No.12 prohibit a builder from making noise from:- Monday to Saturday, before 7:00am or after 6:30pm Sunday or public holiday, at any time. A maximum penalty of $1,500 applies to an offence under these provisions. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint, cement, concrete, builders waste or rubbish shall not be permitted to enter or be placed where it could reasonably be expected to move into a roadside gutter, stormwater drain or a water course. On the spot fines apply for such offences. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the cost of operational works exceeds $80,000, then a portable long service levy is required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight the approved form issued by the Building and Construction Industry (Portable Long Service Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory declaration outlining the cost of the operational works must be submitted to Council with the lodgement of any application for operational works over the site. We advise ‘interested parties’ i.e. ‘developer’, ‘owner’, ‘tenant’ to consider their responsibilities under the Disabled Discrimination Act (DDA) in regard to the installation of disabled access and the provision of disabled facilities, and that access to this building and the provision of sanitary facilities may need to comply with the requirements of Section D Part D3 and Section F Clause F2.4 of the Building Code of Australia. Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Co-ordination Unit on 07 3247 6212 to discuss any obligations under the ACH Act. Infrastructure Contributions Infrastructure contributions for additional networks are payable under an Infrastructure Agreement dated 22 October 2014 attached to the site. property notes Not applicable. variation approval details Not applicable. further development permits required Development Permit for Building Works - Duplex Dwelling Development Permit for Operational Works - Landscaping, Carparking and Access, Frontage Works, Stormwater Disposal, Sediment and Erosion Controls and Filling of the Site submissions There were no properly made submissions about the application. rights of appeal You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. other details If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. Yours faithfully, Wilhelm Koschade Development Planner Enc: Referral Agency Response Appeal Rights Infrastructure Charge Notice Approved Plans/Documents cc. Unitywater DECISION NOTICE HISTORY Original Decision Notice - 14 October 2004. Decision Notice - Minor 132003.221172.6 – 16/02/2015, with an amendment to conditions 2,6,11,21 & 22 and delete conditions 14 & 23; 2003.221172.7 – 4/07/2017 change to condition 2; 132003.221172.8 – 27/04/2018 – change to condition 2 & 5 and include new condition 50. Decision Notice – Extension to Currency Period - 132003.221172.2 – 09/12/2008, with an amendment to conditions 17 and 132003.221172.3 – 09/08/2010 with an amendment to condition 17; 132003.221172.4 – 25/07/2012 with amendment to condition 17; 132003.221172.5 17/10/2004 change item 3 and 17; 2003.221172.9 15/06/2018 with an amendment to item 3 and condition 17.1 and include new advisory note. Decision Notice - Minor 132003.221172.A – 3 July 2018, with a change to conditions 2, 5,8 and delete condition 6.1. Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017 Chapter 6 Dispute resolution Part 1 Appeal rights 229 Appeals to tribunal or P&E Court (1) Schedule 1 of the Planning Act 2016 states – (a) Matters that may be appealed to – (i) either a tribunal or the P&E Court; or (ii) only a tribunal; or (iii) only the P&E Court; and (b) The person- (i) who may appeal a matter (the appellant); and (ii) who is a respondent in an appeal of the matter; and (iii) who is a co-respondent in an appeal of the matter; and (iv) who may elect to be a co-respondent in an appeal of the matter. (2) An appellant may start an appeal within the appeal period. (3) The appeal period is – (a) for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or (b) for an appeal against a deemed refusal – at any time after the deemed refusal happens; or (c) for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or (d) for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or (e) for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or (f) for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person. Note – See the P&E Court Act for the court’s power to extend the appeal period. (4) Each respondent and co-respondent for an appeal may be heard in the appeal. (5) If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal. (6) To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about- (a) the adopted charge itself; or (b) for a decision about an offset or refund- (i) the establishment cost of trunk infrastructure identified in a LGIP; or (ii) the cost of infrastructure decided using the method included in the local government’s charges resolution. 230 Notice of appeal (1) An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that- (a) is in the approved form; and (b) succinctly states the grounds of the appeal. (2) The notice of appeal must be accompanied by the required fee. (3) The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to – (a) the respondent for the appeal; and (b) each co-respondent for the appeal; and (c) for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and (d) for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and (e) each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and (f) for an appeal to the P&E Court – the chief executive; and (g) for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate. (4) The service period is – (a) if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or (b) otherwise – 10 business days after the appeal is started. (5) A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6). (6) A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person. 231 Other appeals (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable. (2) The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error. (3) A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter. (4) In this section – decision includes- (a) conduct engaged in for the purpose of making a decision; and (b) other conduct that relates to the making of a decision; and (c) the making of a decision or failure to make a decision; and (d) a purported decision; and (e) a deemed refusal. non-appealable, for a decision or matter, means the decision or matter- (a) is final and conclusive; and (b) may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and (c) is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground. 232 Rules of the P&E Court (1) A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal. (2) However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court [word/footer2.xml] Page 2 of 10 [word/footer3.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 10 [word/footer4.xml] Page 2 of 3 [word/header4.xml] 3 [Attachment: image3.png (image text)] ee) NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval 132003.221172.ARelated documentApplication case desk ↗
About this file
- File size
- 330 KB (small file)
- File type
- DOCX
No other editions are linked here.