Attachment 9 - Traffic Engineering Report
7.2.2 Conclusion Based on the above analysis, it is concluded that the existing intersection configuration is adequate to accommodate the traffic demands associated with the proposed development at the opening year. It is anticipated that no future works are required as a consequence of the additional traffic associated with the proposed development. Site: Lot 2 & 3 Myall Street, Cooroy 27 Reference: 19BRT0357