04/4078 - COMPILED Decision Notice [As Published] · 132004.4078.04

of 19

Text shows just the words. Original shows the document exactly as it was published.

NOOSA COUNCIL IDAS Development Application Decision Notice                                                        7

Undergrounding Power
37.    The existing overhead electricity wires to the Hastings Street frontage of the development shall be
       redirected underground to help beautify the Hastings Street street scape and aid with the growth of street
       trees. This work shall be at no cost to Council.
Stormwater Drainage

38.    Roof runoff shall be directed to a rainwater storage system or tank (minimum storage 9000 litres) that is
       plumbed to service the toilets and landscaping. The design of the rainwater storage system shall be to
       the satisfaction of the Manager Plumbing Services.

39.    All stormwater drainage shall be collected on site and discharged so there is no net increase in
       stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall be discharged
       to Council’s existing drainage structures in Hastings Street. Plans of the drainage design shall be
       prepared by a Registered Professional Civil Engineer and submitted to Council prior to obtaining a
       Development Permit for Operational Works.

       The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street drainage
       system at any one location is 25 litres/second.

40.    To ensure that polluted run-off does not enter Council’s stormwater drainage system, stormwater run-off
       from the carparking areas and the driveways shall have the first flush (the first 12 mm of rainfall or hose-
       down) collected in a grease/oil arrestor provided on site prior to being permitted to discharge into
       Council’s drainage system.

       All other clean stormwater, such as roof water, can be collected on site and discharged through a single
       underground drain line directly into the existing drainage system, bypassing the grease/oil arrestor.

41.    To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil arrestors, which
       shall be submitted to the Council for approval prior to obtaining a Development Permit for Operational
       Works.

       A Development Permit for Building Works shall not be granted until a Development Permit for Operational
       Works has been issued in regard to the drainage scheme.

42.    All site stormwater drainage shall be by means of a gravity system.

43.    All stormwater drainage lines including inter-allotment drainage shall be inspected by closed circuit
       television (CCTV) prior to commencement of the approved Use.

       CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council following
       satisfactory completion of construction works. The developer will be responsible for the full cost of CCTV
       inspection, including any additional inspection necessary following defect identification and rectification.
       This charge is payable prior to the issue of Operational Works approval and will be determined on the unit
       rate basis current at the time of approval.
Sewer Mains
44.    The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in
       accordance with Council’s standards and requirements at no cost to Council.
Town Water Supply
45.    The site shall be connected to Council’s existing town water supply and be constructed in accordance with
       Council’s standards and requirements at no cost to Council.

46.    Each water connection to the water reticulation system shall extend to the property boundary and be
       metered. Where multiple units including leased buildings are served by a single service, multiple water
       meters to each individual unit or leased building shall be installed. All fees for the supply of water meters
       shall be paid to the Council.




MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@980189b4\@[email protected]

Used in these records

About this file

File size
144 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

04_4078 - COMPILED Decision Notice [As Published].pdf · 144 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.