Attachment 9 - Traffic Engineering Report
Developement Volumes
AM Peak Site Access
PM Peak
90 81
39 84
65 16
Myall Street Nandroya Road
33 72 67 17 0 0
19 58 -14 -14 2 3 16 17 16 17 0 0
53 61 18 6 5 2 18 6 0 0 0 0
-13 -5 18 0 0 0
6 0
18 16
6 17
State Route 6
Figure 6.4: Total Development Traffic Generation
6.5 Future Project Traffic Volumes
6.5.1 Opening Year (2024) Base Traffic Scenario
Figure 6.5 shows the opening year (2024) base traffic demands, based on an application of an annual growth
rate of 2.0% for a period of 5 years (5 years past the date of the traffic surveys) to the 2019 traffic survey
volumes.
2024 Base Traffic Volumes
AM Peak Site Access
PM Peak
0 0
0 0
0 0
Myall Street Nandroya Road
0 0 0 0 91 72
449 562 449 562 449 562 449 562 359 490 106 94
497 455 0 0 497 455 497 455 93 68 117 92
497 455 404 22 24 23
386 15
426 382
402 515
State Route 6
Figure 6.5: Estimated 2024 Peak Hour Traffic, Without Development (2.0%pa growth)
Site: Lot 2 & 3 Myall Street, Cooroy 21
Reference: 19BRT0357
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.