Original source · versioned page text
2015-11-10 Infrastructure & Services Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
INFRASTRUCTURE & SERVICES COMMITTEE MEETING REPORT 10 NOVEMBER 2015
In addition to Dr Pages Road project there are a number of projects that have been delivered or
are nearing completion and these include:
Tewantin Splash Park, Playground renewal
Tewantin Daintree Estate Flood mitigation
Sunrise Beach Ben Lexcen stormwater pipe re-lining
Noosaville Tait - Duke Cottage relocation
Tewantin Doonella Street Jetty refurbishment
Noosa Heads Ravenswood Park, Public Jetty rehabilitation
Sunshine Beach NAC – 50m pool hydraulics report
Noosaville Eumundi Rd Landfill Concrete approaches to weighbridge
Tewantin – Splash Park Playground Renewal
Works nearing completion
Tewantin, Daintree Estate - Flood Mitigation Works
Final landscaping works Completed works
Page 23 of 88
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.