Council archive · source document
09/0392 - Preliminary Building Works Assessable Against the Planning Scheme [As Published] · 172009.392
nage ger"
existing roof structure
to remain
existing walls, doors to remain
new timber balustrade ,pe aluminium posts ‘
with SS wire infill
7 a
new roof structure - colorbond roofing
to match existing - 12 degree pitch
10mm plasterboard ceiling to underside of rafters
approx. line of roof structure to be removed
new floor structure - timber joists @450 ctrs
existing timber deck structure
to remain
hg living level
existing timber deck gtructure
to remain
timber flooring to match existing
Seabee eat ost HR SPIN Os FeSO HT ty Beery?
new custom orb roof sheeting
to match existing
new timber boarding to
match existing
new store
existing timber boarding
NI
J ne eee ew bedroom floor level
aN a4 fe i new bedroom ceifng lev
ok SV ee ee. — .” aatisling fathoor teal
>
= new plasterboard ceiling lining |
=
N
4 aN replace exiating decking
P= 2h oo . . antating bedroom fr fe
He ee maint,
ondsting entry tevel
new powdercoat aluminium handrails
SS rigging wire infill, timber handrail
refer detail
paint existing timber potes
new internal stair from living level to loft
refer detail ;'
new blockwork retaining wall
100 thk reinforced cone slab
refer eng. dwgs.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0392 - Preliminary Building Works Assessable Against the Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.