10/0632 - Prescribed Tidal Works - Pontoon - Gympie Tc [As Published] · 142010.632
For all development applications, you must:
Application details—IDAS form
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
Tewantin
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary
information and documentation will result in your application not being a properly made application.
¢ complete this form (Application details—IDAS form 1)
* complete any other forms relevant to your application
¢ provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
Regulation 2009.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au
Loe pe BER a
esponsib\
Name/s (individual or company name in full)
For companies, contact name
Postal address
Contact phone number
Mobile number (non-mandatory)
Fax number (non-mandatory)
e-mail address (non-mandatory)
MOOSA YACHT + RowmWEe Cxrvsh
PEtER CREIGUTON
Pc, Bex 44 ‘
TEWANTIN 45658:
S4#4Q P6002
SET4 1,99
ADmiint
@nyKkE, Com, Au.
i oe
4y
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 45 pages
Page 2
jature’ of development proposed? (tick all applicable box/és) "7 # material change of use of premises [4 building work [F operational work | reconfiguring a lot AP ag, Pg a Oat ee " é anid temporaryenviro on Sept oh 7 we eg LC] Yes—complete table A and then go to question 5 Table A—name of each locat government area in which the mobile and temporary ERA is proposed to operate cation of We Table B—street address/lot for the premises or street address/lot om plan for the tand adjoining or adjacent to the premises L] street address/lot on the plan [A street address/lot on plan for the land adjoining or adjacent to the premises (appropriate for development in water e.g. jetty, pontoon) . an Street address Lot on plan description | Local government area unit | Street | Street name and official suburb/ | Post-' | Ldtio. | Plan type (eg. Logan, Cairns) no. no. locality name code: fot and plan no. , io eo i -| . Guymbie TEeen ed oO) °9/iS9-) nosh HEROS Noor AYE 166 case - | “ 7 (‘29 SP 208 NZ | | (498 | meu 839207 2 Application detaits—IDAS form 1 . - Version 1.0 18 December 2009 ae
Page 3
dredging in Moreton Bay)
iTable C—premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g. channel
Coordinates Zone Datum Local government
(note: place each set of coordinates in a separate row) reference area (if applicable)
Easting Northing Latitude Longitude
SIG 22h L_] space
Els} o3-+ [] wese,
| other
Fiat HR TAN emer cam eh 3
he.premise apartment*building?
tees oe ee eid a ip
ef PoATOON AT F
PROUIS con
ND OF Ex. ST Hw
re,information) Bite
me Yes—complete either table D, table E or table F as applicable
APrRouAW Oy DERM Sea
AtTTKCHED
Table D
Name of owner/s of the land
1/We, the above-mentioned owner/s of the land, consent to the ma
king of this application.
Signature of owner/s of the land
‘
Date
Application details—IDAS form 1
Version 1.0 18 December 2009
Page 4
Table E Name of owner/s of the land [| The owner’s written consent is attached or will be provided separately to the assessment manager Table F Name of owner/s of the land | By making this application, |, the applicant, declare that the owner has given written consent to the making of the application. Ey S e iene the ic enolcaton A tae rim Se Nip ema iy No o Yes—complete table G Table G—state owned resources (provide details for each state resource in a separate table) Nature of state-owned resource Nature of evidence required (tick the applicable box and attach a copy of the [_] _ Evidence of an allocation of, or an entitlement to, the resource evidence to this form) py Tt gs ila ' ; \ i f . 1 say CL] Evidence the chief executive of the department administering the resource is satisfied the development is consistent with an allocation of, or an entitlement to, the resource @ CI Evidence the chief executive of the department administering the resource is satisfied the development application may proceed in the absence of an allocation of, or an entitlement to, the resource mi adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)—complete table H C] on strategic port land under the 7ransport Infrastructure Act 1994—complete table | [| in a tidal water area—complete table J Table H Name of water body, watercourse or aquifer MoosA RiyeR. . 4 Application details—!0AS form 1 Version 1.0 18 December 2009
Page 5
Lot on plan description for strategic port land
Port authority for the lot
Name of local government for the tidal area (if applicable)
Port authority for the tidal area (if applicable)
SUNSHINE Corks T COUNG! EX
t10G L oOCABAR
i ire caants
| (amaeue
eel ag
he re'any. ex jexisting « easements, on: on theipremises: (CBr
a ae
mm
aa
Thor’ ‘Vehiculars "access, Falect
Overland: flow,water
[7 No [| Yes—ensure the type, location and dimension of each easement is included in the plans submitted
ay ema EEO
applicable to't
No—go to question 15
O
Yes
Yes—complete table K and submit with this application the yellow local government/private certifier’s copy of the
receipted QLeave form
(Sadr arn cx
tevybeen pa paid
Table K
Amount paid
Date paid
E, Lor P)
QLeave Project Number (6 digit number starting with A, B,
Uperseded planning.
Sete eager ae ante
ibis app appli
Yes—please provide details below
*
Name of local government
Date of written notice given
by local government
Reference number of written notice given
by local government (if applicable)
Application details~{DAS form 1
Version 1.0 18 December 2009
&
Page 6
Description of attachment or title of attachment Method of lodgement to assessment manager [| By making this application, I declare that all information in this application is true and correct (note: it is unlawful to provide false or misleading information). Notes for completing this form Question 8: Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner’s consent is required under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or include a declaration by the applicant that the owner has given written consent to the making of the application. Owner’s consent is not required for a mobile and temporary ERA. Question 9: Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a regulation may require the application to be supported by certain evidence prescribed under the regulation. Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is tequired to be given, and the evidence required, to support the application. Question 13: The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long service leave levy is payable. The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are prescribed in the Building and Construction Industty (Portable Long Service Leave) Regulation 2002. Question 14: The portable tong service leave levy need not be paid when the application is made, but the Building and Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development permit is issued. Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or agency, on request from QLeave, or can be completed on the Qleave website at www.qleave.qld.gov.au. For further information contact QLeave on 1800 803 481 or www.qleave.qld.gov.au. 6 Application details—IDAS form 1 , Version 1.0 18 December 2009
Page 7
/ é (Oo : /Prvacythe information collected in this form will be used by the Department of infrastructure and Planning (DIP) in accordance with the processing and assessment of your application. Your personal details will not be disclosed for a purpose / outside of the IDAS process, except where required by legislation (including the Right to information Act 2009) or as required by Parliament. This information may be stored in a departmental database. The information coltected will be retained as required by the Public Records Act 2002. OFFICE USE ONLY Date received NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER To Reference numbers [ Council. | have been engaged as the private certifier for the building work referred to in this application Date of engagement Name BSA Certification license number Building classification/s QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable) Description of the work QLeave Project Number Amount paid ($) Date paid Date receipted form sighted by assessment manager Name of officer who sighted the form The Sustainable Planning Act 2009 (SPA) is administered by the Department of infrastructure and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agencies. Application details—IDAS farm 1 Version 1.018 December 2009
Page 8
— - Developmen
Prescribed tidal work—IDAS form 28 _ 0
§ MAY 20
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009) teas ,
~? Tewantin
This form must be completed for development applications for prescribed tidal
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary
information and documentation will result in your application not being a properly made application.
For all development applications you must:
« complete Application details—IDAS form 1
¢ complete any other forms relevant to your application
* provide any mandatory supporting information identified on the forms as being required to accompany [email protected] extra pages if there is insufficient space on this form.
Ali terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009. ae
This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au
aL
Private use Non-privateuse Estimated value of completed works ($)
@ [_] _ jetty, pier or wharf
| mooring pile
| deck or boardwatk
C] boat ramp or spillway
aA pontoon
C] revetment, sea wall or retaining wall
B20, peo- 99°
OOOOOU00
OOWOOOU
EC] other—please specify below
Page 9
. works. in.the Coa. [| No [7 ves-provide details below Engineers name/s Co Hint -ORDAN 7 Organisation name (if applicable) rou Nt NMORDEN + ASSOCIATES, @ Postal address Po. Box 20S TEWANTIN Qe0 ASOS Contact phone number S44 977137 Fax number (non-mandatory) S449 TIt7T2 e-mail address (non-mandatory) @ RPEQ number (or equivalent if interstate) Reference number of all plans to which this certification relates oF / isgo-l @ -"s. Confirm that thie following.mandatory supporting infor Plans certified by a registered professional engineer of Queensland (RPEQ) Confirmation of Method of (or an interstate or international equivalent registered with the appropriate lodgement lodgement professional body) showing: the location (real property description and boundaries) and dimensions of the | confirmed proposed works in relation to the land (including tidal land) that would abut or adjoin the proposed works , vax bat the proposed works in relation to the locations and levels of lowest astronomical LE] confirmed tide, highest astronomical tide, mean high water springs and the coastal management district the slope angles of the beds and banks of the tidal area and the finished tevels of [ confirmed the proposed works : . Written statements or evidence oe 2 Prescribed tidal wark—IDAS form 28 Version 1.0 18 December 2009
Page 10
LIL.
a copy of the certificate of title for the land (including tidal land) that would abut
or adjoin the proposed works
[| confirmed
details of how the proposed work addresses the IDAS code for prescribed tidal
work in the Coastal Protection and Management Regulation 2003, schedule 4A
[] confirmed
details of the largest vessel, if any, to be moored at the structure
12 4 FEeRey,: Pick Oe ~ SEr Dom,
EF] confirmed
[Ynot applicable
evidence that the proposed work will not prejudice the access rights of adjoining
property owners in the form of:
* letters of support from adjoining property owner, or
¢ plans illustrating a water allocation area
[e}confirmed
For applications within a cul-de-sac, a bend in the waterway or other location where the side boun
connect to the work and neighbouring lots are not at right angles to the waterway ,
daries of the lot
@ photos of any constructed neighbouring structures or information about
approved but unconstructed neighbouring structures
[] confirmed
| not applicable
Privacy—please refer to your assessment manager for further ‘details on the use of information recorded in this form.
OFFICE USE ONLY
Date received ob { Ss] (o Reference numbers
The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This form and all
to] 63%
other required application materials should be sent to your assessment manager and any referral agencies.
Prescribed tidal work—IDAS form 28
Version 1.0 18 December 2009
oe es |
Page 11
Sunshine Coast Checklist - Applications Involving Planning
egional Council Assessment and Operational Works Assessment
RECEIPT OF IDAS APPLICATIONS AT: TEWANTIN OFFICE
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter to determine if properly made. (This may not always be possible and can be further checked)
. pe - agate a, FE “fix
1.4. Form 1 required for all application & Forms 2-32
1.1.1 Ensure that the relevant forms are fully completed (mandatory), are current versions and include
payment of appropriate fee. (Do not receipt at this stage)
4.1.2. In the case of an MCU or Op Works below the high-water mark, owner's consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required. .-
“1
4.4.2.2 If the owner of the land is a company, either ACN No, Company name (clearly indicated by
signatory) or Company Seal required.
2. __IDAS'ASSESSMENT-CHECKLIST. vi FE ES a gat, alias a leas [email protected]. Ensure that relevant checklist/s have been completed with regard to referrals
_.(if applicable, not mandatory) es. _- a. == .
2.2 Ensure correct IDAS.Forms are provided where required for referral (ie most common are Form 11 for
Assessable Vegetation, Form 24 for Contaminated land and Form 28 for Prescribed Tidal Works)
SRE_ENVIRONMENTALLY,RELEVANT, ACTIVITIES... wea
3.1. Ensure that Part G is completed if EPA referral is required.
3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application. (Refer Healthly Places for fees)
REQUEST,1O. CHANGE APPROVALD cae ee
4.1 Ensure that relevant items have been checked and/or completed including information regarding
applicant details along with owners consent if not current owner of land as shown on Council records.:
If over multiple properties on one or more sites, consent of Body Corporate is required.
51 Ensure that generally at least 6 sets of the Plan of Development (5 for Reconfi iguration and Operational
Works) accompany the application. In addition ensure that each set is complete.
-§.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and [email protected] INFORMATIONZ:
6.1. Ensure that generaily at least 6 copies of any report accompanies the application (5 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
. capable of reproduction.
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
6.3 Additionally an electronic version is preferred where possible for ease of electronic record keeping
7.1. Ensure that the application fee, as determined from the Council's adopted scale.of fees,
accompanies the application or has been paid.
« Planning Assessment MCU applications; Lot reconfiguration; Prescribed Tidal Works; Operational Work if Jetty
¢ Operational Works Assessment Operational Work not including Jetties
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
T g:\landuse\administrative processes\application checklist.doc
Page 12
{IDAS.REFERRALSAGENCIES, TRIGGERS (Most freque
Pieasetrefer,to, IDAS Checklists forcomplete lis
Department of Main Roads (Concurrence or Advice)
« State Controlled Road
Dept Environmental Resource & Management
Advice
e Acid sulphate soils
e =©Wetlands
e Conservation estate
Concurrence .
¢ Clearing of native vegetation on freehold land
« Environmentally Relevant Activity (for non-devolved Council as EPA)
e Contaminated land
» Environmental Management/Contaminated Land Register
= UXO
» Land recently used as a ‘notifiable activity’
« — Industrial land changed to sensitive uses (eg school)
Coastal related development.
Koala habitat
Queensland Transport (Concurrence)
° Railway
° Public Passenger Transport
Energex or other responsible entity (Advice)
° Electricity Easements/Substations
DIP (Concurrence)
e ~ SEQ Regional plan
VARIOUS
+ TRIGGERS
ape
IRE URCE EN ITLEMENT (State land) **
s ae
Reo Me is vig Bio ht
Department of Environmental Resource Management
For further clarification refer to IDAS Guides prepared by Department of Infrastructure & Planning.-
T g:Manduse\administrative processes\application checklist.doc
Page 13
checklist 1 -6 MAY 2010 (Sustainable Planning Act 2009, version 1.0 18 December 2009) t - ** Tewantin | This checklist applies to the carrying out of development generally. You are not required to complete this checktist as part of your development application, however you may submit the checklist with your application if you wish. The purpose of the checklist is to assist you in identifying: ¢ whether you need to make a development application for the proposed development e ifa development application is required, the relevant IDAS forms you need to complete as part of your application e whether you need to give a copy of your application to any referral agencies. if your development involves a material change of use, reconfiguring a lot, operational works or building work in a declared fish habitat'area, it is recommended that you complete Material change of use - IDAS checklist 2, Reconfiguring a lot - IDAS checklist 3, Operational works — IDAS checklist 4, or Building work in a declared fish habitat area - IDAS checklist 5. if you are unsure how to answer any questions on this checklist, phone or visit your tocal government, or go to the Department of Infrastructure and Planning’s website at www.dip.qld.gov.au. Allterms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning Regulation 2009. This checklist can also be completed online using Smart eDA at www.smarteda.qld.gov.au [7 Yes ¢ To assist you in preparing your application, completing Referral agency responses—IDAS checklist 6 is recommended 12 Dé'you wish the proposed development.to be assessed against a. Superseded. planning scheme?: ** cA L] Yes » You must complete Request to apply a superseded planning scheme—Sustainable Planning Act form 2and give this notice to the relevant local government. Ifthe local government agrees to your request, details must be provided in Application details—IDAS form 1
Page 14
.3:D0és thé proposal involve r required under the: Water A [7 No | Yes ¢ itis recommended that you complete part 2 of this checklist ag Ws Queensland Heritage Ac “under.the [Ano [_] Yes Itis recommended that you complete part 3 of this checklist « Itis recommended that you complete part 7 of this checklist 2 Development application assessment checklist—IDAS checklist 1 , Version 1.0 18 December 2009
Page 15
Brig fe Te dete eit e téd.for comm C] No |* Adevetopment permit is required * Your application must include Removal of quarry material from a watercourse—IDAS form 18 ¢ This application requires assessment by the Department of Environment and Resource Management (DERM). If DERM is not the assessment manager for your application, the role of the agency will be as a concurrence agency and you must provide a copy of the application to DERM | No |* Adevelopment permit is required * Your application must include Removal of quarry material from a watercourse-IDAS form 18 ¢ This application requires assessment by the Department of Environment and Resource Management (DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a concurrence agency and you must give DERM a copy of the application [] Yes 3 Development application assessment checklist—IDAS checklist 1 Version 1.0 18 December 2009
Page 16
OO0 -
nt wi
-2:35ls the developme it:
| Yes |« Adevelopment permit is required
« Your application must include Removal of quarry material from a watercourse—IDAS form 18
¢ This application requires assessment by the Department of Environment and Resource Management (DERM).
If DERM is not the assessment manager for the application, the role of the agency will be as a concurrence
agency and you must give DERM a copy of the application
| No ¢ Prohibited development. A development application for this development cannot be made
Section reference:
« Sustainable Planning Regulation, schedule 3, part 1, table 5, item 1
« Sustainable Planning Regulation, schedule 7, table 2, item 12
e Sustainable Planning Act 2009, schedule 1, item 2
-Qlieensiand heritage place
iption certificate for the propos:
oes
pment.l
tt ga!
Tae
|. deve
ee
[_] Yes |« Adevelopment permit is not required for this aspect of the development
[] No J+ Adevelopment permit is required
« Your application must include Queensland heritage place—IDAS form 3
© This application requires assessment by the Department of Environment and Resource Management (DERM).
If DERM is not the assessment manager for the application, the role of the agency will be as a concurrence
agency and you must provide a copy of the application to DERM
C] Yes |» Adevelopment permit is not required for this aspect of the development
4 Development application assessment checklist—IDAS checklist 1
Version 1.0 18 December 2009
Page 17
Section reference:
¢ Sustainable Planning Regulation, schedule 3, part 1, table 5, item 2
¢ Sustainable Planning Regulation, schedule 7, table 2, item 19
{Part tocal heritages
[aii De any of the following appl
the development is building works to be carried out by or on behalf of the Cl Yes Cl No
State, a public sector entity or a local government
the development is for public housing as defined in schedule 3 of the Cl Yes CI No
Sustainable Planning Act 2009
@} the development is to be carried out by the State on land designated for C] Yes C] No
community infrastructure under the Susta/nable Planning Act 2009
the development is mentioned in schedule 4 of the Sustainable Planning CJ Yes CI No
Regulation 2009
the local heritage place is on an airport lessee’s. airport land under the | Yes C] No
Airport Assets (Restructuring and Disposal) Act 2008
« Ifyou answered no to all of the above, a development permit is required and your application must include Loca/ heritage
place—IDAS form 4
e If you answered yes to any of the above, a development permit is not required
Section reference:
© Sustainable Planning Regulation, schedule 3, part 1, table 5, item 3
e Sustainable Planning Regulation, schedule 3, part 2, table 1, item 1
¢ Airports Assets (Restructuring and Disposal) Act 2008, section 54
for ve
ne: Environmental Protect fection: Regulation 2008
[] Yes | © Goto question 5.3
5 Development application assessment checklist—IDAS checklist 1
Version 1.0 18 December 2009
Page 18
OOO - a "'5.21s the proposeddevelopment jobile-and:temporary environmentally:relevant activity? [] No ¢ No development permit is required. End of part 5 of checklist C] Yes A development permit is required for this development e Your application must include Environmentally retevant activity—IDAS form 8 e This application requires assessment by the Department of Environment and Resource Management (DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a concurrence agency and you must give DERM a copy of the application * Goto question 5.6 * Goto question section 5.8 6 Development application assessment checklist—IDAS checklist 1 Version 1.0 18 December 2009 ae
Page 19
OOO
"IS any part ofthe environmentally-relevant activ
—
. 5
a sewage ERA as defined under the Environmental Protection Act 1994,
section 73AA
a water treatment ERA as defined under the Environmental Protection Act
1994, section 73AA
a dredging ERA
an extraction ERA if the activity is a low impact activity carried out outside
waters and is for specified works or residential complexes in the area
a screening ERA carried out outside waters and the activity is for:
¢ specified works or
e residential complexes
a crude oil or petroleum product storage ERA if the activity is:
¢ for residential complexes and
¢ carried out outside a designated urban area
an exempt environmentally relevant activity as defined under the
Environmental Protection Act 1994, section 73AA(4) in a designated urban
area
e — Ifyou answered yes to any of these questions, go to question 5.8
development application cannot be made
If you answered no to all of these questions, this aspect of the development is prohibited development and a
BN ee ery:
h
NE re erred iad enlaces tierce
@.environmentally relevant:activity.an-
ain Ls ‘ inte
Ry y
ee i Ae
she epee ma iv at caer ee ewe neath, | Ys my
extraction ERA to: be carried-out.in a wild.river
,
pec BF 7 ie fami n
floodplain manage!
@ L] No Je Goto section 5.10
"a low impact activity carried
[Sn ee '
CJ No Prohibited development. A development application cannot be made
7 Development application assessment checklist—IDAS checklist 1
Version 1.0 18 December 2009
Page 20
Seem, APT Rae
jut on.land.to which a a ‘property ty development plan under,
[| No « Adevelopment permit is required
* Your application must include Environmentally relevant activity—IDAS form 8
* This application requires assessment by the Department of Environment and Resource Management (DERM).
If DERM is not the assessment manager for the application, the role of the agency will be as a concurrence
agency and you must give DERM a copy of the application
| Yes
52 ‘Is the ig development’ consistent. with: the:
ee nit ee
Toperty. development plan,
r | Yes |e Adevelopment permit is required
¢ Your application must include Environmentally relevant activity—/DAS form 8
¢ This application requires assessment by the Department of Environment and Resource Management (DERM).
If DERM is not the assessment manager for the application, the role of the agency will be as a concurrence
agency and you must give DERM a copy of the application
Prohibited development. A development application cannot be made
[] No
Section reference:
e Sustainable Planning Act 2009, schedule 1, items 2, 9, 10 and 11
« Sustainable Planning Regulation, schedule 3, part 1, table 5, items 4 and5
e Sustainable Planning Regulation, schedule 7, table 2, items 1 and 24
Age, es omar cepa fit saat,
6.1 Does “the land use‘plan
© End of part 6 of this checklist
« Adevelopment permit is required
¢ Your application must include:
¢ fora material change of use - Material change of use assessable against a planning scheme—IDAS Form
5
¢ for building or operational work - Building or operational work assessable against a planning scheme—
IDAS Form 6 -
e for reconfiguring a lot - Reconfiguring a lot—/DAS Form 7
Section reference:
e Sustainable Planning Regutation, schedule 3, part 2, table 5, items 6 and 7
8 Development application assessment checklist—IDAS checklist 1
Version 1.0 18 December 2009
Page 21
n ‘part‘of:the proposa R within 200 metres of a shipping channel or an entry and exit shipping EC] Yes Cy No corridor for the port within 1000 metres of a swing basin, a commercial shipping wharf, a Cc Yes C] No mooring, anchorage or spoil grounds within 1000 metres of a planned port facility identified in a land use plan C] Yes CI No If you answered yes.to any of the above, then this application requires assessment by the Port Authority for the port relevant to your application as a concurrence agency. You must send a copy of your application to the Port Authority. @: if you answered no to all of the above, then this application requires assessment by the Port Authority for the port relevant to your application as an advice agency. You must send a copy of your application to the Port Authority. Section reference: e © Sustainable Planning Regulation, schedule 7, table 2, items 16 and 17 for the designated purpose [_] Yes L_] Ne carried out by, or on behalf of, the designated purpose Cl Yes C No ah * Ifyou answered yes to any of these questions, end of part 8 of this checklist * 9 Development application assessment checklist—IDAS checklist 1 Version 1.0 18 December 2009
Page 22
ae | [} No | Yes |e This application must be referred to the Queensland Government department administering the Act authorising the development for the designated purpose as concurrence agency Section reference: ¢ Sustainable Planning Regulation, schedule 7, table 3, item 6 L_] No e No development permit is required | Yes |e Ifthe catchment area is in the SEQ region as defined under the Water Act 2000, section 341, the Queensland Bulk Water Supply Authority (trading as Seqwater) is a concurrence agency for the application. You must give this entity a copy of the application ¢ Ifthe catchment area is not in the SEQ region as defined under the Water Act 2000, section 341, the Department of Environment and Resource Management is a concurrence agency for the application and you must give DERM a copy of the application : Section reference: e Sustainable Planning Regulation, schedule 7, table 3, item 4 et epg oe 10 Development application assessment checklist-I0AS checklist 2 Version 1.0 18 December 2009
Page 23
‘the! Susiainable'Pla
a a
C] No |« End of part 10 of checklist
CJ Yes |e Adevelopment permit is required
e The Department of Employment, Economic Development and Innovation (DEEDI) is an advice agency for this
application and you must give DEEDI a copy of the application
Section reference:
¢ Sustainable Planning Regulations, schedule 7, table 2, item 27
Privacy—please refer to your assessment manager for further details on the use of information recorded in
this checklist.
Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that the information contained on this checklist
and provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on
the information without first making your own enquiries regarding the interpretation and apptication of the
applicable legislation to your circumstances.
de.
To the full extent permitted by law DIP expressly disclaims alt liability (including but not limited to liability for a
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or :
other consequence which may arise from your reliance on this process and the information contained on this
checklist.
OFFICE USE ONLY
@ Date received Reference numbers
The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.
Development application assessment checklist—IDAS checklist 1
Version 1.0 18 December 2009
it
Page 24
Author: Charmaine Duke File / Ref number: 2010/001678 Directorate / Unit: State Land Asset Management Queensland 7 Government ~-—=~ Deparment ot Environment and Resource Management Phone: (07)54512243 8 April 2010 Attn: Peter Creighton Noosa Yacht & Rowing Clu! PO Box 49 ‘ TEWANTIN QLD 4565 Dear Mr Creighton RE: APPLICATION FOR RESOURCE ENTITLEMENT — LOT 100 ON SP208113, NOOSA YACHT AND ROWING CLUB Reference is made to your request for evidence of resource entitlement required to accompany your development application for proposed construction of pontoon to be provided at the end of the eastern-most jetty. | wish to advise that the proposed development is consistent with an allocation of, or an entitlement to, the resource. A copy of this letter is to be attached to your IDAS Form | as the required evidence for Table G. : Although evidence of resource entitlement to your development application has been provided, you are always required to comply with the purpose, terms and conditions of your “tenure” over Lot 100 on SP208113 and undertake works only if and when the development application has been approved by the assessment manager, and in accordance with the conditions of that approval. You will also need to comply with all other legislative and regulatory requirements which may also include approvals that are not part of the assessment of the development application under the Sustainable Planning Act 2009 (SPA) e.g. a marine park permit if ina ‘marine park. Further, please note that the above evidence will expiry on 8 October 2010. Should the ‘ development application not be lodged with the assessment manager prior to this date, you will be required again to lodge the IDAS Form 1 and any attachments with this Department with a further request for evidence of resource entitlement - any further request will need to be reconsidered by the Department. Office : Postal : DERM Nambour DERM Nambour Floor t, Centenary Square PO Box 573 Currie Strcet Nambour Nambour QLD 4560 4560 QLD Telephone : (07)54512215 Fax: 54512262 ol ee fee spot oie
Page 25
——————<————— — ~~“ + - a I would also like to advise that any land use activities must comply with the 4boriginal Cultural Heritage Act 2003 or the Torres Strait Islander Heritage Act 2003 Finally. providing evidence of resource entitlement is required under SPA to enable your application to be considered properly made for lodging with the assessment manager and is a completely separate process to assessment of the application under SPA. Accordingly, the Department may act at a later date as assessment manager, concurrencé/referral agency, or advice agency in the assessment of the development application - providing evidence of resource entitlement will not influence any statutory role the Department may have in this assessment. If you wish to discuss this matter please contact Charmaine Duke on (07)54512243, All future correspondence relative to this matter is to be referred to the contact Officer at the address above or by email to [email protected]. Any hard copy correspondence received will be electronically scanned and filed. For this reason, it is recommended that any attached plans, sketches or maps be no larger than A3-sized. Please quote reference number 2010/001678 in any future correspondence. Yours sincerely Renee Grant Senior Land Officer A duly authorised delegate of the Chief Executive under the current Land Act (Chief Executive) Delegation rm qe
Page 26
7 April 2010 Noosa Yacht & Rowing Club INC PO Box 49 Tewantin Qld 4565 Dear Sir Queensland Government Department of Transport and Main Roads Operational Work, Prescribed Tidal Works — Request for comments Pontoon — Noosa Yacht & Rowing Club INC, Lot 100 SP208113, Noosa River, Noosaville. Thank you for your letter of 26 March 2010 about your proposal to construct a pontoon at the location mentioned above. As a concurrence agency, Maritime Safety Queensland has no objection to the proposal provided the following navigation and marine safety conditions are complied with. 1. The contractor must build the pontoon according to JNA, drawing 09/159-1, attached to your letter dated 26 March 2010. 2. No part of the structure or any ship berthed at this structure is to come closer than |.Smetres from the side boundaries of the allocated water space as shown on the submitted water allocation plan. 3. The pontoon and all freestanding piles must be lit and clearly visible to approaching vessels. The contractor must position all lighting so it does not cause a risk to the safe navigation of other vessels. 4. The applicant or his agent is responsible for the removal of any existing structure above or below the waterline, and must contain and remove any debris. Any pile that needs to be removed must be totally extracted. 5. The ship moored at this pontoon must follow the most direct course from this structure to open waters and a similar direct course when returning to this pontoon. Department of Transport and Main Roads Maritime Safety Queensiand Marine Operations (Brisbane) MacArthur Avenue East Pinkenba Queensland 4008 710/01702(1) P40773 E36504 E36661 F8 James O’Connor Telephone +61 7 3860 3504 Facsimile +61 7 3860 3571 www.msq.qid.gov.au james.b.o'’[email protected]
Page 27
na ~ ON The owner is to ensure that the ship berthed at this structure must maintain sufficient under keel _ clearance at all stages of tide. The ship must comply with any loca! restrictions placed on channel depths and draft restrictions. cr 7. Any ships and equipment you or your agent use must comply with the Transport Operations (Marine Safety) Act 1994, the Transport Operations (Marine Safety) Regulation 2004 and the Transport Operations (Marine Pollution) Act 1995. 8. Any ships using this structure must comply with the Transport Operations (Marine Safety) Act 1994 and the Transport Operations (Marine Safety) Regulation 2004. 9. Any ship moored at this pontoon must not impede the safe navigation of other ships or restrict safe access to or from neighbouring structures. 10. Any ship, dry berth or device (including Air Lifting Pontoons) berthed, moored or attached to the pontoon must not exceed the following sizes: No vessel berthed, pick up and set down only. Wet Berth Dry Berth N/A N/A pn lS Hie 1t. The contractor must construct the pontoon within two years from the date of approval. If construction is not completed, you will need additional or amended comments from the Regional Harbour Master. ve - Maritime Safety Queensland does not need to be further consulted if all of the above conditions are met. : The above conditions must be included in your application to the assessment manager. This agency will also forward a copy of this letter to the Assessment Manager. Yours sincerely Zo ret 7 x Sines? Me af f Yor Captain Richard C Johnson ~ Regional Harbour Master (Brisbane) Page 2 of 2
Page 28
PROPOSED 7.0m x 3.0m PONTOON BY OTHERS . ‘SET Bowws Pek ve onbhy a REALPROPERTY DESCRIPTION LOT 100 $P208113 1 CANCELLING PART OF USL, BEING PART OF THE NOOSA RIVER ADJACENT TO LOT 166 on MCH839217 PARISH TEWANTIN COUNTY MARCH EXISTING JETT NOOSA TEWANTIN YACHT chn Nord, DRAWN iy orden . & ROWING CLUB eH a Assoxiates ee PRPOPSED PONTOON | RSP sncasziouoasrin rea | SITE PLAN = > LOT100.. Steffen a ewe en oe 1-200 NOOSA RIVER BR, Towers a5 NOOSAVILLE rar suarierracorsueri72 | = OA] 5Q.4 [email protected]
Page 29
1 AS S80G
POLLO Ob
7G Hic MINIMUM OF
WGine: CENTRES IN TACK QiRE
mn WARS AT
fON UND,
NUM WORK 1G ©
BUTT MtLos to er
OF ALUMINIUM IN CONTACT WHT CONCREIE
ATEO WHEE ZINC CHROMATE PRIMER
Mt ENT
FLOTATION FO COMPRISE. OF CRADE SE LXPANGED
POLYSTYRENE FOAM WITH APPROVED PROICIVE
COATING 1
> 100mia THICK CONCRETE SLAR /
CALY. G445A STEEL MESH L
40mm TOP COVE J
A 2mm impecvious layer of high
density polyethelene will procect
the foam fram saln water ingress
or attack fron marine organisms.
Koon is stable ot all mes,
Pe ce fice! hve lead of 0 5ERS
fis Wisk butect over half the mci th,
ofthe pontoon wwict ove the mastlevicsy,
there 1S aot hss phan Mmmof a
PES Ove beregemey. \
i
'
}
i
\
Or PRE / MOCRING CLEATS Py a
I oF / | ' J FALE GKACK,
ditto === SSS ER oct eee Leh} .
[ FOAM FLATATION UNIT e FOAM FLOTATION UNI | | ‘
TT I ~ | |
END ELEVATION
BNE! STANDARD PCNTGON GETAI
s-a-qq] Deleted “Cotvalic
Ik JETTY’ SPECIALIST
MOL r PHONE 074~4
MOBILE 0418 7:
Hee aeRO & SAKE 19 GereO 4a
FA RROD A PME DE tae
SION ewan eas OF
MC ae SAK
~~" leneexto:
te frvuda—, PER >uby
OLD. AUSTRALIA 4475
M_ ARROWS MILE
Teena ae
Page 30
oy
Page 31
h
of
Sheet
‘7
oe . 5
To ee HF ZOE ol
BO mo
s
z
tag
- 4
setagay
(4920M 4apUf)) paysow you 9/-G SAS
ol Od! §=606
Tt T T
"s8J}9; Ul aso S4U6US7 — OOO! :I Pr
os 04
TT
02
oi
Poe ae “$2668! QUOD UI Ma1D5 g
43104 S821NOS3Y Josnjon fo j49UssD08Q 94) . PGo1Z : QUOD UI MAINS 8
YW EBBEHOW Woy paydwor uoyouuosu! /CUIBLIQ 66026 SEBPHOW alo Z
. , ; , |, 2O2IOZ ‘ Pf QUOD UI MaI25 9
: i Ebof02 | | 2409 uw masos 9
LEZEO! | €-O6/ - Aeo6E! i E€082/ ISEROE AY MBIIS O co
SELEO! CEP IE! | GEESE! B9LEL1AS LloGél 9SZFO6dIY BU0D MAIIS OC 2
FEZEO! ° YS 20 - 69LELIAS ' A00€9 - EBBEHONW oO c
69961! | COEE 12O006L en | #,0¢.S20SE EBECHOW /(6) /
ON LSIC | }. ONY IG MOO 1 INTAV IG Ol ALS
SURVEY PLAN
Land Title Act 1994; Land Act 1994
Form 2! Version 2
SHYAVWANINVWHIdD
18}/8YS
Ue
ips 2uopg
UE MBIIS,
2
WO ON
moa, oO
<5 : 0
°
©
&
96-9.
£0098 *
bIO-E ©
. oc ~ =. OFSLI
ay
5
1, | LI@6CBHON
“99/
6/S6FBHIN
G 98097
bt Bae
” a aoe "90098
os Ct”. 696-2
OreS8 “oF cee
SHYVW oe
{oot wiocse
Ov Hol 92}
2/09
2/09
2/02
ESSEHOW UO xOW 49104 YBIH O YIM
[OYUEPIFUIOI-840-S}.UIOd-WHH.O
B2L-01 | +SG.F00LGE
EPEO2 | #G1-GG09SE
226-61 | OFG10892
4S10_| ONSVIG
SLNIOd WMH D140
V F79VL
18:05 |,0€bZol92 | B-
8-8 |.05,.200982 | L-
651-82 | «GE,90068. | F-
COP IL \ OZ 6ELLE | I~
S9-0L2 |OF.SZeS92 | E~
1Si0_| ONISV7g INT
69LELIAS .
(240d) $9).
Pi Ned NO
QLI SFISYH Vel
WdIO +
1000
STANDARD
A
SP 208113
Ptan Status:
Stote copyright reserved.
f
150 [mm
Scale:
Format:
No
FAN's:
1
100 [mm
‘COUNTY: March
Plan of Lot 100
Cancelling Part of USL, being part of the NOOSA Rl VER
_adjacent to Lot 166 on MCH8392/7
Vide SP!73769
-TEWANTIN
PARISH:
Meridian:
Ca rol Surveyor
y was performed in accordance with the Survey
pian was surveyed by me personally and that the plan is accurote,
that the said surve:
1, Dovid Harvey LAU hereby certify that the land comprised in this
ond Mapping Infrastructure Act 2003 ond Surveyors Act 2003
ond asaociated Regulations and Standards and that the said
survey was completed on [2.02.2008
YB/cB
| Cate
Page 32
a “INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008 Company/organisation name (if applicable) aT SA YACHT Ans 9 Roy DING Cev 4 = Individual applicanContact person (if there is more than one applicant. provide additional applicant details on an attachment to this form) First name PETER Lasiname | REL eS (4 ped. @ Postal address P.0 Box 49 TewAwe tim 4c OV | Contact telephone number S449 y G ©) “dh || Mobile phone number Facsimile number se #10 e-mail address Adpt: J @ WHY &C, COM. Aw Title Details of the prémises flo. the land « im af the-end ‘of the foc ni) 1. Identify the premises by completing Table A, or Table B andjor Table Cc (ensure adequate information is given to identify the premises) Table A If the application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then go to Q2. L OR Table B Street address for the premises (tick applicable box/es below and insert property description in the table identify gach lot in a separate row j the mobile’ and temporary-ERA is proposed to operate” [1 (i) [7] Street address / lot on plan for the premises (Appropriate for most applications including building applications): OF (ii) Xj Street address Alot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water e.g. jetty. e@ pontoon etc) (Note: Loton plan details may be obtained from tile decumenis, a ‘Rate’ nolice, or from the local government} Unit | Street No. No. 5 " : t : a a 1 4566 100 SP208113 Sunshine Coast Regional Council AND/OR Table © Coordinates and/or a map of the premises (Appropriate for development in remote areas, over part of a Jot, in water (e.g. channel dredging in Moreton Bay) alc.) Easting : T 2 i : . 1 [_j oGoas4 7] wesea (J Other - 2. _ Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: In most instances, the premises will not involve any of the following characteristics. however some applications may involve one or more of ihese characteristics - complete only if applicable)
Page 33
4
es INTEGRATED PLANNING ACT 1997 Part A. Version 3.1, 3 March 2008
Table 0 Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river. creek. lake. canal)
| Name of water body, watercourse or aquifer (If known) a
| 1 | Noosa River
Table E Complete if the premises are on Strategic Port Land under the Transport Infrastructure Act 1994
Lot on plan description for strategic port land Port Authority for the fot
[i
Table F Complete if the premises are in tidal water
Nanje of local government for the tidal area Gfappticable) "| * “ “Name of port authority for. the tidal area (if applicable)
| 1 Sunshine Coast Regional Council
3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may inchide fand both above and below water)
Tolal area of premises *
@ oO m? [_] hectares (Tick applicaite unit}
Existing use of the prainises Bape lee OR
4. — Current use/s of the premises: /e.g. vacant land, house, townhouses. apartment building, shop. service station, school, sugar cane farming etc.)
| 4 2 existing approved timber jetties
5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overtand flow, water etc.)?
X No O Yes — Ensure the type, ovation aad dimensions of each easement are inchided in plans, submitted with the application
Proposal details
6. Brief description of the proposal (e.g. 6 unit apartment building, 30 lot residential subdivision. a bore, aquaculture}
New Pontoon off the eastern side of the existing eastern timber jetty head for the Ferry to load and unioad passengers.
7. Does the poposal include new buildings or operational work (including any services) on the premises?
oO No Yes - Ensure the nature. location and dimensions of the proposed works are included in ptans, submited with the application
e@ Resource entitlement (if applicable), - further information is prowiled in the’ advice section at the erid of the fori
8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land (leased and freehold). declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)
J No - Gale GY 4 Yes - Conplole fable G - provide details for each evidence required on a separate row, if applicable. Evidence of rescutce
éliccation or eutiiersent mus! be submitted with the application, You do vot need to answer O9 - yo io the next section.
Nature of State-owned resource , oe ; /
oe : .} 2. Land subject to a lease {including a freeholding tease}, or a reserve or deed of grant in trust,
under the Land Act 1994— (a) if the lessee or trustee is not, or does not represent, the State;
and (b} other than to the extent that item 17 applies to the Sand
Evidence the dept administering the Land Act 1994 is satisfied the development is consistent with an
: a .
Table G Nature of evidence required | on cation / enlitiement
Allocation/entitiément } Name of authorising j Position of authorising|’ State-Government Date of | Date of
reference number officer _ Officer Department issue expiry
Page 34
4
@ INTEGRATED PLANNING ACT 1997
Part A. Version 3.1, 3 March 2608
Quwner's consent (if applicable) - fuither information is provided in the advice section al the end of thetonn ~
9. Complete Table H for applications involving a materiai change of use: reconfiguration of a fot: work on land below high-water mark and
not within 2 canal as defined under the Coastal Protection and Management Act 1995. or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner on @ separate cow. or an an atlachmeni to this form df apphcable
Premises.Qwners name/s_
and posial address
fe H
" Details of the premises owned .
(street address or lof on plan description)
Owner's signature*,
Date consent |
was obtained
* Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. if the owner is a company. 5127 of the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the IPA website .
Table |
Part P
Checklist
Plans
John Norden 09/159
Title search
SP Plan
Tenure
Harbour Master Letter
col SIT ml oan] &} atin]
Resource Entitlement
Portable Long Service Leave (PLSL) levy (applicable for certain’
construction siork valtied over $80,000 caly).
10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: ( Tick bax if applicable)
{J the application seeks a preliminary approval only;
(_] the application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes: land clearing, site preparation. earthworks, fences, fodder harvesting. clearing of encroaching vegetation. clearing of
regrowth, thinning vegetation or controlling weeds or pests}: .
OX] all costs, that relate to the work both directly and indirectly, are tess than $80,000, inclusive of GST: or
(1 the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 -
Complete and submi a Gleave Notification and Payment Form (no payment required if owner-builder pennit number stated). The receipled form musi be
Siohied by the assessment manager before a devefopment permit car: he given.
11. is payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information}?
DX] No - End ot Pan a
(1 Yes - Answer 01? below
OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier} (Optional)
Fee ($} Date received
Receiving officer's
name
Reference
numbers
NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER
To: [
Council. | have been engaged as the private certifier for the building work referred to in this application.
Date of
engagement
Name |
"BSA Ceftifcation nunibér
Building dassification/s
Page 35
wt INTEGRATED PLANNING ACT 1997 Pari A, Version 3.1, 3 March 2008
Name of officer who sighted the
Description of the work : QLeave Project Number... a
: ve assessment form
manager
Hi
Privacy Statement
The information collected on Form 1 will be used by the Department of infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for a pumose outside of the IDAS process. except where required by legislation {including the Freedom of information Act 1992) or as
required by Parliament. This information may be stored in 2 DIP database. The information collected will be retained as required by the Public Records Act 2002.
Advice for completing Part A
General advice
. Part A of IDAS Develapment Application Form 1 must be completed and accompany all development applications. The applicant is responsible
for answering all questions fully and correctly, untess following a response there is a statement to go directly to another question. The
Assessment Manger may refuse to receive an application that is not properly made.
° The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the
Building Act 1975 only, i.e. those applications requiring the completion of Parts A and B only.
Applicant details
. {f the applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided
under the IPA.
Details of the premises
. The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a Duilding or other
structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land.
. Details of the and are not required if the application involves a mobile and temporary Environmentally Relevant Activity only. Instead complete
Table A.
. The premises may be identified in a number of ways --
* Street address and lot on plan are most common and will apply to most applications.
+ Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small
development site distant from property boundaries on a large {ot. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other
(specified) datum such as Zone Reference or GS84 may be provided.
. The definition of ‘water body’ and ‘watercourse’ can vary from Act to Act.
. StrategicPoriLandis within a local government area but a local government's planning scheme does not apply anStrategicPortLand.
StrategicPortLandis declared under the Transport infrastructure Act 1994. For further information go to IDAS Guide 11 (Developmenton =
strategic port land) and the Queensland Transport (Ports) website.
> “Tidal water’ is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidat area’ for a local government and for strategic
port land is defined in the IPA {schedule 10}. Generally. the area below “high-water mark’ (defined by the Coastal Act in relation to high water
mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a focal government's area unless
provided for under the Local Government Act 1993. Unless otherwise provided for by tegislation, a local government has no jurisdiction below
high water mark. A tidal area for sirategic port land is within the jurisdiction of the relevant port authority, while the Environmental Protection
Agency generaily has jurisdiction for a tocal government tidal area. However, the (PA gives local governments jurisdiction for assessing and
deciding applications for prescribed tidal works within the focai government tidal area, and the planning scheme may be applied to that
assessment (to the extent provided for in the code for prescribed tidal work).
Resource entitlement
. Section 3.2. 1(5) of the IPA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a
prescribed State resource. Schedute 10 of the integrated Planning Regulation 1998 (IPR) prescribes the Stale resources, including State-
owned land. where evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning
. For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same
time as the request for resource entitlement. and the Department of Natura! Resources and Water will accept the application as properly made.
. For State-controlled roads, a resource enlittement is not required for an activity that is exempt ancillary works or encroachment {identified by
gazetle notice under the Transport Infrastructure Act 1994, section 50), or if the activily requires referral to the Department of Main Roads.
. Evidence may be required from more than one Deparment responsible for a State-owned resource. e.g. from the Environmental Protection
Agency for quarry material below high water mark, and the Depariment of Natural Resources and Water in relation to the State-owned land
above high water mark.
a
Page 36
oe INTEGRATED PLANNING ACT 1997 Part A. Version 3.1, 3 March 2008 Ownei's consent Section 3.2. 1(3} of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s. if ihe application involves: a material change of use: reconfiguration of a lot; work on land below high-water mark and not within a canal as defined under the Coastal Protection-and Management Act 1995: or work on rail corridor tand.defined under the Transport Infrastructure Act 1994. Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during the processes of the application or in the event of an appeal about the outcome of the application. “Owner for the purpose of a lodging an IDAS development apptication means ihe person at the time of lodging the apptication, entitled to receive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent). Templates are available from the IPA website far the provision of owner's consent as an attachment to this form. However other documentation may be used for providing owner's consent provided it is clear the documentation relates to the development application for the premises. Owner's consent. if required. must be provided even if the appticant is the owner. Owner's consent is not required for a mobile and temporary ERA. Portable Long Service Leave (PLSL) Levy The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the building and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To fund the scheme, a Portable Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out inQueensiand. The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the Building and Construction IndustryTrainingLevy. The Building and Construction Industry (Portable Long Service Leave} Act 1991 (PLSL Act) defines the building and construction work subject to the PLSL levy and includes renovating, retocating. constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties. pipelines. fences or earthworks, and works for subdividing, irrigating or draining land. The PLSt tevy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may be issued The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and Construction Industry Notification and Payment Forms are available from anyQueenslandpost office or agency. on request from QLeave, or can be completed on the QLeave website at www.qleave.qld.gov.au. For further information contact QLeave (Tel: 1800 803 481 Web: www.gleave.qid.gov.au )
Page 37
x .
ANTEGRATED PLANNING ACT 1997 Part P, Version 2.1, 3 March 2008
Prescribed tidal work
Nature of the prescribed tidal works . 4
i. What is the nature of the proposed prescribed tidal work and the type of approval sought? { Tick applicable box/es)
:.,.Nature of use...“ | Estimated value of. by e of ar roval ' ht
(Tick eppiicable. Box)-| » completed works ($) |_| 'YP® 9! aPArOval soust
Private use ‘
OW Jetty. pier or wharf 0 .
(J Non-private use
.. , (Private use
if Boat ramp or spillwa’
C) Wi p or spliway (J Non-private use
7 ae (7 Private use
iti Mooring pile Development Permit
CI] oP (J Non-private use bg
Private use imi
C) (iy) Deck or boardwalk Cl . CL Preliminary approval
C Non-private use
(_] Private use
X] (v) Pontoon .
&X] Non-private use
_ Private use
CE wi) Revetment, sea wail or retaining wall O
(J Non-private use
vii er (e.g. abutment, basin. bridge. breakwater, dam, rivate use
(vil) Oth Privat
O
dock, dockyard, embankment. aroyne. pipeline or other .
underground service elc.) - Provide details below ( Non-private use
2. Is the application within a cul-de-sac. a bend in a waterway or other location where the side boundaries of the lot connected to the
work and neighbouring lots are not at right angles to the waterway?
x} No
CO Yes
‘haut. with the application. pholos of any consitucted neighbouring Structures, oF tiformation about approved but uacoastructed
UFNg StruChHes.
Adicining property access and evidence of support oo.
3. Is the application supported by evidence that the proposed work will not prejudice the access rights of adjoining property owners?
(J No Yes - Compiele O3(a}
3(a) What is the nature of the evidence?
{_] Letters of support from adjoining property owner - Sumit. with the application. the letiers of suppod
{X] Plans illustrating a water allocation area - Submit. with the application, the glans iltsirating the water aliacation area
Page 38
INTEGRATED PLANNING ACT 1907
Kartification
4,
Part P. Version 2.1, 3 March 2008
Has a Registered Professional Engineer of Queensland (RPEQ) or.interstate equivalent certified that the works comply with the design
and saiety provisions of the State IDAS code for Prescribed Tidal Works contained in the Coastal Protection and Management
Regulation 2003?
O) No
[KX] Yes - Srnvide details below
Name of RPEQ or equivatent : John Norden
RPEQ No. or equivalent °
Contact mailing address . “1PO Box 205 Tewantin 4565
Contact telephone number
07 5449 7137
Contact facsimile number”. .
07 5449 7172
Reference number of all plans to which this cettificati
09/459
Mandatory information
5. Confirm the following mandatory information accompanies this application
Confirmation ot -Method of lédgement
. lodgement ..} : ny
Plans and written documentation’ eh sg heel yee :
(i) The location and dimensions of the proposed tidal work in relation to the lot/s abutting the proposed 4 Confirmed
work and the tidal land on which the work is proposed to be located
(ii) Allother structures on the waterfront and within 20 metres of the proposed works & Confirmed
(iti) The current location of Lowest Astronomical Tide (LAT), Highest Astronomical Tide (HAT) and [Confirmed
Mean High Water Springs (MHWS)
(iv) The slope angles of the beds and banks of the tidal area oO Confirmed
(v) Details of the proposed work in accordance with the IDAS code for prescribed tidal work in the
Coastal Protection and Management Regulation 2003, schedule 4A (e.g. physical appearance, lighting, Confirmed
signage, earthworks, public access. infrastructure. structural components, engineering design standards)
(vi) The finished levels of the proposed works (J Confirmed
(7) Confirmed
(vii) Details of the largest vessel, if any, to be moored at the structure
Not applicable
(ui) Evidence thal the proposed work will not prejudice the access rights of adjoining property X Confirmed
owners [_] Not applicable
OFFICE USE ONLY
Date Received Reference Numbers
EPA cost code | 433061
Page 39
INTEGRATED PLANNING ACT 1997 Part P, Version 2.4. 3 March 2008 -Advice for completing Part P General advice Part 4 must aiso be completed for all IDAS developmeni applications. The applicant is respcnsibte for answering alt questions fully and correctly. unless following a response there is a statement to go directly to another question. When paying fees to the Environmental Protection Agency dy electronic funds transfer (EFT) use the process from the information sheet Electronically paying fees to the Environmental Protection Agency (EPA) and attach the form Electronic Funds Transfer (EFT) payment notification to the application. For further information about completing this form go to: . i ide. 24 (Prescribed tidal work} . E website . EPA Guidelines and procedural guides Qi A development permit authorises development to occur. while a preliminary approval is a step in the approval process and does not authorise development to occur. Q4 4 Regisiered Professional Engineer of Queensland (RPEQ}, or the interstate equivalent, may certify that the proposed work complies with the design and safety provisions of the IDAS code for prescribed tidal work in the Coastal Protection and Management Regulation 2003. schedule 4A. The provision of the certification may reduce the applicable fee for assessment of the work by the local government. + ua
Page 40
INTEGRATED PLANNING ACT 1997 Answering the following questions will assist you in determining which sections of the checklist must be ‘completed for your application if unsure. phone or visit your local government or log onta the DIP website www.dip.aid gov.au for help For all IDAS development applications (excent those for building work requiring assessment against the Building Act 1975 only} - complete Section 1 of this heation 1S for & moieral change af use, VEUNBNE 2. Advice Agency. checklist Does the application seek approval to make a material change of use of the premises? CiYes }K)No ifyes -compleie Section 2 of ttus checklist Does the application seek approval to reconfigure a lot? li yes - compinte Section 3 of ihis checidist and Part F of IDAS Application Forni 1. If the premises are completely within a single |] Yes |XjNo local government area assessment is by the iocal government. Does ihe application seek approval to carry out operational work? if yes - complete Section 4 of this checkist Yes |LINo Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? Clves |p1No 'f yes - complete Section 5 of this checklist Have you received a referral agency response under section 3.3.2.0f the IPA. in relation to this development application? if yes - complete Saction § of this checklist OYes iXJNo Does ihe application seek approval to carry out building work requiring assessment against a local government planning scheme? (Yes iXNo Hi yas -campleie furm } Part € of IDAS Appiication Form 1. Assessment is by the local government. Does the application seek approval to carry out building work requiring assessment against the Building Act 1975? if yas - go io Appendix 1 of this checktist for advice on binkling referrals Complete Part 8 of IDAS Application Form 1. ClYes |KINo Assessment is by a building ceriifier Go you wish the application fo be assessed against a superseded planning scheme? yes cemplefe For 1 Atachment | ClYes |BNo Is the application for development completely or partly on Cairns and Mackay airport land under the Airport Assets (Restructuring and Disposal) Act 2008? s+ $ apartment of init CYes |No
Page 41
IDAS Assessment Checklist, Version 22 ve HERITAGE LiA Is any part of the proposal intended to be carried cut on a Queensland heritage place under the Queensland Heritage Act 1992? “ No-Gotes1@ = [-] Yes 1.48 Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of the Queensland Heritage Act 1992. other than if the place is on Cairns or Mackay airport land? [X] No-cetoar2 = (J Yes REMOVING QUARRY MATERIAL; WILD RIVER AREA. 0 DY 8 Se 7 1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000? [X] No-Gotoor3 © [_] Yes ENVIRONMENTALLY. RELEVANT ACTIVITY; WILD RIVER AREA. ° 13 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity? EX} No-Gowor4 (_] Yes nove WITHIN THE LIMITS OF A PORT 14 is any part of the premises within the limits of a port under the Transport infrastructure Act 1994? No - Goto 01.5 (1) Yes DECLARED FISH HABITAT ARE 15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994? &) No -Goio 1.6 Cl Yes - If answers fo questians in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule 8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Advice Agency. rete bey COMMUNITY INFRASTRUCTURE: ° 16 Is any part of the premises designated for community infrastructure? No -Goto0i.7 (_] Yes WASTE WATER MANAGEMENT a Does the proposal involve the establishment or expansion of a waste water disposal system? DX] No - End of Section 1 oO Yes
Page 42
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
PLANNING SCHEME ae _— SoS, ee ke
44 ls the proposed operational work assessable under any State planning regulatory provisions?
X}No [] Yes
If no, is the proposed operational work assessable under the planning scheme?
EX] No - Goto nae [] Yes - Compteie Form i, Pant E and answer Qs 1.1 - 4.1 7 below
ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL OEVELOPMENT IN.A WILD RIVER
AREA foes .
4.2 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
XJ No -Gomor3s [7] Yes
KOALA CONSERVATION (Inisidé SEQ urban footpririt)
4.3A Is any part of the premises in an interim koala habitat protection area?
Bq No -Getooa3a [7] Yes
VEGETATION CLEARING; KOALA CONSERVATION
4.38 Is any of the proposed operational work for the clearing oft native vegetation to which the Vegetation Management Act 1999
applies?
No -Gotoa44 ((] Yes
TAKING OR INTERFERING WITH WATER; WILD RIVER AREA Mea EE =
44 's any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000. section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
&X No - Goto 04.5 | Yes - Answer fa) and (b} below
45 \s any of the proposed operational work for any thing constructed cr installed that allows, under the Water Act 2000, for taking or
interfering vith artesian water (other than using a water truck to pump water)?
X No Gu to 04.6 Ct) Yes - (Complete Fon 1. Part K,) This application requires assessment by the Department of Natural Resources and Waler
INRW) HENRY Wis net ihe Assessment nt Manager for ihe apontication, the agene y has jurisdiction as Concurrence Agency.
46 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000. for taking
overland flow water (other than using a water truck to pump water}?
IX} No -Gotoat7 [7] Yes - Answer fa) and (b} below
tyes dene pba.
47 Is any of the proposed operational work for any thing constructed or installed that allows. under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
x] No -Gocoag [[] Yes
48 Does any of the proposed operational work for any thing constructed or installed that allows. under the Water Act 2000, far
interfering with overland flow water (olher than using a water truck to pump water)?
IX] No -satnong [7] Yes - Answer inna (a) and (b} below
Page 43
INTEGRATED FLANMING ACT 1997 IDAS Assessment Checklist. Version 22
. be
49 Is the proposed operational work for the following?
og — ; — _ —— _—
() For the construction of a referable dam as defined under the Wafer Supply (Safety and Reliability) RM No 1 Yes
Act 2008 a
(ii) To increase the storage capacity of a referable dam by more than 10% & No [] Yes
Rescurces and
iction as
\f yes to either or both (i) or {ii} above - ‘Complete For 1, Part Ks) Thus application requires assessment by ihe Department of Natur
Water (NEW). NRW is not ihe Assessment Manager for the application, the agency has j
Concurrence Agency
TIDAL WORK; WILD RIVER AREA
4.40 Is any of the proposed operational work tidal work, other than excluded work defined under the [PA?
oO No - Goto 04.11 Yes - Answer (a) and /h) below
(a) Is any of the proposed tidal work prescribed tidal work?
iJ Yes [-] No
If yes, is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the Wild
Rivers Act 2005?
J No [] Yes
if no, is the work proposed in a canal?
XJ No .[] Yes
If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?
ins
& No - (Complete Form 1, Part P). Ifthe Environmental Protection Agency (EPA) is not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency. The application
also requires assessment by Queensiand Transport (Maritime Safety Qld) as Concurrence Agency.
O Yes - (Compleie Form 1, Part P}. if the Environmental Protection Agency (EPA) is not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency. The application
also requires assessment by Queensland Transport {Maritime Safety Qld} as Concurrence Agency
and Qld Fire and Rescue Service as Advice Agency.
(b} Is any of the proposed tidal work to be carried out in one or more of the following tidai areas?
(i) One only local government tidal area L_] No Yes -
ii Starting in one local government tidal area and extending into another local
" covernment tidal rea (but in no strategic port tidal area) Dx] No [] Yes
(iil) In two or more local government tidal areas but not starting in either local §] No CT] Yes
government tidal area
(iv) One only strategic port tidal area (J No [] Yes
(v) A tidal area that is not a strategic port tidal area or a local government tidal Bq No Cl Yes
area
Note: The answers you provide in (i) - (v) above may affect who the Assessment Manager is for the application.
hy Pde EE awe
COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA
yes Bi
4.44 !s any of the operational work proposed to be carried out within a coastal management district?
EX] No -Gotoor12 [7] Yes
t pe heat OP baths
Vote hy thes
WATERWAY BARRIER WORKS: WILD RIVER AREA
4.42 ‘s any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
BX No -Gotooe:3 (7) Yes
Page 44
INTEGRATED FLANNING ACT 1997 {DAS Assessment Checklist, Version 22
DECLARED FISH HABITAT AREA: WILD RIVER AREA
4.13 \s any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
Dk] No - Goto 94.14
(J Yes
REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA
aid 's any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
IX] No -Goioi5 ([] Yes
WILD RIVER AREA
415 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
OJ Ne -catoos1s [[] Yes
i ocecadepute odin ys h yay neg ake Le cc ten do fie
STATE-CONTROLLED ROAD
416 ls any part of the premises located in part of a future State-controlled road. or within 100m of a State-controlled road?
No -éndefsection4 [7] Yes
Pap allay ogy been ts 2 agit
1 teeny Paty
Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
this process will be of assistance to you. it is provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable legislation to your circumstances.
To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for negligence} for errors or
omissions of any kind or for any toss {including direct and indirect losses), damage or other consequence which may arise from your
teliance on this process and the information contained on this form.
the
Page 45
Sunshine Coast - tanouse section FEES > - Regional! Council CIVICA TYPE RECEIPT TYPE SALE OF DOCUMENTS ' Superseded Planning Scheme Documentation 520: . Copy of Permit/Approval Letter . 110 The Noosa Plan Documentation ° 111 APPLICATION FEES . 4 Material Change of Use - Code/Impact MCU / / Consistent . . .. _. 521: : Inconsistent : : . t 521, Assessment under Superseded Planning Scheme . 521 Modification to a Development Permit MOD DP : 521 Extension of a Curréncy Period 4 / : 521 . . Lot Reconfiguration RECONFIG 521 / "os e& Bldg Work assessable against the Planning Scheme . “521 a PRE LODGEMENT REVIEW Half Hour 4 522 One Hour, . : se 522 ADVERTISING. . . : ; : » Purchase Advertised Applications 523 JETTIES / : . : ” Jetty Application Fee 2376 524 ‘ Jetty Bond: + clo. Soa 51 , (Category 4) BONDS . | . aa ct «Performance Bond , . ‘. St ‘ (Category 9) SEARCH FEE : @ ‘Search of Land Use Section file ‘ . 412. Liquor Licensing Request : . 113°! oe TOTAL $ Z2F76 —_ 4 NAME: _ Nisesex Uacmte ~ Row eA Chis “Roe ADDRESS: Po Box 9 J. TE Wnt) Y So _. FILE NO: 12/632 | DATE: 71S] 0m . v . . . . . RECEIPT NO: BZtEAGr Signature of TP Officer: (09 Sa . wy ce 7 . " J : + AUTHORITY NO: ° | (e¢/ 2ovef bs | .
Page 46
CALCULATION OF FEES APPLICATION FEE TOTAL FEES MCU - CODE ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION MCU - IMPACT ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 > FEE CALCULATION OPERATIONAL WORKS Details of Development FEE CALCULATION TOTAL FEES
Used in these records
10/0632 - Prescribed Tidal Works - Pontoon - Gympie Tc [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.