07/2206 - Notification of referral of application material [As Published] · 132007.2206
INTEGRATED PLANNING ACT 1997
!DAS Assessment Checkilst, Version 20, 2 April 2007
State-controtled road matters 2, The application involves: {tick applicable box/es)
For more information refer to Guide 3. Ci(i) development on tand contiguous* to a State controlled road and for -
Unless you answered “none of the above” to Q2, . : ‘
the application triggers referrat to the Department 0) (a) materia change of use assessable against the planning scheme;
sf Maln Roads (DMR) as viene (] (b) reconfiguring a fot unless -
arene apgeumstances OM wil b DMR wi + the total number of lots is not increased; and
be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased;
Sones? of tho IP Reauiaton wil assist you to (1 (c) operational work (not associated with a material change of use assessable against the
concurrence agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above}-
* associated with access to a State-controlled road; or
» for filling or excavation; or
* involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
O ti) development on land not contiguous to a State-controlled road and -
C1 (a) material change of use -
* assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
OD (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
C1 (¢) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above}-
* assessable against the local government's planning scheme; and
¢ mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
EX (iii) none of the above
Clearing vegetation 3. The application involves: tick applicable box/es)
For more information refer to Guide 12. Ci (i)_ materiat change of use —
the appheaton eeuiee eee ne fo %, (a) assessable against the planning scheme;
Paaaiment of Naural Resources and Water (b) on alot containing ~
ian agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRW is a * if there is no property map of assessable vegetation for the lat - remnant vegetation;
en reg® aaency for the application in relation {c) where the existing use of the land is a rural or environmental use; and
If you ticked Q3(i) or (if), your application requires (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
referral to NRW for assessment regardless of oO {ii) reconfiguring alot—
whether vegetation clearing is proposed or not. .
(a) on alot containing a Category 1, 2 or 3 area shown ona Property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
(b)_ where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
CI (iii) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
{b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or recon figuring a lot mentioned in (li) - complete Part J of
Form 1
{iv} none of the above.
Strategic port and 4. The application involves:
For more information refer to Guide 11. LJ {i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
If you ticked (i) - the relevant Part Authority is the Act) - complete Part | of Form 1
assessment manager for the application. .
If you ticked (i) Queenstand Transport is a C1 (i) a materiat change of use that is inconsistent with the land use plan approved under the
concurrence agency far the application. TI Act for the strategic port land - complete Part ! of Form 1
EX] (ili) none of the above
4 Land contiquous to a State-contolled read is defined in schedufe 14 of the IP Regulation to mean {and - if pert of the land is within 100m of the State-conirolled Toad, ur that 1s art of a fuiure State-
controlled road.
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2206 - Notification of referral of application material [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.