Council archive · source document
09/0392 - Preliminary Building Works Assessable Against the Planning Scheme [As Published] · 172009.392
INTEGRATED PLANNING ACT 1997 Par E, Version 3.1, 3 March 2008 Form 1 Development Application Part E Building &/or operational works assessable against a planning scheme 1. Nature of work that requires assessment against a planning scheme: Building work - Complete Table A [J Operational work - Complete Table B Table A (i) What is the nature of the building work made assessable in the planning scheme? The proposed dwelling addition does not comply with s 6.1 of the Detached House Code, as the proposat consititutes a 3rd story . (ii) Are there any current approvals associated with this application? (e.g. material change of use) No [_] Yes - Provide details below 2. What is the dollar vatue of this operational work? (ie. the total value including GST, materials and labour) |$ 0.00 uk teat accompanies this application = ° ' fet Plans, andspecifications if applicable, showing the nature and location of the proposed works (including the . extent of any cut and fill) Confirmed mail OFFICE USE ONLY Date Received Reference Numbers Advice for completing Part E General advice Part Amust also be completed for all IDAS development applications, * The applicant is responsible for answering all questions fully and correctly, untess following a response there is a statement to go directly to another question. qi A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0392 - Preliminary Building Works Assessable Against the Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.