Original source · versioned page text
H - Revised Integrated Water Management Plan by Cardno (inc MUSIC file) (13.09.19)
Plans and drawings: the text below has words only, no drawings.
BUILDING 1 BUILDING 2 BUILDING 3
PH
TENANCY 03 TENANCY 04 05 06 07 08 09 10 TENANCY 11
ST
700 m² 580 m² 150 m² 150 m² 150 m² 150 m² 150 m² 150 m² 500 m²
22 S
T AFF
P ARK
IN G SP
ACE
S
TENANCY 12
2x HRV 325m²
LOADING
TENANCY 13
TENANCY
230m²
CUSTOMER CARPARKING 15
TENANCY 14
100m²
230m²
11
TENANCY 01
2760m²
TENANCY
022 TENANCY
100 m² 021
120 m²
CUS
TOM
ER C
AR P
AR K
ING
DEDICATED TAXI BAY w/ UNDERCOVER
SEATING AND CALL FACILITY (RED HATCH)
TENANCY 16
Development Snapshot
500m²
HOFM
A NN D ADDRESSES (LOT & PLAN): LOT.1 - SP222982: 2-20 HOFMANN
RIVE DRIVE, LOT.4 - SP2465848: 2-18 HOFMANN DRIVE, NOOSA QLD
TENANCY 17
500m²
SITE AREA: 35, 762m²
SITE COVER:
BUILDING 4 (PROPOSED): - TBC
TENANCY 20 (NLA)
ground level =720m²
TENANCY 18 PLOT RATIO:
500m²
level one = 620m² (PROPOSED): - TBC
level one = 600m²
E5 BUILDING HEIGHT:
(BUILDING 1): 7, 200m
B3 (BUILDING 2): 4, 800m
TENANCY 19
500m²
(BUILDING 3): 7, 200m
(BUILDING 4): 11, 800m
AREAS:
BUILDING 1 -
GFA: 2, 785m²
GLA: 2, 680m²
TENANCY 02
OAD
1800m² BUILDING 2 -
GFA: 230m²
KR
GLA: 220m²
REE
IE C
BUILDING 3 -
EEN
GFA: 7, 770m²
GLA: 7, 445m²
BUILDING 4 (Gnd + Levels 1-2) -
GFA: 1, 970m²
GLA: 1, 940m²
TOTAL GFA: 12, 755m²
TOTAL GLA: 12, 285m²
CARPARKS PROVIDED: 348 (TBC)
BIKE RACKS: 69
Rev. Date Description Iss. Appr. Do not scale this drawing. Verify all dimensions on site before commencing Project Status Drawing Title
NOOSA MARKETPLACE
any work. Copyright © 2019 Buchan. This drawing remains the property of
1 14.05.19 FINAL ISSUE FOR COMMENT AJ PS
The Buchan Group Australia Pty Ltd. Reproduction in whole or in part without
2 15.05.19 DEVELOPMENT APPLICATION AJ PS prior consent is forbidden. Date Plotted
4/09/2019 10:40:49 AM
3
4
05.08.19
15.08.19
DEVELOPED DESIGN
AREA RECONFIGURATION
AJ
AJ
PS
PS
File
LOT.1 - SP222982: 2-20 HOFMANN DRIVE, LOT.4 - SP2465848: Date Issued
04.09.19
OVERALL GROUND FLOOR PLAN
5
6
29.08.19
02.09.19
CONSULTANT COORDINATION
TRAFFIC AMENDMENT
AJ
AJ
PS
PS 2-18 HOFMANN DRIVE, NOOSA QLD Scale
As indicated
N
7 04.09.19 GENERAL REVISION AJ PS
Project Number @A1 Drawing Number Revision Brisbane Studio
0 10 20 40 60M
+ 61 7 3859 9222 / buchangroup.com.au
716159 A-DA-0100 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.