Council archive · source document
09/0392 - Preliminary Building Works Assessable Against the Planning Scheme [As Published] · 172009.392
TRANSMISSION VERIFICATION REPORT . Hi Scott, | refer to the above ‘application and advise that.itis not a properly made application, as defined by Section 3.2. 16) of tha Integrated Planning Act, Speoffically, y . . erty 1%. “en ee . soe . , ee oe : . Inade quate fees tiuve been paid, with an additional $295, 00 required in accordance with Council's adopted Plane ji ing & Development, Fees & Charges required to.be provided, (ie. minimum fee of $685 is applicable) uae Tish S'veeney , From: ae % nt. TIME :; 08/84/2005 15:13 ae NAME : NOOSA SHIRE COUNCIL ye FAX > 61-74471862 o.§ TEL: 4 DATE, TIME 8/84 15:13 FAX NO. /NAME 54566722 DURATION GO: 64: 26 PAGE(S) 82 RESULT OK . MODE STANDARD ECM ( ‘ o * ‘ forte , ar A 7 . Trish Sweeney: ey Tuesday, 24-March 2009 O45 PM 2. 8 “ ’ ‘info@suricert. com.au' : Preliminaty Building Works assessable : ‘against the planing scheme at 23 Arakoon Cres - Our ref: 09/0392 7 Regards, ‘ . - oO Ak Trish Sw zeney ; : a ‘ “ Aciministration Officer-LandUse = * 2 owe: i? [email protected] - su S oO 7 T/ } 5¢ 49 5293 " ‘ ane Ward a.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0392 - Preliminary Building Works Assessable Against the Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.