5.0 RAINWATER HARVESTING AND RE-USE
Runoff from approximately 7,532m2 (80%) of roofed areas will be directed to
a rainwater harvesting tank to be located beneath back-of-house areas at the
south-western corner of the site.
Captured rainwater will be utilised for landscape irrigation and swimming
pool top up.
Alta Projects have developed a water balance model in eXcel format which
models tank inflow and outflow over a ten (10) year period of historical
rainfall data from 2013 to 2024 at Tewantin RSL Weather Station.
Tank performance was modelled utilising the following reuse parameters: -
• Landscape irrigation = 1.5mm/m2/day
o No irrigation for one day after 1.5mm of rain or more
• Daily Pool top-up = Evapotranspiration – Rainfall
Results appear below in table 5.1
Table 5.1 Water Balance Model Results
By inspection approximately 80% reliability on rainwater reuse for pool top
up and landscape irrigation may be expected with a tank of 300m3 total
volume installed.
Refer Appendix G for full model.
__________________________________________________________________________
A6769/25/SWMP/Rev OpW(A) – Feb 2025
Page 4 of 9
SH/PL
Brah101 Pty Ltd t/as ALTA PROJECTS
Document Set ID: 23646596
Version: 1, Version Date: 21/03/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Approved Plans & Document OPW25-0042.pdfRelated documentApplication case desk ↗
About this file
- File size
- 36.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.