H - Revised Integrated Water Management Plan by Cardno (inc MUSIC file) (13.09.19)
Plans and drawings: the text below has words only, no drawings.
Integrated Water Management Plan
Noosa Marketplace : 2-20 HOFMANN DRIVE
Table 7-4 Flooding Impacts (m)
Flooding Impacts (m)
Location 39% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP
P1 -0.08 0.01 0.06 0.07 0.05 0.06
P2 0.00 0.01 0.19 0.22 0.16 0.19
P3 0.00 0.00 0.00 0.00 0.00 0.00
P4 0.00 0.00 0.14 0.19 0.16 0.20
P5 -0.03 -0.02 -0.04 -0.04 -0.04 -0.04
P6 -0.03 -0.03 -0.03 -0.03 -0.03 -0.03
P7 -0.03 -0.03 -0.02 -0.02 -0.01 -0.03
P8 0.01 -0.04 -0.04 0.00 -0.02 0.00
P9 0.00 0.00 -0.07 -0.12 -0.12 -0.15
P10 0.03 -0.03 -0.02 0.00 -0.01 0.00
P11 0.03 -0.01 -0.02 0.00 0.00 -0.01
P12 0.04 0.03 -0.03 -0.03 -0.03 -0.04
*N/A meaning that the point of interest is out of the flood waters or located on a development building
Flood impact mapping for all events modelled is shown in Appendix C, with all results indicating a reduction in
peak flood levels along Hofmann Drive. Of particular interest is P9 with decreases of approximately 150 mm
for the 1% AEP event. At P9 depths decrease from 150 mm (Existing case) to 0 mm in the post development
case (Table 7-4). Some of the events modelled show minor impacts at off site locations. However all of these
impacts are contained within road and/or drainage reserves and therefore deemed to be not significant.
V190428 | 10 September 2019 | Commercial in Confidence 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.