Original source · versioned page text
Attachment H - Environmental Values Assesment
Callaghan and Toth Consulting Engineers______________________________________________________
Biodiversity Overlay
retained and managed to avoid erosion
and landslide and to protect natural
resources and values.
Engineering and site works The proposed new Hinterland Playground is located in
O14 Development is sited and designed S14.1 Works, including roads, driveways, fences, existing cleared areas and is located south of the existing
to – sewer lines and other infrastructure – riparian vegetation along Cooroy Creek.
a) provide adequate separation distance a) do not transect areas of vegetation; or
between the vegetation to be b) are co-located within a combined utility corridor; During construction the retained vegetation will be clearly
protected and the development to and marked to ensure the retained vegetation is protected.
avoid disturbing, destabilising and c) provide for fauna underpasses, speed reduction The CEMP for the works will detail vegetation protection
deoxygenating any tree or altering the devices and associated fencing, lighting and requirements including stockpiling around retained
drainage; warning signs, where appropriate; vegetation, access requirements, machinery access
b) avoid traversing or fragmenting AND requirements etc.
vegetation or habitats for significant S14.2 Development within or adjacent to areas of
flora or fauna species; and vegetation, incorporate fauna friendly fences;
c) avoid creating barriers to faunal AND
movement. S14.3 Vegetation is protected from interference
resulting from clearing or construction activities by-
a) clearly marking vegetation to be retained with
flagging tape;
b) installing protective fencing around the dripline of
the vegetation and avoid filling and excavation in
these fenced areas; and
c) ensuring stock piling, storage and vehicle parking
occur outside the identified vegetation areas;
AND
S14.4 Low impact construction techniques are used
around vegetation to minimise interference with the
vegetation.
Filling and excavation The proposed extension will require earthworks to create
O15 Vegetation is not adversely impacted No solution provided. the playground.
upon by earthworks and changes to the
hydrological regime, including changes to Hydrology and Water Management Consulting has
ground water levels, flooding levels, run- undertaken a flood study to review the affect of the
off and tidal hydraulics. proposed works for the proposed Hinterland Playground
on flooding levels. The report found that the existing and
developed case will not change the flooding levels, as
long as some mounds are removed and proposed viewing
platforms are taken out of the design. These changes
have been made to the design plans.
1. X:\JOBS\CT Projects in progress\2001 env reports for cooroy playground carparks\Correspondence\Reports\ENV\Playground\Biodiversity Overlay_HInterlandPlayground.docx pg. 13
pg. 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment H - Environmental Values Assesment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.