Original source · versioned page text
planning report 13.03
The new lights were identified as part of the Noosa District Sports Complex Master Plan 2020-2030
(endorsed by Council 16 January 2020). The lights are needed as part of the Stage 1 works to
realign/rebuild the western rugby league oval to accommodate pedestrian and roadway realignment,
irrigation and improved field drainage (as shown below).
Figure 3: New road alignment with pole location
Technical lux plans are included with the application and demonstrate on field light levels >200 lux
and minimal light spill. No additional mechanical plant equipment is required (external to the towers)
and underground trenching will be provided to the existing electricity network.