Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2018-01-15 GC Agenda - Attachment 1 to Item 6 - P&E Court Appeal 344 of 2009

of 38

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                  Vegetation Management Act 1999 – Amended Concurrence Agency
                                                                    Response

                                           Reference:         Elvas #2006/012181, Trackjob # IC1106NAM0002
- Assessable vegetation associated with natural wetlands and watercourses are protected to maintain water
quality and habitat.
- The current extent of the of concern regional ecosystems and endangered regional ecosystems are
maintained.
- Areas of remnant vegetation are retained to maintain ecosystem functioning, remain in the landscape despite
threatening processes and maintain connectivity to adjacent properties.
- The current extent of essential habitat is maintained.
DNRM has directed the assessment manager to include conditions in any development approval given for the
application to ensure that any development approval remains consistent with the RaL Policy.



Delegate




Andrew Collins
Senior Natural Resource Management Officer
Delegate, Chief Executive Department of Natural Resources and Mines
Administering the Vegetation Management Act 1999


11 December 2012


Attachment 1. Referral Agency Response (Vegetation) Plan 2006/012181




CONDITIONS

    1. Clearing of native vegetation must not occur on the land within the area shown as Area A (A1, A2, A3,
       A4, A5, A6) on Referral Agency Response (Vegetation) Plan RARP2006/012181, unless the clearing
       is—
                  By fire under the Fire and Rescue Service Act 1990 to reduce hazardous fuel loads or an activity
                   under the Fire and Rescue Service Act 1990, section 53, 68 or 69; or
                  Where it is necessary to remove or reduce the imminent risk that the vegetation poses to serious
                   personal injury or damage to property; or
                  To establish stormwater drainage infrastructure within previously cleared areas; or
                  In accordance with conditions on a concurrence agency response issued by the chief executive
                   administering the Vegetation Management Act 1999 for a development approval; or
                  In accordance with conditions on a development approval where the chief executive administering
                   the Vegetation Management Act 1999 is assessment manager for operational works that is the
                   clearing of native vegetation.
    2. New infrastructure must not be located in Area A (A1, A2, A3, A4, A5, A6) on Referral Agency
       Response (Vegetation) Plan RARP2006/012181, unless the infrastructure is:
                  Stormwater drainage infrastructure located within previously cleared areas; or


Page 2 of 3                                                                     Department of Natural Resources and Mines
Log in to download the original file

2018-01-15 GC Agenda - Attachment 1 to Item 6 - P&E Court Appeal 344 of 2009(PDF, 4MB).pdf · 3.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.