CSR Objection Letter

Attached to the e-mail Properly Made Submission (Object No. 23) - Kelly & James McKendry MCU12/0216.

of 4

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

James and Kelly McKendry
11 Kamala Drive

Lake MacDonald, QLD 4563
[email protected]

7 May 2013

Marcus Brennan

Assessment Manager

Sunshine Coast Regional Council

By email - [email protected]

Re: Objection to MCU12/0216 - CSR Clay Extraction

Mr Brennan,

We wish to lodge an objection against the proposal submitted by CSR (SCRC ref
MCU12/0216) to extract up to 90,000 tonnes of clay material from two locations
along Lake Macdonald Drive over a condensed period of 2 years.

It is understood that the proposal would result in a total of 60,000 vehicle
movements over the two year life of the project. From our calculations that
means approximately 580 truck movements along Lake Macdonald Drive per
week, or 116 trips per day based on a five day working week, or 11 trucks per
hour based ona 10 hour day. As evidenced by the current traffic being
generated from the extraction of clay in the area it would appear that these
vehicles will be large tip trucks with trailers.

As a residents of the area who use Lake Macdonald Drive for at least three return
trips a day we are concerned over the following aspects of the proposal:

1. Vehicle safety - Lake Macdonald Drive is a minor rural road with one lane
each way that appears to be designed to cater for rural residential traffic.
The use of this road for the proposed volume of large vehicles poses a
significant risk to driver safety. These slow moving vehicles have the
potential to enter the road at locations where line of sight is not
substantial and cause accidents.

2. Dust — the current truck movements on Lake Macdonald Drive (between
Swift Drive and Lake Ridge Crt) are resulting in significant streams of clay
being left on the road surface. In dry periods this results in dust
generated from trucks and other cars using the road and makes vision
difficult. It is our concern that with the proposed increase in truck
movements and the fact that extraction is proposed further along Lake
Macdonald Road (towards Forest Acres) then the amount and length of
road where dust is generated will increase significantly impacting the
environment and driver safety.

3. .Wet Weather Safety - as noted above the proposed truck movements will
result in the deposition of large amounts of clay on the surface of the road.
It is our concern that in wet weather this will result in very slippery
Log in to download the original file

CSR Objection Letter.pdf · 2.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.