Bligh Tanner Pty Ltd                 + Directors
ABN 32 061 537 666                   Paul Easingwood
[email protected]       Alan Hoban
blightanner.com.au                   Nathan Scott
                                     Simon Kochanek
+ Locations
Brisbane
Sydney


                                                                                                   REFERENCE DOCUMENT
                                                                                                       MCU12/0133.04
TECHNCIAL MEMORANDUM                                                                                  NOOSA COUNCIL
                                                                                                       10 MARCH 2025
To:               Carol Dowd <[email protected]>
Cc:


From:             Vancy Li
Date:             19 February 2025
Pages:            5


RE:                Noosa FLC Extension to Existing Gymnasium and Additional Pavements
Ref. No.          2025.0108
                                                             ______
This technical memo outlines a comparison between the proposed development changes and the original
site-specific Stormwater Management Plan (dated 08/08/2012, as prepared by Bligh Tanner).This memo is
intended as an addendum to the previous approved report.
Summary of Development Changes
The proposed minor extension to the existing Gymnasium at the Noosa Flexible Learning Centre (FLC)
includes an increase in Gross Floor Area (GFA) by 17 m², with the extension positioned beneath the existing
roofline. Additionally, minor pavement works are planned, adding 77 m² of impervious surface, comprising a
new pathway and extension of the slab for the Physical Education (PE) Court.
The primary objective of these modifications is to enhance the facilities at the Noosa FLC, ensuring improved
functionality while maintaining the existing staff and student capacity. The letter also considers previous
council-approved works that have been constructed following the original stormwater management plan,
which did not necessitate further engineering review or assessment in relation to stormwater management.

Table 1        Summary of Changes

                                                         ORIGINAL            ADDITIONAL      PROPOSED
                                                         DEVELOPMENT         APPROVED        DEVELOPMENT
                                                         APPLICATION         WORKS
 Additional Slab on ground area                          -                   100             77
 Total Slab on Ground Area                               177                 277             354
 Percentage of Slab on ground of the site                3.2%                5.0%            6.3%
 Additional Roof Area                                    -                   144             0
 Roof/Covered Area                                       1404                1548            1548
 Percentage of Covered area of the site                  25.1%               27.6%           27.6%
 Area Free of Structure                                  3808                3664            3587
 Percentage of Area Free of Structure of the site        68.00%              65.43%          64.05%

The changes of hardstand from the proposed works increase the percentage of slab-on ground on site only
by 1.3%, which still falls within 10% of the overall site area. And no extra roof area has been proposed as part
of the proposal.
Log in to download the original file

Reference Document - MCU12_0133.04.pdf · 281 KB (small file)

Full text of the other 4 pages

Page 2

                                                                                                             Page 2 of 5
Noosa FLC Extension to Existing Gymnasium and Additional Pavements
19 February 2025                                                                                      Ref. No. 2025.0108



Alignment of Proposed Changes with the Existing Stormwater Management Strategies
The previous stormwater management strategy incorporates several key features to ensure minimal impact
on site permeability, runoff, and pollutant generation. The proposed development has been assessed against
these features as below.

Table 2        Alignment of Proposed Changes with the Existing Stormwater Management Strategy

 KEY FEATURE                               DETAILS                                COMMENTS ON PROPOSED
                                                                                  DEVELOPMENT
 Ground-Level Permeability                 - At least 90% of the site will        - Despite a slight increase in slab-
                                           remain permeable to support            on-ground area, the site remains
                                           natural infiltration. - 3% of the      90% permeable, maintaining
                                           site (177 m²) will have slab-on-       natural infiltration.
                                           ground construction (Music
                                           building for soundproofing, and
                                           part of the Create building due to
                                           raised ground levels). - Most
                                           structures will be on raised piers
                                           to preserve infiltration
                                           characteristics and protect
                                           shallow tree roots.
                                           - 7% of the site will be car
                                           parking, using permeable
                                           pavement to reduce runoff.
 Minimal Structural Footprint              - 68% of the site will remain free     - 64% of the site will remain free
                                           of buildings or car parks,             of building or car parks
                                           minimizing changes to pollutant
                                           filtration and infiltration
                                           properties.
                                            - Includes retention of existing
                                           vegetation and revegetation with
                                           native species.
 Roof Runoff Management                    -25% of the site will be covered       - The increase in roof area is only
                                           by roofs.                              2.6% compared to previous
                                           - 60% of roof areas will drain into    approved works.
                                           rainwater tanks for non-potable        - No additional roof area is
                                           water use.                             proposed for this application.
                                                                                  - Rainwater tanks and infiltration
                                           - 60% of captured water will be
                                                                                  trenches remain functional for
                                           reused, with overflow directed to
                                                                                  water reuse and natural
                                           infiltration trenches.
                                                                                  infiltration.
                                           - Some roof areas will drain
                                           directly into infiltration trenches
                                           instead of rainwater tanks, due to
                                           the site’s low non-potable water
                                           demand.
                                           - The mean annual volume of
                                           surface runoff leaving the site will
                                           be 20% lower than existing levels
                                           due to rainwater harvesting and
                                           infiltration.

Page 3

                                                                                                           Page 3 of 5
Noosa FLC Extension to Existing Gymnasium and Additional Pavements
19 February 2025                                                                                   Ref. No. 2025.0108




 KEY FEATURE                               DETAILS                              COMMENTS ON PROPOSED
                                                                                DEVELOPMENT
 Runoff Treatment &                        - Site runoff will enter the         The existing water tank and
 Environmental Protection                  stormwater drainage system           infiltration system will be
                                           along Girraween Court.               retained. A new MUSIC model,
                                           - The drainage system flows          incorporating both previous and
                                           through an existing                  proposed works, has been
                                           bioretention/infiltration system     provided. Refer to ‘MUSIC
                                           before reaching Noosa National       Modelling’ Section for details.
                                           Park, Girraween Nature Reserve,
                                           and Burgess Creek.
                                           - While not specifically designed
                                           for the site, the bioretention
                                           system provides additional
                                           environmental protection.
                                           - No significant pollutant loads
                                           are expected due to the site’s
                                           intended use.
 Peak Flow & Flood Management              - The small increase in             The peak flows for stormwater run-
                                           impervious areas will lead to a     off from the site is likely to
                                           minimal increase in peak flows      increase marginally. However, the
                                           during major storms.                run-off will be contained within the
                                           - Approximately 1 m³ of flood       road reserve of Girraween Court
                                           detention will be required and      which ultimately discharges into
                                           can be easily accommodated in       Burgess Creek at the end of the
                                           the final site design through       Girraween Court. It is unlikely to
                                           infiltration systems, landscape     cause any worsening to third party
                                           depressions, or additional          property. In addition, on-site
                                           rainwater tank airspace.            detention is likely to cause a
                                                                               coincidence with external
                                                                               hydrograph peaks at confluence
                                                                               locations.
                                                                               Therefore, no on-site detention is
                                                                               deemed required or desirable for
                                                                               the proposed works.
 Overland Flow Path                        - Overland flow paths will remain   The overland flow path is expected
 Considerations                            consistent with existing            to remain unchanged with the
                                           conditions.                         minimal increase to hardstand.
                                           - During major storm events,
                                           water will sheet flow across the
                                           southwestern boundary onto
                                           Girraween Court, then west
                                           towards Burgess Creek.

In summary, the proposed works align with the original stormwater management strategies.
Erosion and Sediment Control
This site is considered low risk based on the following erosion hazard assessment:
    •    Predicted Annual Soil loss (tonnes) = A x B x T
    •    Where A = R.K.LS.C.P (as per the Revised Universal Soil Loss Equation).

Page 4

                                                                                                       Page 4 of 5
Noosa FLC Extension to Existing Gymnasium and Additional Pavements
19 February 2025                                                                                Ref. No. 2025.0108



Table 3 Values used in erosion hazard estimation

 FACTOR           DESCRIPTION                                    ADOPTED VALUE
 R                Rainfall erosivity factor                      5700 (i 2y 6hr = 15.8 mm/hr)
 K                Soil erodibility factor                        0.04 (loam)
 LS               Topographic factor                             0.2 (100 m @ 1%)
 C                Cover and management                           1 (no cover)
 P                Practice                                       1.3 (no management)
 B                Area of disturbance                            0.1 ha*
 T                Predicted duration                             0.25 yrs

*The area of disturbance should be less than 0.1 hectare as the proposed hardstand is only 77m.
      •   Predicted unmitigated soil loss = 59 t/ha/yr x 0.1 ha x 0.25 yrs = 1.5 tonnes
As this is significantly less than 150 tonnes, this development is considered low risk. Erosion and sediment
control measures should be implemented in accordance with the International Erosion Control Association
(IECA) Best Management Practices (2016), the latest version of the IECA guidelines, Council requirements
and the SPP during construction.
MUSIC Modelling
The MUSIC Model has been configured to represent the additional approved hardstand and the proposed
slab on-ground areas.




                                         Figure 1       MUSIC Model Schematic

The comparison of the runoff volumes and pollutant loads have been compared to as below:

Page 5

                                                                                                                                                                                             Page 5 of 5
Noosa FLC Extension to Existing Gymnasium and Additional Pavements
19 February 2025                                                                                                                                                             Ref. No. 2025.0108




                         Figure 2           Comparison of Runoff Volumes and Pollutant Loads

Table 4        Comparison of runoff volumes and pollutant loads
                                        EXISTING


                                                         DEVELOPMENT
                                                         COMMERCIAL
                                                         CONVENTIONAL


                                                                              PRACTICE* BIORETENTION
                                                                              COMMERCIAL WITH BEST
                                                                              CONVENTIONAL


                                                                                                             NOOSA FLEXI SCHOOL

                                                                                                                                  TANKS
                                                                                                                                  NOOSA FLEXI SCHOOL WITH


                                                                                                                                                                  TANKS + INFILTRATION
                                                                                                                                                                  NOOSA FLEXI SCHOOL WITH

                                                                                                                                                                                            +ADDITIONAL HARDSTAND
                                                                                                                                                                                            TANKS + INFILTRATION
                                                                                                                                                                                            NOOSA FLEXI SCHOOL WITH
 Flow (ML/yr)                    2.9               7.8                  7.6                            4.6                        3.9                       2.0                             2.9
 Total Suspended Solids          160               1300                 270                            330                        300                       150                             228
 (kg/yr)
 Total Phosphorus (kg/yr)        0.19              3.0                  1.2                            0.8                        0.65                      0.22                            0.27
 Total Nitrogen (kg/yr)          2.1               25                   14                             7.3                        5.5                       1.9                             2.5
* sized to reduce pollutant loads by 80% (TSS) 60% (TP) and 45% (TN)

In summary, the mitigated pollutant loads are close to existing level and well below a conventional ‘best-
practice’ approach.
Conclusion
The proposed works are consistent with the original Stormwater Management Plan submitted for
MUC12/0133. Additionally, the erosion hazard assessment has been classified as ‘low risk,’ indicating
minimal environmental impact. The proposed works completed to date and proposed as part of this current
application result in pollutant loads in keeping with the optimum results modelled in the original Stormwater
Report and a significant improvement over more conventional approach.


Yours faithfully,

Vancy Li
Civil and Water Engineer
BLIGH TANNER PTY LTD

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.