22 A R A K O O N C R E S C E NT S U N S H I N E BE A C H - NO T E S
GENERAL NOTES LEGEND DRAWING LIST
COPYRIGHT: Drawings remain the Copyright of the CONCEALMENT OF SERVICES: All services shall be concealed in AC AC unit 001 NOTES
Architect: Robinson Architects walls or ducts. Where services are exposed they must be confirmed by B Basin 002 MATERIALS
the Architect on site prior to installation unless noted otherwise.
CONC Concrete
ALL WORKS shall be carried out in accordance with the Building Code
CT Cooktop 003 PERSPECTIVES
of Australia, Australian Standards, Local Council requirements, QDC LICENSED TRADESPERSONS: All services to be installed by licensed
guidelines and all other relevant by laws and authorities. In particular tradespersons in accordance with local authority and with current DP Downpipe 004 PERSPECTIVES
refer Australian standards: manufacturers specifications. DR Dryer 005 PERSPECTIVES
· site preparation A.S. 3798 F Fridge 007 PERSPECTIVES
· concrete construction A.S. 2870 ROOF DRAINAGE: All downpipes to be located as noted on the
FG Fixed Glass
· timber construction and details A.S. 1684.2 drawings and sizes as scheduled. Allow to connect to in-ground storm
FP Fireplace 008 BUILDING HEIGHT COMPLIANCE
· steelwork AS 4100, AS 1111 and A.S. 1112 water drains with 90mmØ UPVC at 1:100 minimum grade. Allow for
. termite protection BCA and A.S. 3660.1 I.O.'s at each change of direction and at 6000mm centres. FT# Floor Tile, Refer Schedule 009 BUILDING SITE COVER
. artificial lighting & ventilation BCA parts 3.8.4/3.8.5 and A.S. 1680 GU# Gutter Type, Refer Schedule 010 REFERENCE PHOTOS
. fire safety BCA part 3.7 SITE DISCHARGE: All stormwater and sanitary plumbing to be HR# Handrail Balustrade, Refer Schedule 011 REFERENCE PHOTOS
. smoke alarms BCA part 3.7.2 and A.S. 3786 connected to existing council system in accordance with the
HWD Hardwood 012 SOUTHERN ELEVATION OVERLAY
. glazing BCA part 3.6 and A.S. 1288 and A.S. 2047 requirements of the relevant local authority.
HWS Hot Water System
APPROVAL: No building work shall be undertaken prior to Building WATER LINES: All hot water lines shall be fully insulated. All domestic PWD Powder Room 100 SITE PLAN
Approval by a registered Certifier. hot water to basins, showers and baths to have maximum temperature SC Structural Column 105 LOWER GROUND PLAN
of 50°C. Allow to supply and install tempering valves where required, S Sink 106 GROUND FLOOR PLAN
CONSULTANTS: Drawings shall be read in conjunction with engineers as nominated in the BCA and relevant standards.
SH Shower 107 FIRST FLOOR PLAN
drawings and computations. All structure to Engineers design.
TD Tumble Dryer
Hydraulic sizing and design to hydraulic engineers requirements. All STAIR AND BALUSTRADES: All stair and balustrades shall comply
drawings to be co-ordinated with consultant documentation prior to with part 3.9 of the BCA. Steps to be provided where fall from dwelling WC Water Closet 205 NORTH ELEVATION
construction. exceeds 190mm. WF Wine Fridge 206 EAST ELEVATION
WM Washing Machine 207 SOUTH ELEVATION
DIMENSIONS: Do not scale off drawings - use figured dimensions only. ALL PRODUCTS: To be installed to manufacturers requirements and
208 WEST ELEVATION
Contractor shall verify all dimensions on site prior to construction. Any to be in accordance with manufacturers requirements for suitable
discrepancies or errors shall be referred to architect and client prior to exposure levels.
installation / manufacture of any works. Confirm levels & RL's on site 305 SECTION S01
prior to commencement of work. PROPRIETARY ITEMS: Identification of a proprietary item does not 306 SECTION S02
necessarily imply exclusive preference for the item so identified, but
307 SECTION S03
SETOUT: Contractor to confirm exact siting and orientation prior to indicates the necessary properties of the item. If alternatives are
construction setout. All building setout and confirmation of setbacks proposed, submit proposed alternatives and include samples, available
and height to be carried out by a Licensed Surveyor. No footing, or wall technical information, reasons for proposed substitutions and cost. 1200 3D VIEW
to encroach the title boundary. 1201 3D VIEW
JOINERY ITEMS SHALL INCLUDE: Manufactured casework items,
TERMITE PROTECTION: Termite protection by means of termimesh including: kitchen cabinets and cupboards; bathroom cabinets; robes.
s.s. mesh hysical barrier in accordance with A.S. 3660.1/2000 and
installed in strict accordance with current manufacturers specifications. SANITARY COMPARTMENTS: Provide removable hinges to doors of
sanitary compartments to comply with BCA 3.8.3.3 and be readily
STRUCTURAL STEEL: Unless noted otherwise all exposed removable from outside unless there is a clear space of at least
structural steel, anchor bolts and other attachments shall be hot dip 1200mm b/w closet pan within the sanitary compartment and the
galvanised. A cold gal painted finish shall be applied to any field nearest part of the doorway.
welding to existing or new steelwork. All steel work cast in concrete
footings or slab shall have a bitumen finish applied to full extent of cast APPLIANCES & EQUIPMENT: Builder to co-ordinate all appliance and
in concrete steel. Check all dimensions on site prior to fabrication of equipment locations on site and with joiner. installation and final
steelwork. connection by the contractor.
RETAINING WALLS: All retaining walls to structural engineers details. WEATHERSTRIPS: All external doors to contain weather stripping
Provide rubble backfill and ag drainage to all retaining walls. Builder to (type to be confirmed by Architect prior to manufacture)
provide tanking where required.
DOCUMENTATION: The contractor shall carry out works in
SLAB & FOOTINGS: All slabs and footings to structural engineers accordance with the signed drawings and schedules and anything
details. A polyethylene moisture barrier shall be lapped 200mm and reasonable inferred, and with the Conditions of Contract, and in
fully taped under any habitable concrete slab and shall extend 100mm accordance with the directions and to the satisfaction of the Architect,
onto the perimeter footing. whose interpretation of the contract documents shall be final. The
drawings and specifications/schedules shall be considered
ARTICULATION JOINTS: Provide articulation joints to comply with complementary, and any work and/or materials absent from one
"Cement and Concrete Association Construction Note TN9". but present or implied in the other shall be furnished
EROSION CONTROLS: All building works to comply with local as if they were present in both.
authorities Erosion and sediment control standards.
WATERPROOFING: All wet areas and walls to be waterproofed in FINAL CERTIFICATE: At completion of work, Builder to obtain and
accordance with the BCA 3.8 & AS 3740. Builder to provide certificate supply a Certificate of Classification from a Building Certifier.
of installation and compliance.
POOL: Contractor to confirm heights/depths/steps and
plumbing/electrical requirements and locations prior to construction
DA ISSUE
Use figured dimensions in preference to scale.
All dimensions to be verified and checked on
ISSUE REV
ROBINSON CLIENT PROJECT DRAWING TITLE REVISION DRAWING NUMBER
site. These designs, drawings, specifications
SKETCH DESIGN SD-1 06/10/2022 03/11/2022 ARCHITECTS KEITH & JEANNETTE LOT 793RP48111 NOTES DA-6 001
and the copyright thereof are the property of DA ISSUE DA-3 21/02/2023 67 MEMORIAL DRIVE INCE 22 Arakoon Cres
Robinson Architects Pty Ltd and must not be
DA ISSUE DA-5 28/02/2023 EUMUNDI Q 4562 Sunshine Beach Q 4567 DATE SCALE
used, retained or copied without the written
authority of Robinson Architects Pty Ltd. DA ISSUE DA-6 06/04/2023 Ph. (07) 5442 8566 DA ISSUE © ROBINSON ARCHITECTS 2023 06/04/2023 (A3 Paper)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.