Council archive · source document
07/2206 - Notification of referral of application material [As Published] · 132007.2206
INTEGRATED PLANNING ACT 1997 DAS Assessment Checklist, Version 20, 2 April 2007
Operational work that is tidal work or |9. The application involves operational work that is: (tick the applicable box/es)
work in coastal management district i) tidal work’ as defined under the Coastal Protection and Management Act 1995 (the
For more information refer to Guide 18. For . , ig
more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work — complete Part M of Form 1; or
local goverment tidal areas refer to Guide 24. C7 (ii) tidal work that is prescribed tidal work"' other than in a canal"? -complete Part P of Form 1: or
answered “i f the above" to G9, es . abs veges
thoantcatn requires assessment by the O fii) carried out within a coastal management district under the Coastal Act and for — complete
Environmental Protection Agency (EPA). Part M of Form 1 if any box/es (a) to (i) below are ticked.
tan agency other than EPA is the assessment Oe) constructing or installing works in a watercourse between MHWS and HAT (ie.
manager for the application, EPAis a other than those works in tidal water) where the development has been determined not
concurrence agency for the application in x "
relation to this matter. to be assessable against the Water Act 2000 ;
Local government is the assessment manager OO) constructing a canal’? intended to be connected to tidal waters;
t thed tidal work. . a
for all reser C1 (©) constructing an artificial waterway:
Old) reclaiming land under tidal water;
Oe) disposing of dredge spoil or other solid waste material in tidal water;
On interfering with quarry material on State coastal land above high-water mark:
Oa) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
O(n) femoving or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
Di constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
EI (iv) none of the above.
Operational work below high water |10. The application involves operational work that is: {tick the applicable box/es)
mark information refer Guide 18. For (1 (i) tidal work's as defined under the Coastal Protection and Management Act 1995 (the
more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
local govemment tidal areas refer to Guide 24, CO (ii) tidat work that is prescribed tidal work's - complete Part P of Form 1: oF
red * f the above" to fy vag: «cies
ato homo ‘niggers retort to. C1 (ii) carried out within a coastal management district's under the Coastal Act and for -
aurea jaod Tranacan SAD ert ate C1(a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
. Mof Form 1;
Local governmentis the assessment manager ~~ ;
for all prescribed tidal work. Ob) reclaiming land under tidal water ~ complete Part M of Form 1; or
Oc) constructing a canal’, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;
EI (iv)_ none of the above.
Coastal management 11. The application involves: (tick the applicable boxes)
For more information refer to Guide 18. C1() a material change of use assessable under a planning scheme involving operational
ae alcaton eure the Shove" wy the work carried out completely or partly in a coastal management district’
. the applica assess .. . . . ae
Environmental Protection Agency (EPA). Oi (ii) a material change of use assessable under a planning scheme involving duilding
tf an agency other than EPA is the assessment work, carried out completely or partly in a coastal management district that is -
lication, EPA i . . .
rae ey ee apptcaton in « the construction of a new premises with a GFA'S of at least 1000m2
relation to this matter. » the enlargement of the GFA of existing premises by more than 1000m?2
Diiii reconfiguring a lot assessable under schedule 8 of the IPA where the and is situated
completely or partly in a coastal Management district
Ow reconfiguring a lot'’ assessable under schedule 8 of the IPA and in connection with
the construction of a canal'2 - complete Part M of Fomn 1
EX] (v) none of the above
Se
10 Tidal work is defined in sch 10 of the IPA.
1} Prescribed tidal wark is defined in the Coastal Protection and Management Regulation 2003 and includes certain lidal works completely or partly within a focal government tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a focal govemment tidal area,
15 Coastal management district is defined in sch 10 of the IPA and ‘means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared asa
coastal management district under section 47(2) of that Act.
16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated ‘GFA, go to the planning scheme against which the apglicatian 'S being assessed.
47 Under $117 of the Coastal Protection and Management Act 1995, an apelication for Teconfiguration, where the feconfiguration is associated with the canstruction of an artificial waterway, must be
accompanied by the application for the operational works to construct the arificial waterway.
Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2206 - Notification of referral of application material [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.