71.   An easement in favour of Council for drainage purposes must be registered against
      the titles of the properties over the land area identified as being below the 1 in 100
      year ARI flood level on the subject site and over all stormwater quality improvement
      devices on private allotments. Areas covered by vegetation covenant are to be
      excluded from the easement.
72.   The easement must be granted at no cost to Council. The wording of the easement
      documentation must be in accordance with Council’s standard easement document.
      Draft easement documentation must be submitted to Council for endorsement.
73.   No structures, including solid-type fences are to be located within areas of the
      allotment covered by drainage easement. No excavation, filling, or drainage works
      are to be commenced on an easement without prior written consent of Council.
      Maintenance of the area of the allotment covered by drainage easement rests with
      the landowner or occupier.
      Stormwater
74.   Concurrent with any application for Operational Works relating to this development, a
      detailed Integrated Water Management Plan must be prepared by a suitably
      experienced Registered Professional Engineer of Queensland (RPEQ) or equivalent.
      All water management and drainage systems must be designed in accordance with
      the detailed Integrated Water Management Plan and demonstrate compliance with
      the water quality objectives being total suspended solids (median) < 20 mg/L, total
      phosphorous (median( < 0.05 mg/L and total nitrogen (median) <0.5 mg/L OR meet
      the following load based reduction targets 80% total suspended solids removal, 60%
      total phosphorous removal and 45% total nitrogen removal. Compliance with water
      quality objectives shall be demonstrated using the MUSIC model.                When
      demonstrating compliance with concentration based objectives, flows less than 10L/s
      shall be excluded from calculation of the median concentration. The concentration /
      load from each lot shall be representative of a lot containing an on site effluent
      treatment system. The detailed Integrated Water Management Plan must also be in
      accordance with the following:
      (a)     The latest Water Sensitive Urban Design Technical Design Guidelines
              published by Healthy Waterways / Water by Design;
      (b)     Queensland Urban Drainage Manual; and
      (c)     Australian Runoff Quality.
75.   A stormwater quality treatment system must be provided for the development. The
      works must be undertaken in accordance with an Operational Works approval and
      the latest version of the Water Sensitive Urban Design Technical Design Guidelines
      for South East Queensland and the Water by Design Bioretention Technical design
      Guidelines, and must include in particular:
      (a)     Swales and bioretention swales which:
              (i)     must in accordance with the detailed Integrated Water Management
                      Plan;
              (ii)    Stormwater from Lot 4 to 13 must be treated in swales / bioretention
                      swales located within the allotment;
              (iii)   Stormwater from Lot 50 to 52 does not require treatment and must
                      not be included in the MUSIC model;
              (iv)    Stormwater from Lots 1 to 3 and 14 to 49 must be treated in swales /
                      bioretention swales located within road reserve areas;
              (v)     Bioretention swales must have a minimum base width of 1.0 metre;
              (vi)    The use of any retaining walls within the road reserve must be
                      avoided;


                                                                                          11
Log in to download the original file

2018-01-15 GC Agenda - Attachment 1 to Item 6 - P&E Court Appeal 344 of 2009(PDF, 4MB).pdf · 3.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.