Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Code Assessment

Attached to the e-mail MCU16/0066 & OPW16/0133 Plan of Development, Noise report & survey (4 of 4).

of 28

Page text shows just the words. Original shows the document exactly as it was published.

                  Column 1                                                   Column 2                                               Proposal                         Complies
              Specific Outcomes                               Probable solutions (if code assessable)
                                                     b)    a landscaped area , a minimum of 2m, is provided
                                                           along the property boundary to any road;
                                                     AND
                                                     S79.2 Where the site adjoins a Residential Use or land
                                                     included in a residential zone—
                                                     a)    a 2m high solid screen fence is provided along the
                                                           common boundaries; and
                                                     b)    hours of operation are limited to between 7.00 am
                                                           and 10.00 pm.
Site layout & design
O80 Buildings, structures, driveways, tanks          S80.1 Fuel pumps are not less than 8m from any              The fuel pumps are located more than 8m from           Yes
and fuel bowsers are sited to—                       frontage—                                                   any road frontage. Inlets to fuel storage tanks
a)      ensure the safe and efficient use of the     AND                                                         are located to allow a refuelling tanker to stand
        site;                                        S80.2 Inlets to bulk fuel storage tanks are located so      wholly within the site and on level ground
b)      maintain visual amenity and streetscape      tankers stand wholly within the site and on level ground    whilst discharging fuel into tanks.
        character;                                   while discharging fuel into tanks.
c)      provide adequate separation to
        adjoining land uses; and
d)      not cause an environmental nuisance to
        neighbouring properties.
O81 Customer air and water facilities, and           S81.1 Customer air and water facilities, and any car        There are no residential properties within close       Yes
any automatic mechanical car washing                 washing facilities are setback 5m from any residential      proximity to the site.
facilities are located such that—                    property boundary.
a)       vehicles using or waiting to use such
         facilities are standing wholly within the
         site; and
b)       an adequate buffer area can be
         provided to any adjoining Residential
         Use.
O82 The layout and design of the service             S82.1 Sealed impervious surfaces are provided where         The refuelling forecourt area will be sealed and       Yes
station ensures that on site operations do not       potential spills of contaminants may occur;                 impervious.
cause any environmental nuisance or harm or          AND
result in the release of untreated pollutants.       S82.2 Grease and oil arrestors or other infrastructure is   The Stormwater Management Plan confirms
                                                     provided to prevent the movement of contaminants from       that runoff within the area beneath the service
                                                     the site.                                                   station bowser canopy will be captured by a
                                                                                                                 grated channel surrounding the area and
                                                                                                                 directed to a holding tank. This will reduce the
                                                                                                                 risk of any potential runoff containing
                                                                                                                 hydrocarbons entering the stormwater network
                                                                                                                 in the event of a spill.

                                                                                                                 The holding tank will be monitored and
BUSINESS USES CODE                                                                                                                                                   PAGE 8 OF 9
Log in to download the original file

Code Assessment.pdf · 272 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.