Council archive · source document
09/0392 - Preliminary Building Works Assessable Against the Planning Scheme [As Published] · 172009.392
‘
new bedroom structure to rear
new stacking windows
frames to match existing
new glazed louvre window
frames to match existing
cladding to match existing
new aluminium sliding door
frames to match existing
north ele
1:100
new 180 core filled blockwork
o new waterproofing membrane
existing entry area- doors and sidelight to remain
:
;
new custom orb roof sheeting to
match existing @ 12 degree pitch
new window frames to match existing
timber boarding to match existing
new powdercoat aluminium handrails
with SS wire infil panels, timber handra
refer detall
south ele
- 1:100
bo,
t
\
\
remove existing window, build in opening
existing roof structure
new framed wall under existing roof line
new cladding to match existing weatherboards
new powdercoat alum window-colour
to match existing bronze
new handrail - 200w x 32 thk Or Hwd
dropped ceiling to match
existing timber poles
new timber deck 88x19 hwd
decking on 150x50 CCA hwd
joists at 450 ¢irs
Ue
a”
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0392 - Preliminary Building Works Assessable Against the Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.