Appendix 5 - Landscape Plans
Plans and drawings: the text below has words only, no drawings.
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
19 HILL STREET, POMONA Landscape Plan Package Drawing Schedule · Cultivate subgrade 150mm and re-spread ameliorated stockpiled topsoil to plan prescribed 4.0 Planting 5.0 Maintenance Tasks proposed contours and track-in, 300mm deep for gardens and 150mm deep for turf · Clear and remove all non-organic, deleterious and large organic matter such as rocks greater New Gardens · Maintain whole of landscape works for establishment period of 13 weeks or as in agreement LD1 Drawing Schedule, Specifications than 40mmØ, tree roots, trunks, limbs, and stumps from all areas to be landscaped. · See 1.0 Topsoil for cultivation and topsoil requirements. with Owner. LD2 Finishes and Planting Schedules · Ensure smooth, flowing, even grades and positive drainage with no ponding to fall · Spread ameliorated site topsoil or A.S. 4419 imported organic topsoil to a depth of 300mm Irrigation and Watering percentages shown on plan, 3% (minimum 2%). Finish grades shall blend into existing grades over prepared garden areas and trim. · Every day for the first two weeks (unless it rains adequately) LD3 Details providing a natural appearance with no abrupt edges. Trim topsoils for gardens and turfing 2% · Crown garden beds 100mm H at centres to drain positively. · Every 2-3 days during the balance of the establishment period or as needed if hot and dry LP1 Planting Plan minimum slope away from all structures to pits or swales. · Mulch gardens with LA approved A.S. 4454 imported organic mulch as specified 100mm deep (unless it rains adequately). settled. Leave 20mm between top of mowing edge and planting area mulching. If mulched · Once a week there after. 2.0 Landscape Construction areas are >1:4 sloped, install open weave pinned jute net over mulch once settled. · If turf sprinklers are installed, check turf rotor head radius once per month to ensure spray Landscape Specifications · All supplied topsoil and mulch to comply with current A.S. and free of weeds, seeds head layout provides head to head coverage - adjust as required. Levels (specifically Nutsedge), pests including fire ants and soil borne viruses and diseases. Mowing These landscape plans must be read in conjunction with the appropriate statutory approvals and · See plan for engineer's plan levels and proposed levels. · First Mow - Once after 10 days if there is rapid growth or 14 days after installation and/or Australian Standards and with the Operational Works Landscaping Decision Notice once issued. · Verify all levels, conditions, and utility locations in-the-field including all inverts. If a Tree Planting 50mm high. Do not remove more than 31 of grass height at any one time. These plans have been developed to comply with Council's Planning Scheme-Landscape Code. discrepancy occurs notify superintendent and/or LA. · Refer to street tree and tree planting details (as applicable) for information. · Mowing Thereafter - 40mm H remaining 11 weeks then 25mm thereafter. Mow once a week · Levels to be confirmed by a qualified/licensed surveyor. See plans for level sources. · All trees to be certified to A.S. 2303:2018 'Tree stock for landscape use' and comply with this during summer, once every two weeks in spring and autumn, and once a month in winter or as 1.0 General Notes · Grade evenly between prescribed levels and finish surface levels ensuring positive drainage specification. required if there is a lot of growth or as desired. and no ponding areas. · Landscape contractor to peg street tree positions for approval by superintendent before Topdressing Abbreviations · Except where indicated or specified (i.e. allowing for mulching and sheet flow over settled excavation. · When lawn areas have become established, and immediately after the first cut, top-dress lawn · A.S. - Australian Standards · DBH - Diameter at breast height (1.4m) turf), finish surface levels are to be flush with adjacent surfaces and graded evenly between · All trees to have a full and even crown. lightly to a depth of 10mm with a light sandy loam-based topsoil. Rub the dressing well into the · E.P. - Establishment Period · H.D. - Hot Dipped design and finish levels. · Install trees at locations indicated on the plans, per notes and details herein. joints and correct any unevenness in the turf surface. Topdressing is not to be carried out · LA - Landscape Architect · MP - Maintenance Period · Co-ordinate establishment of levels with superintendent. · Mulch tree gardens with minimum 1800mmØ collar of AS4454 organic mulch as specified during the winter months. · MPA - Megapascals · m² - square metre · m³ - cubic metre 100mm deep settled. Do not mulch within 50mm of trunk / plant stem. Weed Removal: As required to reduce competition and seeding. · NATA - National Association of Testing Authorities · N/A - Not applicable Drainage · Edge trees per details. Plant Replacement: Immediately replace plants that die or fail to thrive, are damaged or stolen, · O.C. - On centre · PE - Pool Equipment · S - Spread · All damaged stormwater pipes are replaced and relocated as necessary. · Tree staking - per details. with plants of the same species and of similar size and quality unless otherwise specified. · NC - Noosa Council · typ. - Typical · Ensure site drainage can occur positively to whole of site, minimum 2% away from any · All trees to be located minimum; Stakes and Guys: Adjust and/or replace stakes and ties where required. Remove staking and · uPVC- Unplasticised Polyvinyl Chloride · VPZ - Vegetation Protection Zone buildings and where paths, edges, and gardens etc. may impede drainage; refer to LA before - 1000mm from back of kerb (or in-between kerb and footpath where applicable (allowing guying when instructed by the superintendent. continuing works. for service setbacks) or as dimensioned on plans, from underground services (confirm Re-mulching: As required to maintain a consistent depth, 100mm settled, until plants are · These plans are not for tender or construction. There are no existing trees to be removed. · Drainage works to correlate with and not disturb adjacent land. locations on-site prior to pit excavation) and stormwater pipes established or Off-maintenance respectively. · See legend for plan symbols and plans for locations. - 1500mm from concrete paths and pavement profiles, horizontally and vertically from Monitoring: Provide a monthly report on completed tasks. Preliminaries · Landscape field pits to be 300mm x 300mm x 450mm 'Polycrete' pits with hot dipped sewer lines, and property connections · Refer to plans by others for all services locations, footpath works, levels (other than those galvanised surface grate/lid (non-heel slip grates in paved areas). Determine requirements - 2m from stormwater catch pits Warranties indicated on these plans) and boundaries. All services and related infrastructure including on-site in addition to those on plans. - 3m from fire hydrants, driveway crossovers, adjoining, new, or perpendicular lot · Warranties or guarantees specified shall name the Owner as warrantee. Register with street lighting shown on these plans are indicative only. · All drainage pits and subsurface drains to be connected to existing stormwater drainage boundaries manufacturers as necessary. Retain copies delivered with and components and equipment to · Call 'Dial Before You Dig 11 00' prior to any excavation. system. Refer engineer's drawings for drains and hydraulic services. the Owner. · Before work commences the subcontractor is to organise a pre-start meeting with the LA to · Stormwater drainage to be Ø100mm minimum uPVC SN8 AS 1260.2017 solid drainage pipe. General Planting · Warranties and/or guarantees to be submitted to the Superintendent to deliver to Owner within establish scope of works management procedures and clarify any issues. · Subsurface drainage to be Ø100mm minimum black slotted HDPE AS2439.1 pipe centred in · Refer to detail(s) herein respectively. fourteen (14) days after practical completion. · Install tree protection measures as per plans and detail. 300mm x 300mm gravel trench. Gravel to be Ø6 - 10mm No-fines aggregates surrounded by · Supply and place plants according to plant schedule, plant setout notes and plan locations. · Commence Warranty periods at practical completion or at acceptance of installation, if · Prior to commencing construction works, verify dimensions, levels and location of site LA approved permeable bidim or geotextile fabric. See Detail(s) for more information. · Where discrepancies occur advise superintendent prior to planting. acceptance is not concurrent with practical completion. services, refer engineer's drawings generally. · Furnish and install 1m³ of Ø75mm - 150mm washed, sound, rounded Mary River · Ensure plants are placed and planted at equal centres, staggered, not in rows unless indicated · If installation is not by manufacturer and product warranty is conditional on the manufacturer's · Dimensions take precedence over scale. gravel cobbles / spalls over pinned permeable geo-fabric at all new landscape drainage on plans. approval of the installer, submit the manufacturer's written approval of the installing firm. · Contractor to review all schedules herein to confirm their correlation to these plans. Where daylight points. · Mass and group plantings to be spaced evenly in a triangular pattern in odd numbered groups discrepancies occur within landscape documentation refer to LA prior to provision of tender · Where and if additional drainage is required the following applies: to achieve optimum cover related to mature plant size and form. Deliverables pricing and/or construction. - Allow for seepage interception sub-surface drainage where paths and landscape works · Shrubs and spreading groundcovers to be set back a minimum 800mm from roads, kerbs, · Warranties impede drainage (to be coordinated on site). garden edges and paths to allow for mature plant form. Confirm with LA which require more · Irrigation System As-built plans in .dwg and PDF formats Erosion and Sediment Control - Allow for 300mm x 300mm gravel trench with Ag-line under path, discharge to natural distance. · The landscape contractor to implement and maintain for the contract duration, best practice drainage lines. · All plants must be planted using one 'Agriform' 10g fertiliser tablet (N.P.K. 20-4.3-4.1) at a rate Certifications erosion and sediment control measures in accordance with the manual for erosion and - Allow for 300mm x 300mm lateral collection trenches extending nominal 1m either side of 1/140mm, 2/200mm, 3/300, 4/45 litre and above pot sizes, and one 5g tablet for tubestock. Furnish LA with the following certifications prior to Practical Completion: sediment control (Maroon Manual), good environmental practice and the consulting civil of low point. Use phosphorous free tablets for Banksias, Grevilleas, and Callistemons. · A.S. 2303:2018 Tree Stock for Landscape Use engineer's specification for erosion and sediment control. Penalties and fines for · Excavate plant pit, cultivate subgrade to 150mm and scarify plant pit walls. · A.S. 4419 Topsoil non-compliance will apply. Fencing · Fill plant pit with water, allow to drain before planting. If pit does not drain within 24 hours, · A.S. 4454 Mulch · Install silt control fencing in accordance with site environmental management plan and local · Supply and construct fencing per plans, details, and Finishes Schedule. notify superintendent and correct drainage. · Turf authority regulations. · Soak plants thoroughly before removing from container. · Sediment and erosion control devices to be installed where necessary and as directed on site Edging · Remove plants from containers / bags / tubes carefully and inspect rootball, remove old matted Sources by superintendent. · Supply, install, and maintain edges as specified and shown on the plans and details and and coiled roots to expose young roots. All stock to be free of structural defects above and · Survey: Axis · All sediment and erosion control devices are to be installed in accordance with manufacturer's Finishes Schedule, specifically where new gardens are located adjacent to new turf areas. Tie below soil line (i.e. no girdled roots). · Architecture: Ausmar / ALT Design specifications. off edge ends perpendicularly to paths, kerbs, and path joints wherever possible. · Do not mix soil from hole with mulch and do not compact plant pit. · Civil Engineering: DME · The contractor is responsible for ensuring sediment and erosion control devices are inspected · Install fertiliser tablet(s), install plant, backfill plant with ameliorated site topsoil or imported and maintained as follows; 3.0 Irrigation - If Installed A.S. 4419 topsoil. a) During construction: Daily during dry weather, prior to predicted storm events, twice · Water plant in well and maintain soil moisture levels through E.P. daily during prolonged rain Preliminaries b) During establishment period: Weekly during dry weather, prior to predicted storm · Liaise with relevant Noosa Council authorities and obtain any approval as required. New Turfed Areas events, twice weekly during prolonged rain · Comply with government standards and co-ordinate with other trades.· · See 1.0 Topsoil for cultivation and topsoil requirements. · All stockpiles are to be protected with suitable erosion control devices and graded to ensure · Check locations of penetration/conduits and install where required. · Trim topsoil, fill depressions and provide even falls as indicated on drawings. control of runoff. · Contractor to provide qualifications and insurances before construction. · Finished turf grades/contours shall be smooth and undulating, free from deleterious materials, · Coordinate installation of sediment and erosion control devices with civil contractor to ensure · Irrigation system is a 'Design + Build' system. debris, large clods of soil, stones, and organic matter, positive flowing minimum 2% slopes and compatibility and consistency in control measures. no water holding areas. Co-ordinate on-site with LA and ensure levels are approved prior to · All exposed surfaces, once completed shall be immediately stabilised to prevent erosion. Provide: laying turf. Where turf meets hard edges, adjust finish topsoil levels to allow stormwater to flow · Supply and install a new: Automatic electronic controller with a lockable stainless steel case, unimpeded over laid turf to low area respectively. Site Works rain sensor, backflow preventer per Council standards with a stainless steel enclosure, · Supply and lay 'A' grade turf per plans and schedules. · Remove all unwanted material, deleterious and operational debris from site. isolation valves, pressure regulator(s) as required, Irritrol System control valves for drip, check · Where turf is installed on slopes >20% pin turf to industry standards. Remove pins once turf is · If provided levels are not functional refer to the site superintendent and/or LA. valves, black plastic valve boxes, looped mainline, thrust blocks (as required), fittings, and drip well established. · Civil engineering designs have provided a positively drained site. If there are drainage issues lines and emitters for gardens. If sprinklers are installed for turf areas (i.e. overhead spray), · Water turf in well and apply water to maintain soil moisture until established. refer site superintendent. sprinklers / rotors shall be Hunter or LA approved equal. · Refer to 2.0 Landscape Construction - Drainage for more information. · Turf area irrigation to have head to head coverage and no overspray onto hard surfaces. Check head radius once per month to ensure spray head layout provides head to head Conduits coverage. · Furnish and install 2 - 150mmØ solid A.S. 1260:2017 uPVC SN8 or SN10 piping · Install uPVC conduits, 2xØ of pipe used, under all hard surfaces prior to hard surface perpendicularly under all footpaths that bisect landscape areas for irrigation and landscape construction. Extend ends of conduits 300mm beyond surfaces, cap (do not glue caps to drainage purposes. Extend ends 300mm beyond paths, each side and cap (do not glue caps). conduits) and install used survey pegs at ends for reference. Mark and install recycled surveyor's pegs at end caps for identification. · All valve boxes to be located in gardens (not in turf or swales) 300mm from and perpendicular to surfaces. Topsoil - Harvesting, Stockpiling, Amelioration, Re-use and Spreading · All mainlines to have 450mm of topsoil cover and 300mm for lateral lines. · Harvested and stockpiled site topsoils if practical and reinstall per the following specifications · Align all mainlines and lateral lines 1m from all trees and in close approximation to new paths in respective landscaping areas. / hard surfaces as possible. · Stockpiled topsoil shall not be in any preserved vegetation areas or within three metres of · Do not irrigate road reserve areas. preserved vegetation driplines. · For practical completion ensure whole system is operational. · Topsoil stockpiling shall occur in an area adjacent to the stripped area(s) or area by engineer · Irrigate plants and turf ensuring adequate plant moisture is maintained during establishment. or owner which will not hinder visibility for inspection of the work. · Adjust system post establishment so it operates during dry and hot periods so plants and turf · Landscape contractor to conduct soils analyses tests to stockpiled topsoils. Furnish LA with areas are adequately watered to maintain healthy and vibrant conditions. results. Ameliorate site topsoils per recommendations prior to re-spreading. Landscape · Contractor to provide a twelve month guarantee, maintain against faulty workmanship and contractor to allow for pH balancing and nutrient ameliorations. All soil testing to be conducted materials for system from date of practical completion. by a NATA accredited lab. · Provide CAD 'As-built' drawing and PDF of same to Owner and a laminated copy in the · Should amended site topsoils be insufficient in quantity, contractor to import AS4419 topsoil controller door for reference when applying for practical completion clearly showing main-line and spread to proposed plan finish levels. Prior to spreading, imported topsoils shall have runs and sizes, valve types / station numbers / valve design pressure, head types and soils analyses test as per above. Amend Imported soils per test results prior to spreading. locations. NOTES: This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736). Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN Any reproduction or unauthorized use without written consent from Job No: 2459 Proposed Multi-unit Development Landscape Architecture, Urban Design, Land Planning Bird Landscape Design is strictly prohibited. 19 Hill Street, Pomona, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia Do not scale from PDF plans. M: +614 7705 5222 LD1 Drawing Schedule, Specifications E: [email protected] 18.8.24 A For Application BB BB Sheet Title Sheet 1 of 4 Client: Owens Family Pty Ltd W: birdgolfdesign.com DATE ISSUE DESCRIPTION DRAWN CKD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 4 sections
Section 2
Finishes Schedule Planting Schedule
Code Item Product / Description Specifications, Size, Finish, Colour Dealer, Manufacturer Code GENUS species - Common Name Size Quantity Notes
Hardscape Trees
STE Garden Edge Steel Garden Edging 'FormBoss' 'Redcor', 150mm H x 2mm gauge including tapered 300mm stakes. Install per manufacturer's Formboss, local representative: BAC cit BACKHOUSIA citriodora - Lemon Scented Myrtle 25 L 1
specifications. Refer to Specifications and Detail. Set edging 25mm into property when adjacent to road Tranquil Building and
reserve boundary. Landscapes BAN int BANKSIA integrifolia -Coastal Banksia 25 L 1
07 5497 8774
Shrubs
Softscape
ALP cae ALPINIA caerula - Native Ginger 200mm 6
Topsoil Ameliorated site topsoil as per soil testing results or Excavate gardenbed areas 300mm deep and turf areas 150mm deep into existing ground. Cultivate subgrade 150mm. Nominated by contractor and
import A.S. 4419 topsoil for garden bed and new turf Backfill turf areas 150mm deep and garden areas 300mm - mounding in center with ameliorated site topsoil or approved by superintendent. BAC myr BACKHOUSIA myrtifolia - Grey Myrtle 200mm 13
areas. Provide soil testing results for topsoil and A.S. 4419 topsoil. Refer to details.
certification to Landscape Architect. BAN rob BANKSIA robur - Swamp Banksia 200mm 7
Gravel Mulch Gravel mulch and around pits (adjust gravel sizing as Install Ø40-70mm decorative gravel mulch, 150mm deep presenting 100% cover over pinned geo-fabric. Mulch colour Nominated by contractor and COR rub CORDYLINE 'Rubra' 200mm 6
required for pits only so it does not fall through pit grate) to match secondary architectural colour and kept 50mm away from plant stems. Provide specified organic mulch around approved by superintendent
plant stems in gravel mulch areas; Groundcovers - 200mm radius, Shrubs - 300mm radius, Trees - 500mm radius. Groundcovers
Confirm width between grates to ensure gravel will not fit between, if so install gravel diameter greater than grate width.
AUS dul AUSTROMYRTUS dulcis - Midyim 140mm 29 800mm O.C.
Organic Mulch Mulched Gardens Install 100mm deep settled, 25mm+Ø Hoop Pine organic mulch to all gardens keeping mulch 50mm clear of plant Nominated by contractor and
stems. On batters steeper than 1:4, install pinned open weave jute netting over mulch. approved by superintendent
CIS ant CISSUS antarctica - Kargaroo Vine 140mm 6 1m O.C.
Turf Turf Refer to Plant Schedule and Detail Nominated by contractor and
LOM hys LOMANDRA hystrix - Mat Rush 140mm 29 1m O.C.
approved by superintendent
ZOY ten ZOYSIA tenuifolia 'No Mow Grass' 140mm 13 370mm O.C.
TURF ZOYSIA 'Empire' Rolls
'A' Grade, healthy, weed and pest free
NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
Any reproduction or unauthorized use without written consent from Job No: 2459 Proposed Multi-unit Development Landscape Architecture, Urban Design, Land Planning
Bird Landscape Design is strictly prohibited. 19 Hill Street, Pomona, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
Do not scale from PDF plans. M: +614 7705 5222
LD2 Finishes and Planting Schedules E: [email protected]
18.8.24 A For Application BB BB
Sheet Title Sheet 2 of 4 Client: Owens Family Pty Ltd W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD
Section 3
Determining the Radius of the TPZ (Tree Protection Zone)
· DBH (Diameter at Breast Height) - nominal trunk diameter at 1.4m above ground level
· TPZ should not be less than 2m nor greater than 15m (except where crown protection is required)
· TPZ = DBH X 12
· TPZ of palms, other monocots, cycads and tree ferns should not be less than 1m
· Variations and encroachments to the TPZ in accordance with A.S. 4970-2009
Fluorescent orange 5.5k.g
barrier fencing mesh secured
/ tied 100mm below top of star Plant pit 2x width of respective pot.
Measurement 2x pot Ø Shrub / groundcover / tufty
pickets at 300mm centres Scarify all pit walls and bottom, typ.
taken for DBH grass plant species per plan
Yellow plastic capped Pot Ø
Fencing
star pickets
painted yellow Backfill plant pit with specified 100mm deep and settled organic
Vegetation to 1200mm
1.4m
topsoil, avoid compaction, typ. mulch as specified, keep minimum
be protected
50mm from plant stem. Form shallow
Ground line dish drain to base of plant, typ.
Crown DBH Garden topsoil as specified,
600mm
TPZ avoid compaction, typ.
NOTES:
100mm, typ.
· Protective fencing to be installed around the TPZ to the commencement of any site works
· Protective fencing identifying the TPZ, to be visibly signed within the development site. Lettering to comply with Slow release fertiliser as specified.
A.S.1319. 2x rootball depth, typ. Use phosphorus free tablets for
· Fence posts and supports to have a diameter greater than 20mm, located clear of roots Banksia, Callistemon and Grevillea
· Where tree protection fencing cannot be installed, trunk, branch and ground protection as specified by the project species.
Arborist in accordance with A.S.4970-2009 150mm deep cultivated
150mm, typ.
· Within TPZ, mulch to a depth of 50-100mm only for disturbed land subgrade, typ.
· Maintenance of TPZ includes regular monitoring of soil moisture levels and weed removal by hand and controlled by
appropriate use of herbicide Existing subgrade, typ.
· TPZs to be monitored, inspected and certified by the project Arborist
· Removal of tree protection measures at practical completion or as indicated by the project Arborist
1 Tree and Vegetation Protection Detail N.T.S. 4 Potted Shrub, Groundcover Planting
LD3 Typical Detail LD3 Typical Section Detail N.T.S.
NOTES:
Ensure crown of rootball level is set higher than adjacent finished ground levels to prevent excessive ponding around rootball.
When footpath is adjacent to street tree install root barrier to footpath side of plant pit as per notes above.
1800
Full and even crown, typical
2 - 50mm x 50mm x 2400mm F14 hardwood
centrally pointed non-treated stakes to be
driven vertically into ground outside of the
Note:
50mm wide hessian tree ties rootball and shall have a finished height lower
The top of the turf's thatch should be 10mm below any hard surface low point(s) to allow surface drainage.
wrapped loosely around trunk, than the tree's lower lateral limbs
then a figure 8 and secured to
stake with galvanised nails or Form shallow saucer shaped depression 600mm
staples. Position tree tie between typical
around base of plant and keep mulch 50mm
1/3 to 1/2 overall height of tree.
from trunk base
100mm deep organic mulch as specified.
Mound mulch at edge of plant pit to collect
water to fall down edges of plant pit. Varies,
refer
Turf as specified Turf as specified Plans
150mm Topsoil as specified
150mm cultivated
Steel Edging as specified subgrade and pit walls
Tree pit to be excavated to nominal depth of
600mm. Backfill hole with 100% friable
Slow release fertilizer ameliorated site topsoil firming progressively.
100mm mulch as specified as specified All excavated fill to be removed off site. Scarify
Tapered Edging Stake as specified all sides of plant pit, typical.
300mm Topsoil as specified
150mm cultivated subgrade, typ.
Existing subgrade Road Back of kerb or hardstand Turf Roll, typical
2 Steel Garden Edge N.T.S. 3 Tree Planting - in Garden or Turf 1:30 5 Turfing
LD3 Typical Detail LD3 Typical Section LD3 Typical Plan Detail N.T.S.
NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
Any reproduction or unauthorized use without written consent from Job No: 2459 Proposed Multi-unit Development Landscape Architecture, Urban Design, Land Planning
Bird Landscape Design is strictly prohibited. 19 Hill Street, Pomona, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
Do not scale from PDF plans. M: +614 7705 5222
All dimensions in millimetres unless noted otherwise.
LD3 Details E: [email protected]
18.8.24 A For Application BB BB
Sheet Title Sheet 3 of 4 Client: Owens Family Pty Ltd W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD
Section 4
-D SW W-D
SW
-D
E
-D W-D
SW W-D
E
-D SW W-D
SW W-D
Planting Plan Legend Detail
-D
E
7 BAN rob
W-D
SW
-D W-D
SW W-D E
-D W-D
treet
SW -D
SW
-D 10 AUS dul W-D
E W-D
T Overhead Electric Service
S
W-D
SW W-D
1 BAN int
l OE
-D -D
l
SW E
Hi
SW
-D -D
SW
W-D
T W-D Refer to plans by others to confirm locations and
W-D E
SW
-D
SW
-D SW
W-D T
W-D
locate on-site prior to commencing works
1 BAC cit
-D
E W-D
92.75
-D
SW W-D
93.5
92.5
W-D
T E
92
93.25
13 ZOY ten
-D
W-D
SW
Sewer Service
.25
0
PP
W-D
0
93.00
-D E
SW W-D T
S
W-D
Refer to plans by others to confirm locations and
93
SW
-D W-D
W-D
.75
-D
91
. 75 W-D
T
E W-D
locate on-site prior to commencing works
94
SW
W-D T
.00
-D W-D
SW 91 E
.00
.5 W-D
SW
-D 0
T E
W-D
Telecom Service
92
W-D
W-D
94
T
91
-D
SW
Refer to plans by others to confirm locations and
.2
E
.2
W-D
5
W-D
5
W-D
T E
W-D
locate on-site prior to commencing works
W-D
E W-D
W-D
T
W-D
W-D
E
W-D STE
Water Service
T
W-D
E
STE
W Refer to plans by others to confirm locations and
W-D
30 SYZ san
STE
T
W-D E
W-D STE locate on-site prior to commencing works
W-D
E W-D STE
T
W-D
W-D STE
STE
12 LOM hys
E
W-D
< T
W-D STE Stormwater
SW
E
W-D < W-D STE Refer to plans, confirm existing locations and
T
W-D
< E
17
W
< W-D
20.1
STE locate on-site prior to commencing works
W-D
< E W-D 23' STE
STE
60°
W-D < 2 AUS dul TE W-D STE
<
W-D
W-D
Existing Vegetation to Remain 1
T E
STE
W-D-D
94.50
SW W-D
Refer to Detail
-D
W-D
SW
T
E
W-D LD3
STE
-D -D
SW W E W-D
-D -D
SW W
T
E W-D
W-D
T W-D
1 Tree Protection Fencing 1
FT
S
STE
E
Section 5
<W-D W-D
Refer to Specifications, Detail
PP LD3
<
W-D E T
W-D
<
W-D
S
STE
T W-D
W-D
<
E W-D
S
2
FT
W-D
E
5 SYZ san Fencing by builder
STE
W-D 3 COR rub
E S
E W-D
W-D
3 AUS dul
W-D
S
E
Gravel Mulch
6 AUS dul
W-D
E
W-D S Refer to Specifications, Finishes Schedule, Details
E W-D
E W-D
S
Steel Garden Edge 2
E
S ST Refer to Specifications, Detail LD3
94.75
S
Trees 3
Refer to Specifications, Plant Schedule, Detail(s)
LD3
7 LOM hys Shrub, Climber / Vine, / Pruned Shrub 4
RP7
Lot 9
966
9
Refer to Specifications, Plant Schedule and Detail LD3
3 ALP cae
150
3 CIS ant
°23
'
Groundcovers 4
50.2
4 SYZ san 330 Refer to Specifications, Plant Schedule, Detail LD3
°23
92
5 AUS dul
'
91.25
Turf 5
50.2
Refer to Specifications, Plant Schedule, Detail
92
LD3
94
.5
0
91.5
RP7
Lot
966
11
0
9
94
3 AUS dul .2
5
3 COR rub
10 LOM hys
3 ALP cae
13 BAC myr
3 CIS ant
STE
91.
STE
STE
STE
00
STE
2 SYZ san STE
FT2
STE
STE
ST
E
STE
STE
.117
STE ' 20
STE
°23 91.25
STE 240 91.0
0
5
90.7
0
90.5
90.7
5
74
Lot 69
96
RP7
BUILDER NOTE
Builder to review services plans by others to ensure that
none are aligned and / or installed within 1m of proposed
trees during construction.
PLAN NOTES:
See Sheet LD2 for Schedules
Scale in metres Contour Interval: 100mm (new), 250mm (existing)
0 1 2 5 10 NOT FOR TENDER OR CONSTRUCTION
WARNING Scale:
1:150 @ A1 NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
1:300 @ A3
The locations of existing and proposed Telstra, telcoms, NBN,
electricity, sewerage, gas (if any), water and stormwater pipes Any reproduction or unauthorized use without written consent from Job No: 2459 Proposed Multi-unit Development Landscape Architecture, Urban Design, Land Planning
have been furnished and require confirmation. Prior to and Bird Landscape Design is strictly prohibited. 19 Hill Street, Pomona, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
during construction obtain the location of all services Do not scale from PDF plans. M: +614 7705 5222
(underground and overhead) from the responsible authority All dimensions in millimetres unless noted otherwise.
LP1 Planting Plan E: [email protected]
18.8.24 A For Application BB BB and designer responsible for the service shown. Adjust
Sheet Title Sheet 4 of 4 Client: Owens Family Pty Ltd W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD landscape design as required to accommodate all services. North