2019-03-18 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 18 MARCH 2019
GENERAL COMMITTEE MEETING - LIVE RECORD MEETING NOTES
18 MARCH 2019 - Crs Frank Wilkie (Chair), Jess Glasgow, Ingrid Jackson, Joe Jurisevic,
Frank Pardon, Brian Stockwell and Tony Wellington
1 132008.1128.02 REQUEST TO CHANGE AN EXISTING APPROVAL FOR MULTIPLE
HOUSING TYPE 3 RETIREMENT & SPECIAL NEEDS; COMMERCIAL BUSINESS, TYPE
2 MEDICAL & WELLBEING, TYPE 1 HEALTH; & RECONFIGURING A LOT (1 INTO 2
LOTS) AT GRASSTREE CT & BEN LEXCEN DR SUNRISE BCH
Motion
Moved: Cr Stockwell
Seconded: Cr Glasgow
That Council note the report by the Coordinator Planning to the Planning & Environment
Committee Meeting dated 12 March 2019 regarding Application No. 132008.1128.02 to
make a minor change to an existing approval for Multiple Housing – Type 3 Retirement &
Special Needs; Commercial Business – Type 2 Medical and Wellbeing – Type 1 Health; and
Development Permit for Reconfiguring a Lot (1 into 2 lots) situated at Grasstree Court
Sunrise Beach and:
A. Amend the description of the approved use to Development Permit for Material
Change of Use for Multiple Housing – Type 3 Retirement & Special Needs and
Commercial Business – Type 2 Medical and Reconfiguring a Lot (1 into 2).
B. Approve the change and amend conditions 1, 5, 7, 12, 14, 18, 26, 27, 30.1, 33, 35,
39, 40.1, 41, 57, 64, 65 and 72 to read as follows:
1. The development must be undertaken in accordance with this approval and must
generally comply with the approved plans of development. The approved plans
are listed in the following table unless otherwise amended by these conditions.
Plan No. Rev. Plan Name Date
7448-06 Lots 1 & 9 Cancelling Lot 1 on SP177650 Prepared by 15 May 2008
Conics (Sunshine Coast) Pty Ltd
DA_106 Masterplan prepared by Smith and Tracey Architects November 2018
DA_107 Staging Plan prepared by Smith + Tracey Architects November 2018
DA_108 Precincts Plan prepared by Smith + Tracey Architects November 2018
DA_109 Pedestrian Circulation prepared by Smith + Tracey November 2018
Architects
DA_110 Vehicular Circulation prepared by Smith + Tracey November 2018
Architects
DA_111 Building Setbacks prepared by Smith + Tracey November 2018
Architects
DA_112 Landscaping Calculation prepared by Smith + Tracey November 2018
Architects
DA_113 Site Cover Calculations prepared by Smith + Tracey November 2018
Architects
DA_115 Typical Site Section A prepared by Smith + Tracey November 2018
Architects
DA_116 External Finishes Schedule prepared by Smith + November 2018
Tracey Architects
Page 1 of 12