Council archive · source document
10/0632 - Prescribed Tidal Works - Pontoon - Gympie Tc [As Published] · 142010.632
Table E Name of owner/s of the land [| The owner’s written consent is attached or will be provided separately to the assessment manager Table F Name of owner/s of the land | By making this application, |, the applicant, declare that the owner has given written consent to the making of the application. Ey S e iene the ic enolcaton A tae rim Se Nip ema iy No o Yes—complete table G Table G—state owned resources (provide details for each state resource in a separate table) Nature of state-owned resource Nature of evidence required (tick the applicable box and attach a copy of the [_] _ Evidence of an allocation of, or an entitlement to, the resource evidence to this form) py Tt gs ila ' ; \ i f . 1 say CL] Evidence the chief executive of the department administering the resource is satisfied the development is consistent with an allocation of, or an entitlement to, the resource @ CI Evidence the chief executive of the department administering the resource is satisfied the development application may proceed in the absence of an allocation of, or an entitlement to, the resource mi adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)—complete table H C] on strategic port land under the 7ransport Infrastructure Act 1994—complete table | [| in a tidal water area—complete table J Table H Name of water body, watercourse or aquifer MoosA RiyeR. . 4 Application details—!0AS form 1 Version 1.0 18 December 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0632 - Prescribed Tidal Works - Pontoon - Gympie Tc [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.