Attachment 9 - Traffic Engineering Report
6.5.1 Opening Year (2024) Base Traffic Scenario ....................................................................21
6.5.2 Opening Year (2024) Project Traffic Scenario.................................................................22
6.5.3 Future Year (2034) Base Traffic Scenario .......................................................................22
6.5.4 Future Year (2034) Project Traffic Scenario ...................................................................23
7 Road Network Performance ................................................................................................................. 24
7.1 Myall Street / Site Access Assessment .......................................................................................24
7.1.1 Turn Lane Warrant Analysis............................................................................................24
7.1.2 SIDRA Analysis ................................................................................................................24
7.1.3 Conclusion ......................................................................................................................25
7.2 Myall Street/ State Route 6/ Nandroya Road Roundabout Assessment ....................................25
7.2.1 SIDRA Analysis ................................................................................................................25
7.2.2 Conclusion ......................................................................................................................27
8 Active Transport .................................................................................................................................. 28
8.1 Public Transport .........................................................................................................................28
8.2 Pedestrian and Cyclist Provisions ...............................................................................................28
9 Summary and Conclusions ................................................................................................................... 29
9.1 Development Summary ..............................................................................................................29
9.2 Car Parking Arrangements..........................................................................................................29
9.3 Site Access Arrangements ..........................................................................................................29
9.4 Service Vehicle Arrangements....................................................................................................29
9.5 Active Transport Facilities ..........................................................................................................30
9.6 Impact on Surrounding Road Network .......................................................................................30
9.7 Conclusion ..................................................................................................................................30
Appendix A Proposed Site Plan................................................................................................................. 31
Appendix B Service Vehicle Swept Paths .................................................................................................. 32
Appendix C Sidra Intersection Analysis ..................................................................................................... 33
Site: Lot 2 & 3 Myall Street, Cooroy 3
Reference: 19BRT0357
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.