Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

SARA Information request - 2107-23530 SRA

Attached to the e-mail SARA information request - MCU21/0110.

of 4

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                              2107-23530 SRA




            Action:
            It is requested that the applicant provide further information on Performance Outcomes
            (PO)15-22 of State code 6: Protection of State transport networks (State code 6) of the
            SDAP.

            Provide revised proposal plans and a revised Traffic Engineering Assessment detailing the
            following:

            (i) Private buses/coaches/mini-buses and shuttles:
                  A dedicated bus setdown facility with adequate capacity (number of parking bays)
                      to cater for the demand generated by the development for private/chartered
                      coaches, buses, mini-buses, shuttles and the resort's own private shuttle services,
                      including potential events held by the resort complex
                  Bus lay-by parking commensurate with demand, namely, bus layover for resort
                      owned buses any events held at the resort complex
                  A bus setdown facility and bus lay-by parking designed for the maximum design
                      vehicle (single unit rigid bus of 14.5m in length), with the bus setdown facility
                      parallel to the kerb and at the entry to the development. Guidance on suitable
                      dimensions can be obtained from Chapter 5 – Bus Stop Infrastructure of the Public
                      Transport Infrastructure Manual 2015. Bus parking should comply with the
                      Disability Standards for Accessible Public Transport 2002 made under subsection
                      31(1) of the Disability Discrimination Act 1992
                  A Registered Professional Engineer of Queensland (RPEQ) certified swept path
                      analysis demonstrating:
                           o    that the maximum design vehicle can manoeuvre into and out of the bus
                               setdown facility
                           o that buses parked in the bus setdown facility have independent movements
                           o that buses can circulate past buses parked in the bus setdown facility
                           o that buses can manoeuvre into and out of the bus lay-by parking without
                               causing conflict
                  A bus circulation allows an efficient and direct route between the entry and exit of
                      the development and should avoid carparking areas and aisles and circuitous
                      routes. All bus parking zones are separate from passenger loading zones for taxis,
                      rideshare, private vehicles and service vehicle loading zones to avoid vehicle
                      conflict and maximise safety and efficiency and bus parking capacity
                  A waiting area of adequate dimensions for the anticipated dwell time of passengers
                      at the bus setdown facility. Include shelter and seats as well as hardstand and
                      access for waiting, boarding and alighting passengers.

            (ii) Taxis and rideshare:
                   A porte cochere that has a dedicated passenger loading zone with adequate
                      capacity (number of car parking bays) to accommodate the demand generated by
                      the development for taxis and rideshare and private vehicles
                   A porte cochere that can accommodate the parking of a taxi suitable for use by
                      people with a disability in accordance with the disability standards set out in PO22
                      of State Code 6 and Chapter 7 of the Public Transport Infrastructure Manual 2015
                      (http://translink.com.au/about-translink/reports-and-publications)
                   A RPEQ certified swept path analysis demonstrating that the maximum design
                      vehicle can circulate past parked vehicles (maximum design vehicle) in the porte
                      cochere. This will be necessary for independent vehicle movement in the porte
                      cochere


State Assessment and Referral Agency                                                              Page 2 of 4
Log in to download the original file

SARA Information request - 2107-23530 SRA.pdf · 274 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.