20210080 522 Cooroy Mtn Rd IFC drawings
491 EXISTING
EXISTING
1638RP902161 CULVERT TO BE
CENTRE LINE
DEMOLISHED
//// //// //// //// //// //// //// //// //// //// //// //// //// //// //// //// ////
//// //// //// //// //// //// //// ////
//// //// //// //// //// //// ////
//// //// //// //// ////
//// //// ////
//// //// ////
//// ////
//// //// ////
//// //// ////
//// ////
//// //// ////
COOROY MOUNTAIN ROAD
//// //// ////
//// ////
//// ////
//// //// ////
.0
//// ////
100
//// //// ////
//// ////
////
////
5
98.
/
///
/
///
/
///
/ //// //// ////
/// //// //// //// //// //// 0
98.
//// //// //// //// //// //// //// //// //// //// //// //// ////
/ //// //// 99.0 //// //// //// //// //// ////
/// //// //// ////
/
/ //// //// ////
/
///
/// //// //// ////
/
////
//
//
////
////
/// //// //// //// ////
//
/ //// //// //// ////
//// ////
/
//
////
//// ////
///
//
////
//
//// ////
//
////
////
//// D D 97.5 //// ////
//// D ////
7.0
//
//// ////
99 9
////
////
//
////
.5
////
////
///
D
//
//// D
D
//
/
////
////
100.
//
///
/ 98.0
///
.0
//
5
//
1 /
10
//
///
/
////
/
//
///
///
//
//
/
///
//
/
/
//
///
////
//
//
///
/
/// BENCH MARK
//
/
/
/
///
/
EDGE OF
//
(PEG)
/
/
//
///
///
///
//
/
/// UNSEALED ROAD
//
R.L.= 100.00
/
//
/
///
///
/
////
/
100
//
/
/
///
/
///
.0
/
/
/
///
////
//
EXISTING
/
///
CULVERT TO BE
//
////
//
////
/
DEMOLISHED
///
/
///
////
////
/
///
/
///
////
////
/
///
/
///
////
////
/
///
/
///
////
/
////
///
/
///
////
/
////
///
/
///
101.
////
/
///
////
/
5
///
/
////
///
////
/
101.0
///
/
////
///
10
////
/
///
0.5
/
/
///
////
/
/
/
////
/
///
/
99.0
99.
/ / / /
/
5
/
///
/
////
/
/
/
////
///
/ / / / / / /
////
////
97
.5
/ / /
5
/ / /
98.
/
////
/ / / / /
////
/ / / / / / / / / / / / / / / / / / /
////
/ / / /
////
/ / / / /
EXISTING DRIVEWAY
/ / / / / / / / / / / / / / /
(DRIVEWAY 2)
/ / /
////
/
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / /
EXISTING
FENCE
PROPERTY EXISTING DRIVEWAY
BOUNDARY (DRIVEWAY 1)
NOTES:
1. FOR GENERAL NOTES REFER DWG 002, WHICH IS TO BE REQUESTED AND
7. CONTRACTOR TO LOCATE ALL EXISTING UTILITIES ON SITE AND MAKE 522
SUITABLE ARRANGEMENTS TO HAVE DISCONNECTED PRIOR TO
VIEWED PRIOR TO COMMENCEMENT OF CONSTRUCTION IF NOT SUPPLIED.
DEMOLITION WORKS BEGINNING.
9RP864130
2. THE CONTRACTOR WILL MAKE HIMSELF FULLY AWARE OF THE EXISTING
8. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON
FEATURES OF THIS SITE AND ENSURE ANY ADDITIONAL WORKS NOT
THIS DRAWING, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE
SHOWN ON THIS PLAN ARE INCLUDED IN THE CONTRACT.
WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.
3. LOCATION AND DEPTH OF EXISTING SERVICES BASED ON SURVEY, DBYD LEGEND:
9. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING
AND COUNCIL RECORDS. IT IS THE CONTRACTORS RESPONSIBILITY TO
PROPERTIES AND COUNCIL ROADS AND VERGES PRIOR TO PROPERTY BOUNDARY
CONFIRM ACTUAL LOCATION AND DEPTH PRIOR TO CARRYING OUT ANY
COMMENCEMENT OF ANY WORKS ON SITE.
EXCAVATION OR TRENCHING WORKS. 100 EXISTING MAJOR CONTOUR (0.5m INTERVAL)
10. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES,
4. CONTRACTOR TO LOCATE AND PROTECT ALL EXISTING SERVICES ON SITE EXISTING MINOR CONTOUR (0.1m INTERVAL)
ROADS AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE
PRIOR TO COMMENCEMENT OF WORKS.
U.N.O. //// //// //// //// ////
EXISTING EDGE OF PAVEMENT
5. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR TO ANY
11. WHERE NECESSARY, CONTRACTOR SHALL OBTAIN ALL NECESSARY
NOTE:
DEMOLITION WORKS COMMENCING ON SITE. EXISTING INVERT OF TABLE DRAIN
APPROVALS TO CARRY OUT SERVICES RELOCATION OR ALTERATIONS. EXCEPT WHERE NOTED ON PLAN AND ASSOCIATED DESIGN DRAWINGS,
ALL IN-GROUND SERVICES WITHIN THE PROPERTY BOUNDARY INCLUDING
6. ALL VEGETATION WITHIN THE LIMIT OF WORKS TO BE CLEARED, MULCHED D D EXISTING STORMWATER DRAINAGE
12. SURVEY UNDERTAKEN BY MAX WATTERSON & ASSOCIATES (REF BUT NOT LIMITED TO: STORMWATER DRAINAGE, SEWERAGE, WATER, GAS,
AND REMOVED FROM SITE IN ACCORDANCE WITH APPROVED VEGETATION ELECTRICAL AND COMMUNICATIONS TO BE SAFELY BE DISCONNECTED,
20-5302AA). ASSUMED DATUM WAS ADOPTED FOR THE PROJECT. REFER TO
CLEARING PLAN (BY OTHERS) OR IF SCHEDULED STOCKPILE FOR USE BY EXISTING TREE REMOVED FROM SITE AND CAPPED OFF AT SITE BOUNDARY. CONTRACTOR
ORIGINAL SURVEY FOR SET OUT.
LANDSCAPER. TO ARRANGE ALL NECESSARY APPLICATIONS AND PERMITS WITH THE
RELEVANT AUTHORITIES. SERVICES TO BE CAPPED IN ACCORDANCE WITH
RELEVANT SERVICE PROVIDER SPECIFICATIONS AND STANDARD DETAILS
North Point Approved Project Address Title
522 COOROY MOUNTAIN RD EXISTING FEATURES PLAN
ADAM BROUGHTON RPEQ 8915
COOROY MOUNTAIN
N
For and on behalf of RECOR Pty Ltd.
Scale ENGINEERING & PROJECT SERVICES Client Details Project Name Sheet Size
SUNSHINE COAST | BRISBANE
B 10.07.24 ISSUE FOR CONSTRUCTION AB MP SCALE
1 0 1 2 3 4 5
(metres)
www.recor.au | ABN 89 647 469 707 TRAVIS MCCARTHY PROPOSED DRIVEWAY UPGRADE A1
1 : 100 (FULL SIZE) Project Number Drawing Number Revision
A 23.04.24 ISSUE FOR OPW APPROVAL DK AB COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's
20210080 C010 B
client. This drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as
Rev Date Revision Description Drawn Check DO NOT SCALE, IF IN DOUBT ASK 'Issued For Construction' in the revision description.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (20210080 522 Cooroy Mtn Rd IFC drawings.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.