Council archive · source document
10/0632 - Prescribed Tidal Works - Pontoon - Gympie Tc [As Published] · 142010.632
n ‘part‘of:the proposa R within 200 metres of a shipping channel or an entry and exit shipping EC] Yes Cy No corridor for the port within 1000 metres of a swing basin, a commercial shipping wharf, a Cc Yes C] No mooring, anchorage or spoil grounds within 1000 metres of a planned port facility identified in a land use plan C] Yes CI No If you answered yes.to any of the above, then this application requires assessment by the Port Authority for the port relevant to your application as a concurrence agency. You must send a copy of your application to the Port Authority. @: if you answered no to all of the above, then this application requires assessment by the Port Authority for the port relevant to your application as an advice agency. You must send a copy of your application to the Port Authority. Section reference: e © Sustainable Planning Regulation, schedule 7, table 2, items 16 and 17 for the designated purpose [_] Yes L_] Ne carried out by, or on behalf of, the designated purpose Cl Yes C No ah * Ifyou answered yes to any of these questions, end of part 8 of this checklist * 9 Development application assessment checklist—IDAS checklist 1 Version 1.0 18 December 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0632 - Prescribed Tidal Works - Pontoon - Gympie Tc [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.