Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Attachment 9 - Traffic Engineering Report

of 49

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

MOVEMENT SUMMARY
      Site: [2024 PM Project - Site Access]
Myall Street / Site Access
Site Category: (None)
Giveway / Yield (Two-Way)



 Movement Performance - Vehicles
 Mov    Turn      Demand Flows        Deg.   Average Level of       95% Back of Queue  Prop. Effective Aver. No. Average
 ID                  Total  HV        Satn    Delay  Service        Vehicles Distance Queued Stop Rate   Cycles Speed
                    veh/h    %         v/c       sec                    veh         m                               km/h
 East: Myall Street
 5       T1            474   0.0     0.244         0.0   LOS A            0.0        0.0      0.00       0.00       0.00     59.9
 6       R2              6   0.0     0.007         7.7   LOS A            0.0        0.2      0.48       0.63       0.48     48.2
 Approach              480   0.0     0.244         0.1       NA           0.0        0.2      0.01       0.01       0.01     59.8

 North: Site Access
 7       L2             17   0.0     0.239         8.4   LOS A            0.8        5.9      0.72       0.89       0.79     42.8
 9       R2             68   0.0     0.239       16.6    LOS C            0.8        5.9      0.72       0.89       0.79     46.9
 Approach               85   0.0     0.239       15.0    LOS B            0.8        5.9      0.72       0.89       0.79     46.3

 West: Myall Street
 10      L2             35   0.0     0.019         5.5   LOS A            0.0        0.0      0.00       0.58       0.00     53.6
 11      T1            458   0.0     0.235         0.0   LOS A            0.0        0.0      0.00       0.00       0.00     60.0
 Approach              493   0.0     0.235         0.4       NA           0.0        0.0      0.00       0.04       0.00     59.2

 All Vehicles         1058   0.0     0.244         1.4       NA           0.8        5.9      0.06       0.09       0.07     57.7


Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Site tab).
Vehicle movement LOS values are based on average delay per movement.
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay
is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.




SIDRA INTERSECTION 8.0 | Copyright © 2000-2018 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Processed: Thursday, 5 September 2019 2:11:26 PM
Project: \\TTMFPS01\Synergy\BR\Synergy\Projects\19BRT\19BRT0357 Lot 2 & 3 Myall Street, Cooroy\6 - Analysis\19BRT0357 SA_01_Site
access (turn treatments).sip8
Log in to download the original file

Attachment 9 - Traffic Engineering Report.pdf · 5.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.