Minor Change Existing Approval - RAL18/0023 02 (As Published) · RAL18/0023.02

of 18

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                          Officer:            Nadine Gorton
                                                                                          Direct Telephone:   07 5329 6245
                                                                                          Our Reference:      RAL18/0023.02
                                                                                          Your Reference:     n/a

               2 February 2026


               Stockwell Development Group Pty Ltd
               C/- Stockwell Development Group Pty Ltd
               PO Box 3144
               SOUTH BRISBANE QLD 4101
               [email protected]



               Dear Sir/Madam,
                                            Decision Notice – Minor Change
                                                         Planning Act 2016

               I refer to your application received on 26 September 2025, requesting a minor change to an existing
               development approval. Council on 27 January 2026 decided your requested changes.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              RAL18/0023.02

                   Street address:              55, 57, 63, 64, 65, 66, 67, 68, 69, 70, 72, 74, 76 Hofmann Dr and
                                                37, 38, 40, 46, 52, 54 Walter Hay Drive, Noosaville (formerly 28
                                                Eenie Creek Road, Noosaville)

                   Real property description:   Lots 1 to 19 and 21 to 24 on SP322201 (Formerly Lot 3 SP 246584)

                   Planning Scheme:             Noosa Plan 2020 (26 September 2025)

               2.      DECISION DETAILS

               The following type of approval was issued on 3 September 2020.
               •       Development Permit for Reconfiguration of a Lot – 1 into 23 lots
               In relation to the request to make a minor change to the existing approval, Council on 27 January
               2026, decided to approve the requested changes. The changes are detailed below.
               A.      Approve the change.
               B.      Amend conditions 53(a)
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.




               ABN 97.969.214.121                                                                 PO Box 141
               noosa.qld.gov.au                                                            Tewantin QLD 4565
               [email protected]                                                            07 5329 6500
                                                                                                              Page 1 of 18
Document Set ID: 24498083
Version: 5, Version Date: 02/02/2026
Full text of the other 17 pages

Page 2

               4.     ASSESSMENT MANAGER CONDITIONS

                      WHEN CONDITIONS MUST BE COMPLIED WITH
               1.     Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
                      the submission of the subdivision plan to Council.
                      Approved Plans
               2.     Development undertaken in accordance with this approval must generally comply with the
                      following approved plans of development (as amended, if required).

                        Plan No.       Rev.   Plan/Document Name                                    Date

                        034389.59      V1     Proposed Subdivision, Sheet 1                         15/01/2020

                        034389.59      V1     Diagram A and Diagram B, Sheet 2                      15/01/2020

                        034389.59      V1     Diagram C and Diagram E, Sheet 3                      15/01/2020

                        034389.59      V1     Proposed Easements & Covenants, Sheet 4               15/01/2020

                      as amended to incorporate the following amendments, and any other amendments required
                      by the conditions:
                      2.1. identification of the proposed emergency access for Lot 23 and that the proposed
                           emergency gate is located in the road reserve in accordance with condition 8;
                      2.2. identification of the proposed emergency access gates on Hofmann Drive and Walter
                           Hay Drive for the emergency access easement across Lots 11-15 (as described in
                           condition 21;
                      2.3. replacement of Easements AN and AM, with a singular 6m easement marked ‘AM’ as
                           required by condition 36(a);
                      2.4. provision of stormwater easements on Lots 8 and 9 and in accordance with condition
                           27;
                      2.5. provide an access easement named AF for access to proposed Lot 24 as required by
                           condition 36(a).
               3.     All lot numbering on the subdivision plan to be submitted to Council for plan sealing must
                      remain as shown on the Approved Plans.
                      Currency Period
               4.     The Currency Period for this development approval lapses if all conditions have not been
                      complied with, and the plan of survey lodged with Council for endorsement by 31 August
                      2024, unless an application to extend the currency period is approved by Council.




                                                                                                      Page 2 of 18
Document Set ID: 24498083
Version: 5, Version Date: 02/02/2026

Page 3

                      Acoustic Measures for Residential Lots & Office Lot
               5.     Prepare and submit to Council for approval with an Operational Works application a revised
                      acoustic report which includes measures to mitigate noise generate from the shopping centre
                      operations and equipment, including deliveries, truck movements and rubbish collection.
                      This report should consider attenuation at the noise source as well as a noise barrier along
                      the shared boundary of Lots 19 and 21. All measures to mitigate noise must be implemented
                      prior the submission of the subdivision plan to Council.
                      Noise attenuation is required to achieve the following acoustic quality for potential residential
                      uses on Lots 17-19. The measurement location must include receivers being placed at the
                      closest point to the future residential and office buildings.

                                                                            Criteria (measured at the receptor) dB(A)
                          Sensitive receptor            Time of Day

                                                                              LAeq,adj,1hr 1          LA1,adj,1hr2

                                                    Daytime and evening
                                                                                   35                     45
                                                     (habitable spaces)
                          Dwelling (indoors)
                                                     Night-time (sleeping
                                                                                   30                     40
                                                            areas)
                      1Acoustic        descriptor/noise target for continuous noise sources (eg. Mechanical plant).
                      2Acoustic descriptor/noise target for transient impacts arising from loading dock activities

                      (e.g. truck movements, reversing alarms, compactor, trolley etc.)
                      Water & Sewer Connections
               6.     An underground connection to reticulated water and sewerage must be provided to each lot
                      in accordance with the standards and requirements of Northern SEQ Distributor– Retailer
                      Authority (Unitywater).
                      A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater)
                      must be submitted to Council that certifies an underground connection to reticulated water
                      and sewerage has been provided to each lot.
                      External Works
               7.     Prior to the sealing of the survey plan a vehicle access to proposed Lot 23 must be
                      constructed at no cost to Council. The works must be undertaken in accordance with an
                      Operational Works approval, be generally in accordance with drawing number 1856-R08
                      Revision J prepared by Barlow Shelley and include an access extending from the existing
                      roundabout in Walter Hay Drive to the property boundary.
               8.     Prior to the sealing of the survey plan a new emergency vehicle exit from proposed Lot 23
                      must be constructed at no cost to Council. The works must be undertaken in accordance
                      with an Operational Works approval. The exit must extend from the property boundary to the
                      existing formation of the south bound lanes of Walter Hay Drive and be for emergency
                      vehicles only. The exit must:
                      8.1. be located in the north western section of the Walter Hay Drive frontage
                      8.2. include a crossing in the median of Walter Hay Drive that is sufficient to permit
                           emergency vehicles to exit the site and access the north bound lanes of Walter Hay
                           Drive




                                                                                                          Page 3 of 18
Document Set ID: 24498083
Version: 5, Version Date: 02/02/2026

Page 4

               9.     Prior to the sealing of the survey plan a new pedestrian access from Lot 23 to the existing
                      pathway network must be constructed at no cost to Council. The works must be undertaken
                      in accordance with an Operational Works approval. The pedestrian connection must be
                      located in the north western part of the site and extend to the existing pathway network in
                      the Eenie Creek Road road reserve to the east of the underpass.
               10.    Prior to the sealing of the survey plan a new pedestrian connection from the existing pathway
                      network in Hofmann Drive to proposed Lot 1 must be constructed at no cost to Council. The
                      works must be undertaken in accordance with an Operational Works approval. The
                      connection must be located to the south of the existing roundabout at the intersection of
                      Hofmann Drive with the internal access road for “Noosa Civic” and connect to the existing
                      internal pathway network within proposed Lot 1.
                      New Roads
               11.    The new public road shown on the Approved Plans (extension of Hofmann Drive) must be
                      constructed in accordance with the conditions of this Decision Notice and dedicated as road
                      reserve at no cost to Council. The works must be undertaken in accordance with an
                      Operational Works approval and be generally in accordance with drawings number 1856-
                      R04 revision K, 1856-R05 revision K and 1853-R06 revision J prepared by Barlow Shelley.
                      The works must include but not be limited to kerb and channel, footpaths, street lighting,
                      services, linemarking, stormwater drainage and landscaping.
                      This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                      infrastructure.
               12.    Approval of the proposed subdivisional road layout is subject to final operational works
                      approval and any associated changes to the subdivision road layout that arise as part of the
                      operational works approval and any construction changes.
               13.    The road reserve boundaries between public and private roads must be located to
                      accommodate all constructed pedestrian routes within the public road reserve around all
                      sides of the proposed roundabouts.
               14.    The road reserve boundaries adjacent to the proposed emergency access gates must be
                      located to ensure that:
                      14.1. all elements of the emergency access gates are wholly contained within the road
                            reserve,
                      14.2. the swing areas (inward opening) of the gates is not impeded by fencing and is
                            protected by the terms of Easements AY and AQ.
               15.    Clearly visible signage must be erected at the threshold of the private roads. The signage
                      must clearly indicate to motorists and pedestrians that they are entering a private road
                      system.
                      Private Roads
               16.    Prior to the sealing of the survey plan, the private road within Lot 3 (Road B adjacent to Lots
                      10-16) must be constructed with a centrally located 10m carriageway. The works must be in
                      accordance with an Operational Works approval and be generally in accordance with
                      drawing number 1856-R05 revision K prepared by Barlow Shelley. The works must include
                      but not be limited to kerb and channel, footpaths, street lighting, services, linemarking,
                      stormwater drainage and landscaping.
               17.    Prior to the sealing of the survey plan, the private road within Lot 3 (Road C – adjacent to
                      lots 7-9) must be constructed with a centrally located 12m carriageway having 1.5m on-road
                      cycle lanes on each side. The works must be in accordance with an Operational Works
                      approval and be generally in accordance with drawings numbered 1856-R05 revision K and
                      1856-R07 revision J prepared by Barlow Shelley. The works must include but not be limited
                      to kerb and channel, 3m footpath on the western side, street lighting, services, linemarking,
                      stormwater drainage and landscaping. The road must be designed to cater for on-street
                      parking to be added when future development occurs on lots 3 and 7.


                                                                                                       Page 4 of 18
Document Set ID: 24498083
Version: 5, Version Date: 02/02/2026

Page 5

               18.    Prior to the sealing of the survey plan, the entrance road between Lots 2 and 7 must be
                      constructed. The works must be in accordance with an Operational Works approval and be
                      generally in accordance with drawing number 1856-R17 revision J prepared by Barlow
                      Shelley. The works must include but not be limited to kerb and channel, footpaths, street
                      lighting, services, linemarking, stormwater drainage and landscaping.
                      Property Access and Driveways
               19.    Prior to the sealing of the survey plan access to the lots must be provided generally in
                      accordance with the access management plan shown on drawing numbered 1856-R03
                      revision J prepared by Barlow Shelley unless modified herein:
                      a.      access to proposed for Lots 4, 8-10, 15, and 16 must 9.0m wide (minimum) and be
                              provided as part of subdivision operational works,
                      b.      access to proposed Lots 3, 5, 6, 7 and 17-22 must be constructed as part of the future
                              development of the lots,
                      c.      all movements access for lots 11-14 must be constructed as part of the future
                              development of the lots
                      Property notations will be added to Council’s rates records for Lots 3, 5, 6, 7, 11-14 and 17-
                      22 advising owners, prospective purchasers and private certifiers of the access
                      requirements.
               20.    Vehicle access to Lots 4, 8-10, 15, and 16 is limited to the constructed driveway only. A
                      clause must be included in the contract of sale for Lots 4, 8-10, 15, and 16 which requires
                      vehicle access to be from the constructed driveway only, and which prohibits the driveway
                      from being relocated without Council agreement.
                      Emergency Access Route (Lots 11-15)
               21.    The 6m wide emergency access route through Lots 11-15 connecting Hofmann Drive and
                      Walter Hay Drive must be constructed. The works must be undertaken in accordance with
                      an Operational Works approval and be generally in accordance with drawings numbered
                      1856-R04 revision K and 1856-R05 revision K prepared by Barlow Shelley. The works must
                      include but not be limited to:
                      a.      locked gates controlling access at Hofmann Drive and Walter Hay Drive. The gates are
                              to be installed by the developer in land areas fully controlled by Council and clear of
                              any service allocations in the road reserve
                      b.      the emergency access route, driveways and gates to Hofmann Drive and Walter Hay
                              Drive are to be designed to suitably accommodate all QFES vehicles that could
                              reasonably access the emergency access route.
               22.    In regard to the emergency access route, and adjacent parking along that route, at the rear
                      of lots 12-15:
                      a.      any future development of the individual lots (Lots 11-15) must include provision of a
                              vehicular linkage between the private road (Road B) and the emergency access route.
                              The linkage must be sufficient to permit vehicles to access the parking spaces within
                              the relevant lot on the emergency access route,
                      b.      any future development of the individual lots must be designed such that service
                              vehicle activity for the day to day operation of the lot remains clear of the emergency
                              access route,
                      c.      the pedestrian access points to buildings on the individual lots are designed and
                              positioned so that any associated parking along the emergency access route is limited
                              to the individual lot.




                                                                                                       Page 5 of 18
Document Set ID: 24498083
Version: 5, Version Date: 02/02/2026

Page 6

                      Car Parking
               23.    Parking located along the emergency access route within Lots 11-15 must be limited to the
                      individual lot. The easement documents for the emergency access route must include
                      sufficient detail to limit the movement of vehicles and parking to the individual lot and clear
                      of the emergency access route.
                      Pedestrian and Bicycle Facilities
               24.    Pedestrian and bicycle facilities must be provided for the development. The works must be
                      undertaken in accordance with an Operational Works approval and must include in particular:
                      a.      the on-road bicycle lanes as shown on the approved plans,
                      b.      the footpath network as shown on the approved plans,
                      c.      the footpath within proposed Lots 3 and 4, being Easement Al and Easement AO, must
                              be constructed as part of the subsequent development of Lots 3 and 4. The pathway
                              is to extend from the Hofmann Drive frontage to the common boundary between Lots
                              3 and 24. The works must be undertaken in accordance with an operational works
                              approval and include a 3m wide sealed surface, drainage d suitable lighting for
                              pedestrian safety (CPTED). Despite condition 1, the timing for the construction of the
                              pathway is at the time of the subsequent development of Lots 3 and 4.
                      d.      the footpath on the northern side of Hofmann Drive must be extended from the crossing
                              point adjacent to Lot 4 to the north west for the full frontage of Covenant J
                      e.      all footpaths and associated infrastructure located within private property must be
                              maintained by the property owner
                      This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                      infrastructure.
                      Stormwater Drainage
               25.    All stormwater drainage infrastructure must be located outside of the open space covenants
                      unless approved as part of an Operational Works application.
               26.    As part of any future Material Change of Use application for proposed Lot 4, 5 or 6, a
                      Stormwater Management Plan is to be provided and stormwater quality treatment devices
                      are to be incorporated into the site layout such that the pollutant load reduction targets
                      specified in Appendix 2, Table B of the State Planning Policy 2017 are achieved (refer
                      property note)
               27.    A stormwater quality treatment system must be provided for the development. The works
                      must be undertaken in accordance with an Operational Works approval and the Bioretention
                      Technical Design Guidelines (Water by Design, 2012), and must include in particular
                      stormwater quality treatment devices of a size and location generally in accordance with
                      those shown in the Site-based Stormwater Management Plan – Version 5, prepared by
                      Barlow Shelley Consulting Engineers Pty Ltd, dated 2nd December 2019. The bio retention
                      devices are required to treat runoff from the bushfire access and carparks within Lots 12-15.
               28.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with an Operational Works
                      approval in compliance with the relevant sections of Queensland Urban Drainage Manual.
               29.    Stormwater runoff from the development must be controlled and disposed of into a lawful
                      point of discharge and in a manner that does not cause scour or damage to the subject site
                      or any adjoining property including Council’s drainage system.
               30.    Any drainage line or stormwater outlet located within the adjoining vegetation covenant or
                      easement area must be aligned to minimise the impacts on existing vegetation with the final
                      alignment determined on-site in agreement with Council’s delegate.




                                                                                                       Page 6 of 18
Document Set ID: 24498083
Version: 5, Version Date: 02/02/2026

Page 7

               31.    Streetscape bioretention devices are to be detailed with the Operational Works application
                      and are to specifically address the following:
                      a.      are designed generally in accordance with the Bioretention Technical Design
                              Guidelines
                      b.      are designed generally in accordance with IPWEQA Standard Drawing No. WSUD001
                              are provided with a free-draining outlet from the sub-soil drainage system
                      c.      are designed with offsets to underground services in accordance with utility services
                              provider’s requirements.
                      d.      allow for the safe movement of pedestrians along the road verge either through
                              provision of a path behind the device or pedestrian refuge in the case of no path being
                              provided.
                      e.      have stable batter slopes which are designed to avoid the need for safety fencing or
                              bollards, or incorporate grates.
                      f.      have plantings setback from the road pavement a sufficient distance to not affect the
                              road pavement during operation or re-setting.
                      g.      are designed with a connection from the kerb to the filter media surface which is
                              sufficiently robust and not prone to blockage
               32.    All stormwater quality treatment devices contained in private lots must be maintained in
                      accordance with the Water by Design (2009) Maintaining Vegetated Stormwater Assets
                      (Version 1). The approved Operational Works drawings for the stormwater quality treatment
                      system and detailed life cycle costing of the system must be attached as an addendum to
                      this document. Records of all maintenance activities undertaken must be kept and made
                      available to Council upon request.
                      Electricity and Telecommunication Services
               33.    Underground reticulated electricity and telecommunication services must be provided to
                      each lot in accordance with an approval for Operational Works and the standards and
                      requirements of the relevant service provider.
               34.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.
               35.    Certification must be submitted to Council from all relevant service providers which certifies
                      that the development has met the requirements of this Decision Notice and all applicable
                      legislation at the time of construction.
                      Easements
               36.    The easements for the development must be in accordance with the schedule indicated on
                      drawing number 034389.59 sheet 4 of 4 prepared by Bennett and Francis dated 15 January
                      2020 except as modified herein:
                      a.      Lot 1:
                              i.       Combine Easement AM & AN with a width of 6m, which will require amendment
                                       to Covenant J to accommodate the combined easement.
                              ii.      New Easement AF must be created between Lots 2 and 7 to include the area of
                                       the adjacent “new road” connecting to Walter Hay Drive, along with secondary
                                       access to Lot 24 by way of left in and left out access along the full northern
                                       boundary of Lot 24. It is noted that primary access to Lot 24 is by way of the new
                                       roundabout.




                                                                                                           Page 7 of 18
Document Set ID: 24498083
Version: 5, Version Date: 02/02/2026

Page 8

                      b.      Lot 3:
                              i.       Easement AL – benefit lots 1, 4 and Public Thoroughfare, with a minimum width
                                       of 4m
                              ii.      Easement AK – benefit lots 1, 6, 7, 8, 9
                              iii.     Easement AP – benefit lots 10, 11, 12, 13, 14, 15, 16
                      c.      Lot 4:
                              i.       Easement AO – benefit lots 1, 3, and Public Thoroughfare, with a minimum width
                                       of 4m
                      d.      Lot 11:
                              i.       Easement AY – benefit lots 1, 3, Emergency vehicles and Council
                      e.      Lot 12:
                              i.       Easement AX – benefit lots 1, 3, Emergency vehicles and Council
                      f.      Lot 13:
                              i.       Easement AW – benefit lots 1, 3, Emergency vehicles and Council
                      g.      Lot 14:
                              i.       Easement AV – benefit lots 1, 3, Emergency vehicles and Council
                      h.      Lot 15:
                              i.       Easement AQ – benefit lots 1, 3, Emergency vehicles and Council
               37.    The private road easement AK between lots 3 and 7 must have a minimum width of 25m and
                      be sufficient to accommodate an ultimate “main street” environment as described in Figure
                      6.4.1.5 – Section A2 – 25m Main Street without median of the New Noosa Plan and as shown
                      below:




               38.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               39.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               40.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.


                                                                                                         Page 8 of 18
Document Set ID: 24498083
Version: 5, Version Date: 02/02/2026

Page 9

                      Earthworks and Retaining Walls
               41.    All fill and associated retaining structures/batters must be undertaken in accordance with an
                      Operational Works approval and be generally in accordance with drawing numbers 1856-
                      R04 Revision K, 1856-R05 Revision K, 1856-R06 Revision J and 1856-R07-2 Revision J
                      prepared by Barlow Shelley. All works must be contained entirely within the subject site
                      unless written permission from the respective landowner(s) is provided to Council.
               42.    All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
                      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.
                      Damage to Services and Assets
               43.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
                      Land Rehabilitation
               44.    The land area identified as Open Space 3 (OS3) on Schedule 4 Shire Business Centre (Map)
                      in the Noosa Plan on proposed lot 23 must be rehabilitated, where necessary, to provide a
                      vegetated screen of future development, exclusive of any Council approved infrastructure.
                      All plants must be local native species suitable for the area and the species selection
                      consistent with the naturally occurring species in the area. The landscaping must be reflective
                      of the surrounding natural landscape. The works must be undertaken in accordance with an
                      Operational Works approval.
               45.    No infrastructure is to be installed in the OS3 land area, unless:
                      a.      in accordance with a Council endorsed management plan; or
                      b.      to connect directly into existing stormwater infrastructure, with any disturbance to
                              vegetation in OS3 minimised and rehabilitated in accordance with a Development
                              Permit for Operational Works.
                      Vegetation Preservation
               46.    Existing vegetation on the undeveloped site and in the road reserve where within 10m of
                      public access or public infrastructure must be retained in accordance with an Arborist Report
                      (or part thereof) prepared by a qualified person* and endorsed through an Operational Works
                      approval to manage the risk to the public. *(Refer to Advisory Note)
                      Fauna Management
               47.    Vegetation must only be removed or disturbed in accordance with a Fauna Management
                      Plan for the development prepared by a qualified person* and referenced in a Development
                      Permit for Operational Works. *(Refer to Advisory Note)
               48.    Clearing for the subdivision will occur generally in accordance with clearing plan Ref:
                      10651BHP Issue C dated 24 August 2020 (Bushland Habitat Plan) prepared by Norris Clarke
                      & O’Brien Pty Ltd, with the exception that vegetation must be retained along the full frontage
                      of lot 23 to Walter Hay Drive apart from the identified driveway access location. All clearing
                      will be subject to an application for Operational Works.




                                                                                                       Page 9 of 18
Document Set ID: 24498083
Version: 5, Version Date: 02/02/2026

Page 10

                      Fencing to Protected Land
               49.    A permanent fence must be constructed along boundary of lot 17 and covenant J, the entire
                      length of the interface of the site with the park reserve at Lot 5 SP222982, Lot 3 SP182845
                      and the southern aspect of Lot 147 NPW889 (at the corner of Eenie Creek Rd and Walter
                      Hay Drive). The fence must be constructed in accordance with an Operational Works
                      approval and must be to the following specifications:
                           a. 1.8 m high chain wire fence.
                           b. Include single person access gate (minimum opening of 1200mm) in a suitable location
                              generally in the location of the rear of lot 13.
                           c. Include signage for each lot interface stating the land is a fauna reserve.
                           d. The fence must be located adjacent to the northern Boundary of Covenant L.
                      Bushfire Management
               50.    The development must be carried out in accordance with Updated Bushfire Management
                      Plan For Undeveloped Areas Of Noosa Civic prepared by The Consultancy Bureau Pty Ltd,
                      dated December 2019, with the following amendments to be included and constructed in
                      accordance with an Operational Works approval:
                      a.       Lot 23 emergency egress to be located at the southern point of Easement E on
                               SP167978 perpendicular to Walter Hay Drive and include treatment to the medium strip
                               of Walter Hay Drive to allow for Urban fire appliance cross over.
                      b.       Provision of access control gates to each emergency access points within the road
                               reserve.
                      c.       Provision of a formed 6m emergency access within the 20m buffer to the rear of future
                               lots 11 to 15.
                      d.       Inclusion of any emergency access markers and alike to the emergency access roads
                               and entry/exit points.
                      e.       Inclusion of management requirements of the owner of lot 1 for fuel loads associated
                               with the 20m break between proposed lots 3 and 7, interface of covenant J, and the
                               20m buffer in lot 23.
                      f.       Include the specific provision of no clearing of Covenant areas for bushfire
                               management
                      The report must be resubmitted to Council incorporating the above amendments prior to the
                      issue of any Development Permit for Operational Works.
               51.    Certification must be submitted to Council from a qualified person* which certifies that the
                      development has been constructed in accordance with the bushfire management conditions
                      of this Decision Notice. *(Refer to Advisory Note)
                      Treatment of Temporarily Vacant Land
               52.    The following works must be carried out if some or all of the cleared land remains vacant or
                      undeveloped for more than 3 months after the approved vegetation clearing:
                      a.       the site must be graded to prevent ponding (to the same level as the adjoining footpath
                               wherever practicable), and the surface effectively stabilised.
                      b.       the site must be maintained to ensure no nuisance to adjacent premises, roads or
                               footpaths
                      c.       where fencing is installed to secure boundaries:
                               i.      the fencing must be durable and not capable of being pushed or blown over
                               ii.     the fencing type must not detract from local amenity (barbed wire is not
                                       acceptable)



                                                                                                            Page 10 of 18
Document Set ID: 24498083
Version: 5, Version Date: 02/02/2026

Page 11

                                       iii.   vandalism must be promptly repaired, and any graffiti removed.
               Landscaping Works
               53.    The development site must be landscaped in accordance with the Noosa Plan’s Landscaping
                      Code and Planning Scheme Policy Landscaping Plants and Guidelines. The landscaping
                      must be reflective of the surrounding natural landscape and must be reflective of the
                      surrounding natural landscape. The works must be undertaken in accordance a plan
                      prepared by a qualified person* and in accordance with an Operational Works approval and
                      must include in particular:
                      a.      Local native plant species suitable for the location in mulched garden beds within the
                              lots that front Hofmann Drive and the future extension of Hofmann Drive that are 6m
                              wide to the residential lots 17-19, 7m wide for Lot 4 on SP32201 (only where developed
                              in accordance with MCU22/0094 – for a child care centre) and 10m wide to the
                              remaining lots at the time of sealing the plan of subdivision.
                      b.      Supplementary plantings to the median strip in the southern extent of Hofmann Drive.
                      c.      Provision of a minimum of one ex-ground or advanced street tree within the road
                              reserve for every 8 metres of the new road between proposed lot 3 and 7 within garden
                              beds.
                              i.       the garden beds must be a minimum of 6m2 and contain a mix of shrubs and
                                       grasses.
                      d.      Provisions of sufficient volumes of structured soil media suitable for advance root
                              growth for street trees, in accordance with the written recommendations of an industry
                              accredited horticulturist or arborist.
                      e.      100mm deep mulching and landscaping to any batter within road reserves that exceed
                              1 in 4 slope (25%)
                      f.      Planting works to the median strip and/or roundabout that do not interfere with driver
                              sight lines at any time.
                      g.      Achieve the park-like settings as set out in the Shire Business Centre Zone (Division
                              9) of the Noosaville Locality Plan in the Noosa Plan by ensuring
                              i.       Retention of suitable vegetation within the road reserve through project design
                                       and services location
                              ii.      Limiting the disturbance to the root zones of retained vegetation
                                       (*Refer Advisory Notes)
               54.    All landscape works must be established and maintained in accordance with horticultural
                      best practice with construction techniques that allow for healthy, sustained and vigorous plant
                      growth. All plant material must be allowed to grow to full form.
               55.    All entry statements, fences, batters, retaining walls and buffer/screen plantings must be
                      located entirely within private land and not within the public road reserve.
               56.    All third-party service provider infrastructure must be clearly shown on submitted landscape
                      plans and have landscaping provided to screen the bulk of the infrastructure.
               57.    All landscape works must be maintained generally in accordance with the approved design
                      for the life of the development.
                      Lot 24
               58.    The Applicant must, at no cost to the Council:
                      i.      Dedicate to Council proposed Lot 24 for public transport infrastructure as shown on the
                              subdivision plan; but




                                                                                                           Page 11 of 18
Document Set ID: 24498083
Version: 5, Version Date: 02/02/2026

Page 12

                              ii.      Notwithstanding condition 1, only after amendment to Council’s planning scheme
                                       has taken effect which shows the provision for transit designated only in the
                                       location consistent with Lot 24 on the subdivision plan.
                      Future Environmental Offset
               59.    For the purposes of calculating any environmental offset that might be required for the
                      ultimate development of Lot 3 on SP246584 for the Shire Business Centre, the plan
                      described as 10651BHP Issue C prepared by Norris Clarke & O’Brien Pty Ltd and dated 24
                      August 2020 shows the maximum extent of clearing (i.e. 12.4943ha). For the avoidance of
                      doubt, while the plan shows the maximum extent of clearing for offset purposes, the clearing
                      ultimately undertaken will not necessarily be the maximum extent (noting that the Shire
                      Business Centre is to occur in a park like setting).
                      Infrastructure Agreement
               60.    The Applicant/Owner shall comply with the terms of any Infrastructure Agreement applying
                      to the land.
               5.     REFERRAL AGENCIES

                Referral Status          Referral Agency and Referral Trigger                    Response
                                         Address
                Advice Agency            Energy Queensland        Schedule 10, Part 9,           Advice dated 8 January
                                         Level 1, 26 Reddacliff   Division 2, Table 1, Item 1    2026               Ref
                                         Street, Newstead QLD     (10.9.2.1.1)               –   ECM36637435-
                                         4006                     Reconfiguring       a    lot   36851965
                                                                  subject to an easement
                                                                  for the benefit of a
                                         [email protected]
                                                                  distribution entity under
                                         om.au
                                                                  the Electricity Act for a
                                                                  supply network; or part of
                                                                  the lot is within 100m of a
                                                                  substation site

               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
               Building and Construction Industry (Portable Long Service Leave) Levy
               1.     The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855.
               Co-ordination of Operational Works Assessment
               2.     Additional application fees apply to Operational Work applications where the different
                      aspects of the works are lodged separately. Significant savings in application fees will result
                      if all works are lodged in a single application.
               Qualified Person
               3.     For the purpose of preparing a Geotechnical Report, and for certifying geotechnical stability
                      for the development, a qualified person is considered to be a person who:
                      a.      is a Registered Professional Engineer of Queensland (RPEQ); and
                      b.      has a degree in civil engineering or engineering geology; and
                      c.      has a minimum of 5 years experience in the field of geotechnical engineering or
                              engineering geology.




                                                                                                         Page 12 of 18
Document Set ID: 24498083
Version: 5, Version Date: 02/02/2026

Page 13

               Preparation of a Preliminary Construction Management Plan
               4.     A preliminary Construction Management Plan must be submitted with any Operational Works
                      application and must address the following:
                      a.      traffic management during all aspects of the construction phase including:
                              i.       a Traffic Management Control Plan in accordance with the Manual of Uniform
                                       Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                                       control measures prior to construction.
                              ii.      maintenance of safe pedestrian access for the areas affected by the works during
                                       and after daily construction has ceased.
                                       iii. proposed fencing to the site during the construction phase of the
                                       development.
                              iv.      approval of the Traffic Management Control Plan by the Department of Transport
                                       and Main Roads (DTMR) for any works on State controlled roads.
                                       v.   provision for worker car parking.
                      b.      maintenance and protection of water quality and existing drainage lines through the
                              construction site, through the implementation of appropriate erosion and sediment
                              control measures
                      c.      works programme identifying key components of the works and their respective
                              durations
                      d.      establishment of a communication protocol with the general public, adjoining owners,
                              emergency services and local businesses to advise of agreed construction times,
                              impacts on traffic, services and other relevant issues
                      e.      identification of complaint management procedures including:
                              i.       contact details for the on-site manager
                              ii.      dispute resolution procedures
                      f.      details on the location of external fill sites/sources, the haulage route, type of vehicle
                              to be utilised during filling operations and frequency of usage. NB any damage to the
                              existing road system as a result of haulage operations shall be fully repaired at the
                              applicant’s expense
                      g.      it is acknowledged that the preliminary Construction Management Plan will be a draft
                              document requiring finalisation upon appointment of the Principal Contractor employed
                              to construct the works and a final document will be required to be submitted at the
                              PreStart Meeting for the project.
               Private Infrastructure
               5.     All private infrastructure for the development must be designed to meet the planning scheme
                      requirements unless otherwise agreed by the relevant authority.
               Qualified Person
               6.     For the purpose of preparing a Landscape Plan, a qualified person is considered to be a
                      landscape architect, landscape designer and/or horticulturist with a minimum of 3 years
                      current experience in the field of landscape design.
               7.     For the purpose of preparing an Arborist Report, a qualified person is considered to be a
                      person with either:
                      a.      ISA certification; or
                      b.      a Diploma of Arboriculture in addition to a minimum of 3 years current experience in
                              the field of arboriculture.




                                                                                                        Page 13 of 18
Document Set ID: 24498083
Version: 5, Version Date: 02/02/2026

Page 14

               8.     For the purpose of preparing a Fauna Management Plan, a qualified person is considered to
                      be an ecologist with a minimum of 3 years current experience in the field of fauna assessment
                      and management.
               9.     For the purpose of preparing a Bushfire Management Plan, and for certifying compliance
                      with the bushfire requirements of this Decision Notice, a qualified person is considered to be
                      an ecologist with a minimum of 3 years current experience in the field of bushfire assessment
                      and management.
               7.     PROPERTY NOTES

               RAL18/0023 – Stormwater
              The following notation applies to approved lots 4, 5 and 6:
              These lots are part of a larger development covered by permit RAL18/0023. As part of the
              stormwater management documented for this application, it was determined that all lots are
              required to treat stormwater originating within the lot on-site, with the infrastructure to be
              documented as part of any future MCU over each lot. Conditions are provided on permit
              RAL18/0023 to enforce this commitment, even though the area of this lot would usually exempt it
              from providing on-site stormwater treatment
               RAL18/0023 - Stormwater
              The following notation applies to approved lots 12-15:
              Proposed Lots 12-15: Bioretention devices provided within this lot as part of RAL18/0023 are
              provided solely to treat runoff associated with the bushfire access and car parking and is not to be
              used for treatment of the developed site runoff. Additional stormwater quality infrastructure is to be
              provided as part of any future MCU application over the lot. The bioretention devices lots must be
              maintained in accordance with the Water by Design (2009) Maintaining Vegetated Stormwater
              Assets (Version 1)
               RAL18/0023 – Access
              The following notation, or similar applies to approved lots 3, 5, 6, 7, 11-14 and 17-22: Special
              conditions apply to the access to the lot. Refer RAL18/0023

              The following notation, or similar applies to approved lots 4, 8, 9, 10, 15 and 16:
              Vehicle access to the lot is limited to the constructed driveway. The driveway must not be altered
              or relocated without prior written agreement from Council.
               8.     VARIATION APPROVAL DETAILS

               Not Applicable.
               9.     FURTHER DEVELOPMENT PERMITS REQUIRED

                Type of Development Permit Required              Subject of the required Development Permit

                Development Permit for Operational Works         Roadworks, Earthworks, Drainage Works,
                                                                 External Works, Rehabilitation, Vegetation
                                                                 Clearing, Landscaping.

                Development Permit for Building Works            All building work.

               10.    SUBMISSIONS

               Not applicable.




                                                                                                     Page 14 of 18
Document Set ID: 24498083
Version: 5, Version Date: 02/02/2026

Page 15

               11.      RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               12.      OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available online at
               www.noosa.qld.gov.au or at Council Offices.


               Yours faithfully,
               Nadine Gorton
               Coordinator Planning | Development Assessment
               Development & Regulation



               Enc:     Referral Agency Response
                        Appeal Rights
                        Approved Plans/Documents
               cc.      Energex – [email protected]

               DECISION NOTICE HISTORY
               •     Original Decision Notice – 3 September 2020 – Refused
               •     Planning & Environment Appeal No. 765/2020 allowed and RAL
                     approved - 1 lot into 23 lots

               •     Generally in Accordance – RAL18/0023.01 – 14 July 2022.

               •     Decision Notice – Minor – RAL18/0023.02 – 27 Jan 2026, with an
                     amendment to condition 53(a).




                                                                                                    Page 15 of 18
Document Set ID: 24498083
Version: 5, Version Date: 02/02/2026

Page 16

                                       Referral Agency Response
                                       PLANNING ACT 2016 & PLANNING REGULATION 2017




                                                                                      Page 16 of 18
Document Set ID: 24498083
Version: 5, Version Date: 02/02/2026

Page 17

Document Set ID: 24498083
Version: 5, Version Date: 02/02/2026

General Advice:

* Compliance with the Electrical Safety Act 2002, including any Code of Practice
under the Act and the Electrical safety Regulation 2013 including any safety
exclusion zones defined in the Regulation is mandatory

Should any doubt exist in maintaining the prescribed clearance to the overhead
conductors and electrical infrastructure then the applicant is obliged under the
Act to seek advice from Energex.

* Any costs incurred by Energex as a result of the works on the easement are to
be met by the property Developer / owner.

= This response does not constitute an approval to commence any works within
the easement. Consent to commence works relevant to the conditions of the
easement is required. All works on easement (including but not limited to
earthworks, drainage and detention basins, road construction, underground and
overhead services installation) require detailed submissions, assessment, and
consent (or otherwise) by Energex.

* All works proposed to be undertaken in close proximity to overhead or
underground electrical lines are to be undertaken in accordance with Energex’s
Works Practice Manual WP 1323. This document refers to various standards,
guidelines, calculations, legal requirements, technical details, and other
information relevant to working near high voltage infrastructure. A copy of
WP 1323 can be found online via Energex's document library (Document library
LEnergex).

Should you require any further information on the above matter, please contact Harriet
Veal on 0427 293 604 or via email at [email protected] faithfully,
Warreet Veak

Harriet Veal

Town Planner

Have you seen our fact sheets?
See the ‘considerations when developing around electricity infrastructure” section of our website
www .enemex.com_aulreferralagency

Page 17 of 18

Page 18

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                 Page 18 of 18
Document Set ID: 24498083
Version: 5, Version Date: 02/02/2026

Used in these records

About this file

File size
432 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval - RAL18_0023 02 (As Published).pdf · 432 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.