Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Information Request OPW25 0116 · OPW25/0116

of 2

Text shows just the words. Original shows the document exactly as it was published.

                 Information Required
                 2.     Submit a site-specific CMP, addressing the requirements listed in advisory note 5 of the
                        higher order approval MCU23/0139.01.
                 Item
                 The subject application seeks approval for landscaping works, but no plans/documents have
                 been submitted for this component of the works.
                 Information Required
                 3.     Provide landscaping plans for the proposed development.
                 Item
                 The submitted engineering plans propose the replacement of an existing headwall with a pit
                 inlet. No details have been supplied for this pit.
                 A site inspection by Council officers seems to indicate that the existing headwall is currently
                 performing as a stormwater outlet rather than inlet.
                 Information Required
                 4.     Provide amended plans detailing how stormwater will be managed in this area,
                        including, but not limited to:
                        4.1. Levels for both existing and proposed stormwater infrastructure;
                        4.2. Demonstrating that the proposed design will not create a nuisance by having rain
                             water sitting in a pit;
                        4.3. Details of any proposed elements (i.e. pits, headwalls, etc.).
                 3.     DUE DATE FOR RESPONSE TO INFORMATION REQUEST

                 The due date for providing the requested information is 5 November 2025. Email your
                 response to [email protected]. Please advise Council of your response to this
                 information request in accordance with section 13 of the Development Assessment Rules.
                 If you do not provide a response before the due date, it will be taken as if you have decided
                 not to respond to the information request and Council will continue with the assessment of
                 your application.
                 4.     OTHER DETAILS

                 You can follow the progress of this application online at www.noosa.qld.gov.au. The “Online
                 Services” page can be accessed via "Quick Links" on the left hand side of the screen.
                 Should you have any further queries in relation to the above, please do not hesitate to contact
                 me on the number above.


                 Yours faithfully,




                 Diogo Carrico
                 Engineering Officer – Construction




                                                                                                        Page 2 of 2
Document Set ID: 23977669
Version: 4, Version Date: 05/08/2025

Used in these records

About this file

File size
92 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Information Request OPW25 0116.pdf · 92 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.