2019-03-18 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 18 MARCH 2019
12. In conjunction with an application for operational works on the site for the first
stage, the applicant must submit an operational works application for Vegetation
Management for the development site. The Vegetation Management operational
works application must detail:
12.1 Identification of all active Glossy Black Cockatoo food trees within the
development footprint or in areas likely to be impacted upon by the
operation or construction of the development.
12.2 A Vegetation Clearing Offset program to be undertaken to re-establish the
habitat to be cleared from the site to a nearby location with similar soil
properties. A receiving site is to be identified and maintained for a specified
period (minimum 5 years) after the establishment of the receiving site.
12.3 The Vegetation Clearing Offset program must include the details of the
transfer methods to be engaged including:
12.3.1 The transfer of soil/seed bank media off the site to the designated
receiving site(s);
12.3.2 Methods of transfer including, inter alia, mastication of native
vegetative matter, tile transfer of live soil/plant matrix, peat
locations and extents, sexual and vegetative methods of
revegetation of offset receiving site and other deemed pertinent
matters by a person with industry experience in the successful
establishment and/or re-establishment of heathland vegetation;
12.3.3 Transfer of rare and threatened plant species (sexual and/or
vegetative);
12.3.4 Details of pre-treatment works prior to transfer of soil/seed bank
media off the site and methods of transplanting;
12.3.5 Details of seed collections times and estimated establishment
procedures and times;
12.3.6 Details of the receiving site, including tenure, contractual details,
establishment, monitoring and maintenance details and suitability
of the site for the purpose;
12.3.7 All information must be prepared by a person with industry
experience in the successful establishment and/or re-
establishment of heathland vegetation. Industry and educational
institution involvement is recommended.
The establishment of the vegetation offsets must be completed prior to the
commencement of the use of the first stage.
14. The Vegetation Management operational works application must detail the
location and extent of vegetation disturbance on Lot 9 SP252905 and Lot 6
RP901384 must be accurately marked on-site, including any setback
requirements for bushfire mitigation purposes, for Council officers to inspect prior
to commencement of any vegetation clearing.
Page 4 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.