Attachment 9 - Traffic Engineering Report

of 49

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

MOVEMENT SUMMARY
      Site: 102 [2024 AM Base - Roundabout]
New Site
Site Category: (None)
Roundabout



 Movement Performance - Vehicles
 Mov     Turn  Demand Flows            Deg.     Average    Level of    95% Back of Queue        Prop.  Effective Aver. No. Average
 ID               Total  HV            Satn      Delay     Service     Vehicles Distance       Queued Stop Rate    Cycles Speed
                 veh/h    %             v/c         sec                    veh         m                                      km/h
 South: RoadName
 1        L2         425      0.0      0.232         3.1    LOS A            1.5        10.8      0.27        0.38      0.27   56.8
 3       R2            23     0.0      0.017         9.9    LOS A            0.1         0.6      0.25        0.57      0.25   55.1
 Approach            448      0.0      0.232         3.5    LOS A            1.5        10.8      0.27        0.39      0.27   56.7

 East: RoadName
 4        L2           25     0.0      0.121         4.8    LOS A            0.6         4.0      0.50        0.47      0.50   55.7
 5        T1           98     0.0      0.121         4.2    LOS A            0.6         4.0      0.50        0.47      0.50   58.1
 Approach            123      0.0      0.121         4.3    LOS A            0.6         4.0      0.50        0.47      0.50   57.6

 West: RoadName
 11       T1           76     0.0      0.065         2.2    LOS A            0.3         1.8      0.10        0.22      0.10   60.7
 12      R2          516      0.0      0.293         9.6    LOS A            1.6        10.9      0.10        0.60      0.10   55.8
 Approach            592      0.0      0.293         8.7    LOS A            1.6        10.9      0.10        0.55      0.10   56.3

 All Vehicles       1163      0.0      0.293         6.2    LOS A            1.6        10.9      0.21        0.48      0.21   56.6


Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Site tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.




SIDRA INTERSECTION 8.0 | Copyright © 2000-2018 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Processed: Thursday, 5 September 2019 2:57:59 PM
Project: \\TTMFPS01\Synergy\BR\Synergy\Projects\19BRT\19BRT0357 Lot 2 & 3 Myall Street, Cooroy\6 - Analysis\19BRT0357
SA_01_Roundabout.sip8
Log in to download the original file

Attachment 9 - Traffic Engineering Report.pdf · 5.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.