GENERAL COMMITTEE MEETING                                                         18 MARCH 2019



GENERAL COMMITTEE MEETING - LIVE RECORD MEETING NOTES
18 MARCH 2019 - Crs Frank Wilkie (Chair), Jess Glasgow, Ingrid Jackson, Joe Jurisevic,
Frank Pardon, Brian Stockwell and Tony Wellington



1    132008.1128.02 REQUEST TO CHANGE AN EXISTING APPROVAL FOR MULTIPLE
     HOUSING TYPE 3 RETIREMENT & SPECIAL NEEDS; COMMERCIAL BUSINESS, TYPE
     2 MEDICAL & WELLBEING, TYPE 1 HEALTH; & RECONFIGURING A LOT (1 INTO 2
     LOTS) AT GRASSTREE CT & BEN LEXCEN DR SUNRISE BCH
     Motion
     Moved:           Cr Stockwell
     Seconded:        Cr Glasgow
     That Council note the report by the Coordinator Planning to the Planning & Environment
     Committee Meeting dated 12 March 2019 regarding Application No. 132008.1128.02 to
     make a minor change to an existing approval for Multiple Housing – Type 3 Retirement &
     Special Needs; Commercial Business – Type 2 Medical and Wellbeing – Type 1 Health; and
     Development Permit for Reconfiguring a Lot (1 into 2 lots) situated at Grasstree Court
     Sunrise Beach and:
     A.   Amend the description of the approved use to Development Permit for Material
          Change of Use for Multiple Housing – Type 3 Retirement & Special Needs and
          Commercial Business – Type 2 Medical and Reconfiguring a Lot (1 into 2).
     B.   Approve the change and amend conditions 1, 5, 7, 12, 14, 18, 26, 27, 30.1, 33, 35,
          39, 40.1, 41, 57, 64, 65 and 72 to read as follows:
          1.     The development must be undertaken in accordance with this approval and must
                 generally comply with the approved plans of development. The approved plans
                 are listed in the following table unless otherwise amended by these conditions.
      Plan No.      Rev.   Plan Name                                              Date
      7448-06              Lots 1 & 9 Cancelling Lot 1 on SP177650 Prepared by    15 May 2008
                           Conics (Sunshine Coast) Pty Ltd
      DA_106               Masterplan prepared by Smith and Tracey Architects     November 2018
      DA_107               Staging Plan prepared by Smith + Tracey Architects     November 2018
      DA_108               Precincts Plan prepared by Smith + Tracey Architects   November 2018
      DA_109               Pedestrian Circulation prepared by Smith + Tracey      November 2018
                           Architects
      DA_110               Vehicular Circulation prepared by Smith + Tracey       November 2018
                           Architects
      DA_111               Building Setbacks prepared by Smith + Tracey           November 2018
                           Architects
      DA_112               Landscaping Calculation prepared by Smith + Tracey     November 2018
                           Architects
      DA_113               Site Cover Calculations prepared by Smith + Tracey     November 2018
                           Architects
      DA_115               Typical Site Section A prepared by Smith + Tracey      November 2018
                           Architects
      DA_116               External Finishes Schedule prepared by Smith +         November 2018
                           Tracey Architects


                                                                                     Page 1 of 12
Log in to download the original file

2019-03-18 General Committee Meeting Notes(PDF, 559KB).pdf · 573 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 11 sections

Section 2

RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING                                                   18 MARCH 2019

    DA_117         Area Schedules prepared by Smith + Tracey                November 2018
                   Architects
    DA_118         Residential Aged Care – Ground Floor Plan prepared       November 2018
                   by Smith + Tracey Architects
    DA_119         Residential Aged Care – First Floor Plan prepared by     November 2018
                   Smith + Tracey Architects
    DA_120         Residential Aged Care – Roof Plan prepared by Smith      November 2018
                   + Tracey Architects
    DA_121         Residential Aged Care – N and W Elevations prepared      November 2018
                   by Smith + Tracy Architects
    DA_122         Residential Aged Care – S and E Elevations prepared      November 2018
                   by Smith + Tracy Architects
    DA_123         Residential Aged Care – Typical Sections prepared by     November 2018
                   Smith + Tracey Architects
    DA_124         Residential Aged Care – Village Site Plan prepared by    November 2018
                   Smith + Tracy Architects
    DA_125         Central Facilities & ILAs – Basement Car Park            November 2018
                   prepared by Smith + Tracey Architects
    DA_126         Central Facilities & ILAs – Ground Floor Plan prepared   November 2018
                   by Smith + Tracey Architects
    DA_127         Central Facilities & ILAs – Level 1 First Floor Plan     November 2018
                   prepared by Smith + Tracey Architects
    DA_128         Independent Living Apartment Type a1-2b (& handed)       November 2018
                   prepared by Smith + Tracey Architects
    DA_131         Central Facilities & ILAs – E Elevation and Typical      November 2018
                   Section prepared by Smith + Tracey Architects
    DA_132         Central Facilities & ILAs – N Elevation & Typical        November 2018
                   Section prepared by Smith + Tracey Architects
    DA_133         Apartment Buildings – Basement Plan prepared by          November 2018
                   Smith + Tracey Architects
    DA_134         Apartment Buildings – Ground Floor Plan prepared by      November 2018
                   Smith + Tracey Architects
    DA_135         Apartment Buildings – First Floor Plan prepared by       November 2018
                   Smith + Tracey Architects
    DA_136         Apartment Type a2-2b & type a3-3b prepared by            November 2018
                   Smith + Tracey Architects
    DA_137         Apartment Buildings – E & W Elevations prepared by       November 2018
                   Smith + Tracey Architects
    DA_138         Apartment Buildings – Typical N Elevation & Section      November 2018
                   prepared by Smith + Tracey Architects
    DA_139         Apartment Building 4 / Roof Plan prepared by Smith +     November 2018
                   Tracey Architects
    DA_1340140     Apartment Building 4 / Sections prepared by Smith +      November 2018
                   Tracey Architects



                                                                               Page 2 of 12

Section 3

RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING                                                     18 MARCH 2019

    DA_141             Apartment Building 3 / Roof Plan prepared by Smith +   November 2018
                       Tracey Architects
    DA_142             Apartment Building 3 / Sections prepared by Smith +    November 2018
                       Tracey Architects
    DA_143             Apartment Building 2 / Roof Plan prepared by Smith +   November 2018
                       Tracey Architects
    DA_144             Apartment Building 2 / Sections prepared by Smith +    November 2018
                       Tracey Architects
    DA_145             Apartment Building 1 / Roof Plan prepared by Smith +   November 2018
                       Tracey Architects
    DA_146             Apartment Building 1 / Sections prepared by Smith +    November 2018
                       Tracey Architects
    DA_147             Apartment Buildings – Photo Montage from National      November 2018
                       Park prepared by Smith + Tracey Architects
    DA_148             ILU Type C (2B-1G) prepared by Smith + Tracey          November 2018
                       Architects
    DA_149             ILU Type C (3B-2G) prepared by Smith + Tracey          November 2018
                       Architects
    DA_150             ILU Type D (3B-2G) prepared by Smith + Tracey          November 2018
                       Architects
    DA_151             ILU Type H1 (2B-1G) + K1 (3B-2G) prepared by Smith     November 2018
                       + Tracey Architects
    DA_152             ILU Type H2 (2B-1G) + H2 (3B-2G) prepared by Smith     November 2018
                       + Tracey Architects
    DA_153             Independent Living Units – Roof Plans prepared by      November 2018
                       Smith + Tracey Architects
    DA_154             Independent Living Units – Elevation Sheet 1           November 2018
                       prepared by Smith + Tracey Architects
    DA_155             Independent Living Units – Elevation Sheet 2           November 2018
                       prepared by Smith + Tracey Architects
    DA_156             Independent Living Units – Typical Sections prepared   November 2018
                       by Smith + Tracey Architects
    DA_114             Masterplan / Carparking Layout prepared by Smith +     November 2018
                       Tracey Architects

        5.   The approved development comprises the following:
                 Multiple Housing – Type 3 Retirement & Special Needs (122 independent
                  living units and apartments and 96 aged care beds)
                 Commercial Business – Type 2 Medical (as indicated on approved plans)
        7.   The development may be staged in accordance with the plan titled ‘Masterplan’
             prepared by Smith and Tracey dated November 2018, Plan Ref: DA_106




                                                                                 Page 3 of 12

Section 4

RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING                                                       18 MARCH 2019

        12.   In conjunction with an application for operational works on the site for the first
              stage, the applicant must submit an operational works application for Vegetation
              Management for the development site. The Vegetation Management operational
              works application must detail:
              12.1 Identification of all active Glossy Black Cockatoo food trees within the
                   development footprint or in areas likely to be impacted upon by the
                   operation or construction of the development.
              12.2 A Vegetation Clearing Offset program to be undertaken to re-establish the
                   habitat to be cleared from the site to a nearby location with similar soil
                   properties. A receiving site is to be identified and maintained for a specified
                   period (minimum 5 years) after the establishment of the receiving site.
              12.3 The Vegetation Clearing Offset program must include the details of the
                   transfer methods to be engaged including:
                    12.3.1   The transfer of soil/seed bank media off the site to the designated
                             receiving site(s);
                    12.3.2   Methods of transfer including, inter alia, mastication of native
                             vegetative matter, tile transfer of live soil/plant matrix, peat
                             locations and extents, sexual and vegetative methods of
                             revegetation of offset receiving site and other deemed pertinent
                             matters by a person with industry experience in the successful
                             establishment and/or re-establishment of heathland vegetation;
                    12.3.3   Transfer of rare and threatened plant species (sexual and/or
                             vegetative);
                    12.3.4   Details of pre-treatment works prior to transfer of soil/seed bank
                             media off the site and methods of transplanting;
                    12.3.5   Details of seed collections times and estimated establishment
                             procedures and times;
                    12.3.6   Details of the receiving site, including tenure, contractual details,
                             establishment, monitoring and maintenance details and suitability
                             of the site for the purpose;
                    12.3.7   All information must be prepared by a person with industry
                             experience in the successful establishment and/or re-
                             establishment of heathland vegetation. Industry and educational
                             institution involvement is recommended.
              The establishment of the vegetation offsets must be completed prior to the
              commencement of the use of the first stage.
        14.   The Vegetation Management operational works application must detail the
              location and extent of vegetation disturbance on Lot 9 SP252905 and Lot 6
              RP901384 must be accurately marked on-site, including any setback
              requirements for bushfire mitigation purposes, for Council officers to inspect prior
              to commencement of any vegetation clearing.




                                                                                    Page 4 of 12

Section 5

RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING                                                     18 MARCH 2019

        18.   Any lighting to the development is not to impact on the ecological values of the
              adjacent National Park and the southern portion of Lot 9 SP 252905, i.e. lighting
              must not be directed toward, and light spill must be minimised to, the adjacent
              National Park or remnant vegetation to the south. Details of the design response
              to this requirement must be submitted with the application for operational works.
        26.   A Landscape Plan shall be prepared by a suitably qualified Landscape Architect
              or Horticulturalist and shall be in accordance with Council’s Landscaping Code
              of The Noosa Plan and Planning Scheme Policy PSP3 Landscaping Plants and
              Guidelines. The Landscaping Plan shall be submitted and approved as part of
              an application for Operational Works. The Landscaping Plan shall address
              landscaping treatments for the development including internal streetscapes,
              buffer areas and open space areas, adjoining road network and properties,
              including:-
              26.1   Incorporation of koala sensitive design and koala food trees.
              26.2   Incorporation of Glossy Black Cockatoo food trees.
              26.3   Screening vegetation to buildings, including western elevations and any
                     subfloor areas.
              26.4   Landscaping treatments to internal road network and between buildings.
              26.5   Landscaping treatments to open space areas, including any rehabilitation
                     and planting enhancement requirements drainage basins;
              26.6   Landscape buffers and fencing to adjoining properties.
              26.7   The location of pedestrian pathways and seating within the site and on
                     the road reserve adjoining the site.
              26.8   All plant species are to be local native species suitable for the site
                     (excluding turf species).
              26.9   Such landscaping is to be completed in accordance with the approved
                     landscaping plan prior to acceptance of the development on
                     maintenance.
              26.10 Existing trees on the site and within road reserves are to be retained,
                    except where required to be removed due to building operations or the
                    conduct of the approved use.
              26.11 Landscaping to the internal portions of the development site in
                    accordance with Division 17 Landscaping Code of the Noosa Plan and
                    Planning Scheme Policy 3 Landscaping Plants and Guidelines, ensure
                    koala sensitive design including koala food trees, and Glossy Black Food
                    trees. Due to the location of the proposed site adjacent to National Park,
                    all plant species are to be local native coastal species, excluding turf
                    species.
              26.12 Landscaping outcomes are to ensure comprehensive local native planting
                    occurs on the development site and the BMP is to be amended to
                    acknowledge this outcome.
              26.13 The provision of Glossy Black food trees on each side of the Grasstree
                    Court road reserve planted at regular 15 metre intervals. The trees must
                    be propagated by seed from existing Glossy Black food trees within the
                    development site.

                                                                                 Page 5 of 12

Section 6

RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING                                                       18 MARCH 2019

        27.   Prior to the commencement of use of Stage 1 of the development, the applicant
              must construct an eastern extension of Grasstree Court, incorporating kerb and
              channel on both sides, to provide a direct connection to Ben Lexcen Drive. The
              intersection must be a full intersection generally in accordance with the plan titled
              Conceptual Intersection Details Ben Lexcen Drive and Grasstree Court Option 2
              (Project No, 18-001942 Drawing Number 3000-SK-005) prepared by Calibre and
              dated 15.01.19. The centre of the intersection of the Grasstree Court extension
              with Ben Lexcen Drive must be located in line with the common property
              boundary between 38 Ben Lexcen Drive and 40 Ben Lexcen Drive. The Ben
              Lexcen Drive service road carriageway must be realigned as necessary to
              intersect at a right angle with the Grasstree Court extension. The roadworks and
              intersection must be of sufficient size to cater for large vehicles, including
              Council’s articulated library vehicle, to access Grasstree Court, the frontage of
              the local shops and the Lipton Street roundabout.
              All associated and ancillary work including pavement correction to the existing
              pavement, drainage works, modification of the footpath, and adjustments to the
              existing infrastructure shall be undertaken to complete the roadworks.
              In this regard a schedule of works, specifications and plans detailing this work
              shall be prepared and submitted to Council for approval prior to obtaining a
              Development Permit for Operational Works.
              30.1 Remove the existing roadway and footpath connection between Ben
                   Lexcen Drive and the adjacent service road through the north-east corner
                   of Lot 9 SP 252905 and across the Ben Lexcen Drive verge. Kerb must be
                   re-instated on the western side of Ben Lexcen Drive where the roadway
                   connection currently joins and a concrete footpath, at least 2 metres wide,
                   must be constructed along the western verge of Ben Lexcen Drive from this
                   point up to the intersection with the Grasstree Court extension,
        33.   Pedestrian crossings shall be provided in Grasstree Court generally as shown on
              ‘Masterplan’ prepared by Smith and Tracey dated November 2018, Plan Ref:
              DA_106. The crossing shall include linemarking and suitable signage in
              accordance with the MUTCD.
        35.   Vehicular access driveways to service the development shall be constructed from
              the Grasstree Court frontages of the site. The driveways shall be generally in
              accordance with Council’s standard drawing SEQ R-051 and Masterplan’
              prepared by Smith and Tracey dated November 2018, Plan Ref: DA_106.
        39.   The vehicle access driveway to proposed carparking level in the apartment
              buildings must be constructed prior to the commencement of the use of the
              apartment buildings.
              40.1 Generally in accordance with drawing number ‘Masterplan’ prepared by
                   Smith and Tracy dated November 2018, Plan Ref: DA_106,
        41.   Carparking shall be provided within the sites generally as shown on drawings
              numbered DA_114 “Masterplan/Carpark Layout” prepared by Smith and Tracey
              Architects dated November 2018 and DA_133 “Apartment Buildings – Basement”
              prepared by Smith and Tracey Architects dated November 2018 and within the
              “Independent Living Units” as shown the approved floor plans, except as
              modified herein.



                                                                                    Page 6 of 12

Section 7

RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING                                                     18 MARCH 2019

              57.   A preliminary Construction Management Plan must be submitted with the
                    Operational Works application and must address the following:
                    a.   traffic management during all aspects of the construction phase
                         including:
                         i.       a Traffic Management Control Plan in accordance with the
                                  Manual of Uniform Traffic Control Devices (MUTCD) detailing
                                  all temporary signage and traffic control measures prior to
                                  construction
                         ii.      maintenance of safe pedestrian access, including safe
                                  passage for children attending nearby schools, for the areas
                                  affected by the works during and after daily construction has
                                  ceased
                         iii.     proposed fencing to the site during the construction phase of
                                  the development
                         iv.      approval of the Traffic Management Control Plan by the
                                  Department of Transport and Main Roads (DTMR) for any
                                  works on State controlled roads
                         v.       provision for worker car parking
                    b.   maintenance and protection of water quality and existing drainage
                         lines through the construction site, through the implementation of
                         appropriate erosion and sediment control measures
                    c.   works programme identifying key components of the works and their
                         respective durations
                    d.   establishment of a communication protocol with the general public,
                         adjoining owners, emergency services and local businesses to
                         advise of agreed construction times, impacts on traffic, services and
                         other relevant issues
                    e.   identification of complaint management procedures including:
                         i.       contact details for the on-site manager
                         ii.      dispute resolution procedures
                    f.   It is acknowledged that the preliminary Construction Management
                         Plan will be a draft document requiring finalisation upon appointment
                         of the Principal Contractor employed to construct the works and a
                         final document will be required to be submitted at the Pre-Start
                         Meeting for the project.
        64.   The works must be undertaken in accordance with an Operational Works
              approval and the latest version of the Water Sensitive Urban Design Technical
              Design Guidelines for South East Queensland, and must include in particular:
              64.1 Stormwater quality treatment devices of a size and location generally in
                   accordance with those documented in the revised site SWMP required by
                   the above condition; and
              64.2 Bioretention devices which:
                    64.2.1      Are designed generally in accordance with IPWEQA Standard
                                Drawing No. WSUD-001.

                                                                                  Page 7 of 12

Section 8

RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING                                                      18 MARCH 2019

                    64.2.2   Incorporate a coarse sediment forebay (in addition to the required
                             filter media surface area), which is sized in accordance with the
                             latest version of the Water Sensitive Urban Design Technical
                             Design Guidelines for South East Queensland and designed
                             generally in accordance with IPWEQA Standard Drawing No.
                             WSUD-005.
                    64.2.3   Have safe, unobstructed and all weather access from the road
                             frontage for maintenance purposes, particularly for the coarse
                             sediment forebay.
                    64.2.4   Are provided with a high flow bypass to ensure that flows which
                             exceed the treatment capacity of the device are bypassed in order
                             to avoid damaging of the filter media or subjecting the filter media
                             to excessive sediment loads.
                    64.2.5   Are provided with a free-draining outlet from the sub-soil
                             drainage system.
         65.   All stormwater quality treatment devices must be maintained in accordance with
               a Maintenance Manual prepared for the development by a qualified person and
               submitted to Council prior to the issue of any Development Permit for Operational
               Works. The Maintenance Manual must include:
               65.1 A plan showing the location of the individual components of the system
               65.2 For proprietary products the manufacturer’s data and product information
                    sheets
                    65.2.1   For bioretention basins reference to the Water By Design
                             Maintaining Vegetated Stormwater Assets and Rectifying
                             vegetated stormwater assets
               65.3. Location of inspection and monitoring points shown clearly on the plan
               65.4. A schedule or timetable for the proposed regular inspection, maintenance
                     and monitoring of the devices.
               65.5 For proprietary products a maintenance contract of a minimum 10 years to
                    demonstrate that the proprietary product shall be maintained as per the
                    manufacturers specifications.
               65.6 Details of the location and method for maintenance of any proprietary
                    products to demonstrate that collected pollutants and nutrients shall be
                    disposed of in accordance with relevant legislation.
               Records of all maintenance activities undertaken must be kept and made
               available to Council upon request.
         72.   The fire-fighting demand on Unitywater’s water supply system from the
               development must comply with Unitywater requirements and industry standards.
    C.   Delete conditions 44, 45 and 80.
    D.   Include the following new condition
         1.    Any proprietary stormwater quality improvement device included to achieve the
               required stormwater quality Management Objectives specified in Section 4 of the
               Girraween Stormwater Management Plan, must demonstrate only be granted an
               Operational Works Approval on the following provisions:


                                                                                   Page 8 of 12

Section 9

RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING                                                     18 MARCH 2019

            a.    A suitably qualified and experienced professional must provide
                  independent verification that the parameters within the node for the device
                  in MUSIC modelling have been tested and verified as per Stormwater
                  Australia (2018) Stormwater Quality Improvement Device Evaluation
                  Protocol. Version 1.2 December 2018 to achieve the predicted outcomes
                  in the MUSIC model for the development. For the purpose of this condition,
                  the suitably qualified and experienced professional must be able to
                  demonstrate a minimum 10 years urban stormwater testing and modelling
                  experience and be verified in writing by Stormwater Australia as having an
                  appropriate reputation and track record within the stormwater industry to
                  provide such independent advice.
            b.    Where testing to achieve the certification of the proprietary stormwater
                  quality improvement device is from an area with rainfall intensities and
                  patterns that are statistically inconsistent with the region of the Noosa Shire
                  that the device is to be installed, and / or the size of the development the
                  device has been tested on is more than 2500m2 smaller than the
                  development the device is proposed to service, the following additional
                  conditions apply:
                  i.    The proprietary stormwater device treatment train must be tested and
                        re-verified in accordance with the Stormwater Australia (2018)
                        Stormwater Quality Improvement Device Evaluation Protocol.
                        Version 1.2 December 2018. A suitably qualified and experienced
                        professional, as verified by Stormwater Australia must use the results
                        from the onsite testing to re-run the MUSIC node for the proprietary
                        devices and confirm whether or not the required pollutant reduction
                        efficiencies of 80% reduction in Total Suspended Solids, 60%
                        reduction in Total Phosphorous and 45% reduction in Total Nitrogen
                        for the overall development are delivered.
                 ii.    Where the field results and re-run MUSIC node demonstrate the
                        required pollution reduction efficiencies for the development are not
                        met, the applicant must implement additional measures to achieve
                        the required pollution reduction targets. The additional measures
                        must include, in order of priority, elevated maintenance, and then
                        increased treatment capacity of the stormwater quality improvement
                        devices. Following application of additional measures, the system
                        must be retested in accordance with Stormwater Australia (2018)
                        Stormwater Quality Improvement Device Evaluation Protocol.
                        Version 1.2 December 2018. Where pollution reduction targets
                        continue to not be demonstrated the proprietary device must be
                        removed and replaced with a bio-retention device constructed in
                        accordance with an Operational Works approval or the applicant
                        must enter into an agreement with Council to provide improved water
                        quality outcomes within the catchment area.
                 iii.   A separate water quality performance bond must be provided prior to
                        any pre-start meeting for the development. The water quality
                        performance bond must be 150% of the cost of water quality
                        monitoring required to comply with Stormwater Australia (2018)
                        Stormwater Quality Improvement Device Evaluation Protocol.
                        Version 1.2 December 2018. The performance bond will be
                        incrementally returned annually for the value of monitoring works

                                                                                  Page 9 of 12

Section 10

RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING                                                          18 MARCH 2019

                            completed that year. The full value of the bond shall be returned upon
                            demonstration that the development delivers the required pollution
                            reduction targets.
    E.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.

    Procedural Motion
    Moved:           Cr Wellington
    Seconded:        Cr Jackson
    That debate on Item 1 is deferred to the Ordinary Meeting dated 21 March 2019 to allow staff
    to discuss proposed changes with the applicant.
                                                                                      Carried.



2   MCU18/0102 REQUEST FOR NEGOTIATED DECISION NOTICE FOR VISITOR
    ACCOMMODATION TYPE 4 CONVENTIONAL (122 BEDS) AT 14-16 MARY ST
    NOOSAVILLE
    Refer further report at Item 7.




3   KOALA CONSERVATION ACTION PLAN UPDATE
    Committee Recommendation
    Moved:            Cr Wellington
    Seconded:         Cr Glasgow
    That Council note the report by the Principal Environment Officer to the Planning &
    Environment Committee Meeting dated 12 March 2019 and:
    A.   Note the status of actions in the Noosa Koala Conservation Action Plan as outlined in
         Attachment 1 to this report and continue to:
         1.     Focus efforts towards large scale koala habitat protection and restoration
                projects such as the Yurol-Ringtail State Forests Conservation Project;
         2.     Support research into the abundance, distribution, movement and health of
                koalas in Noosa Shire in partnership with University researchers and koala
                groups; and
         3.     Investigate the latest citizen science data collection applications, particularly for
                recording fauna hit by vehicle, to help inform management actions; and
    B.    Note the outcomes of the Koala Infrastructure Audit & Feasibility Report as an action
          of the Koala Conservation Plan and as a result of this audit, agree to:
          1.    Include existing koala road infrastructure such as fencing, underpasses, escape
                poles and gates in Council’s asset management register in consultation with the
                Asset Planning Manager to enable ongoing maintenance funding and renewal of
                these assets;
          2.    Refer appropriate capital works such as extending fencing and installing two
                koala signs at Eenie Creek Road (Monks Bridge to Links Drive section) and an

                                                                                     Page 10 of 12

Section 11

RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING                                                       18 MARCH 2019

                additional koala sign along Weyba Road-Noosa Drive, for consideration as part
                of the 2019/20 budget process;
         3.     Investigate through the Traffic Advisory & Speed Management Committee a
                speed limit reduction to 50km/hr along Noosa Drive from Pinaroo Park
                roundabout to Weyba Bridge;
         4.     Where possible, retain regrowth vegetation along fence lines at Walter Hay Drive
                and Eenie Creek Road because of the scale and impact of maintenance clearing
                that would be required;
         5.     Develop new koala infrastructure for the Council road network only under the
                following circumstances:
                    When it is a requirement of a development application;
                    When it is a road/bridge renewal in a koala hotspot area as identified by
                     the Koala Infrastructure Audit & Feasibility Report; or
                    When data suggests that vehicle strike is the greatest threat to koalas in a
                     particular location and the new infrastructure will mitigate that threat.
                                                                                           Carried.


4   PROCUREMENT OUTCOME FOR FISHING FUTURES CONSULTANCY
    Committee Recommendation
    Moved:           Cr Stockwell
    Seconded:        Cr Pardon
    That Council note the report by the Environmental Services Manager to the Planning &
    Environment Committee Meeting dated 12 March 2019 on the outcome of the procurement
    process for the Fishing Futures directions paper.
                                                                                 Carried.



5   NOOSA BIOSPHERE RESERVE FOUNDATION - 2017-18 ANNUAL REPORT
    Committee Recommendation
    Moved:           Cr Wellington
    Seconded:        Cr Pardon
    That Council note the report by the Director Environment and Sustainable Development to
    the Planning & Environment Committee Meeting dated 12 March 2019 and note the report
    received from the Noosa Biosphere Reserve Foundation including the 2017/2018 Annual
    Report and Audited Financial Statement as provided at Attachment 1 and thank the volunteer
    Board Members of NBRF for their efforts.
                                                                                      Carried.




                                                                                   Page 11 of 12

Section 12

RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING                                                        18 MARCH 2019

6   PROPOSED EXPRESSION OF INTEREST FOR COMMUNITY ACTIVATION OF THE TOP
    FLOOR OF PEREGIAN BEACH SURF CLUB
    Committee Recommendation
    Moved:           Cr Wellington
    Seconded:        Cr Glasgow
    That Council note the report by the Property Advisor to the Services and Organisation
    Committee Meeting dated 12 March 2019 regarding the Peregian Beach Surf Club building
    and
    A.   agree Agree to proceed to an Expression of Interest (EOI) process to identify a local
         community group to offer a Permit to Occupy for Level 1 of the building, as detailed in
         the report;
    B.   Note that the EOI process will allow Council to consider appropriate available options
         for the facility and does not commit Council to entering into any future permit(s) without
         a further decision by Council; and
    C.   Note the recent correspondence direct to Councillors from the Acting Chief Executive
         Officer of Surf Life Saving Queensland (SLSQ) seeking full use of the building and
         request that staff formally invite SLSQ to submit a proposal for community activation of
         Level 1 of the building to allow consideration as part of the proposed EOI process.

    Cr Jackson called for a division on the voting. The motion was carried 5/2.
    For:        Crs Wellington, Pardon, Wilkie, Stockwell and Jurisevic
    Against:    Crs Jackson and Glasgow



7   FURTHER REPORT – MCU18/0102 REQUEST FOR NEGOTIATED DECISION NOTICE
    FOR VISITOR ACCOMMODATION TYPE 4 CONVENTIONAL (122 BEDS) AT 14-16
    MARY ST NOOSAVILLE
    Committee Recommendation
    Moved:             Cr Glasgow
    Seconded:          Cr Jurisevic
    That the debate on Item 7 be deferred to the Ordinary Meeting dated 21 March 2019 to allow
    staff to have further discussion with the applicant, at the applicant’s request.
                                                                                     Carried.


8   FINANCIAL PERFORMANCE REPORT
    Committee Recommendation
    Moved:           Cr Pardon
    Seconded:        Cr Jurisevic
    That Council note the report by the Manager Financial Services to the General Committee
    Meeting dated 18 March 2019 outlining February 2019 year to date financial performance
    against budget.
                                                                                    Carried.

                                                                                   Page 12 of 12

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.