Council archive · source document
Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12/0208
Plans and drawings: the text below has words only, no drawings.
Very large file (23.8 MB): may take a few minutes to open.
Plm bMcod, h",
S\lii\i i~!~ii80602707
THIS IS THE NEXT PART OF A
MULTIPLE PART RECORD
Part L-D Of ~l
pplication number: N\c..~ \ ~ (()LD~
I
I
., I’,,!. (’ ~~
C -
\.,
~, ’,",.- "’ (" .
1
1
J
.
......
.
.... f t. \._, ,..)." .",,-
C:\Docume sand Settingsleje\DesktoplMulti Part Record Cover Sheet NEXT PART
~
(J).doc )I’
~
’) n
-C 2012 ~c, c:::,
l 0 L. r:
’
I
"
.:j If.l;i
(’) -=t7
.
~ rv
,’, ~ C!) f)"i
I ~ Box: "",,/.,,7... R: ....0...... r’.i::: tt> ;-’
[\. ’""’~
.. ..
~
,,,-~. ’ ,~~
\_ i
,! (...i.\...;’~ v Gv
l~ ’-
r/Vl ,’.\ ~ (:,,’ I,’
\~....~, //’
, .’ ./’
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 34 pages
Page 2
PROJECT
rwo~)sa
on weyba
INTEGRATED WATER
CYCLE MANAGEMENT PLAN
NOOSA ON WEYBA
DEVELOPMENT,WEYBA
DOWNS, QUEENSLAND
PREPARED FOR
NORTHBROOK CORPORATION PTY LTO
DATE
AUGUST 2012
Page 3
DOCUMENT CONTROL
DOCUMENT 10838_IWCM_RS2F.docx
TITLE Integrated Water Cycle Management Plan, Noosa on Weyba Development,
Weyba Downs, Queensland
PROJECT MANAGER E. Holton
AUTHOR(S) R. Savage
CLIENT Northbrook Corporation Pty Ltd
CLIENT CONTACT Steve Macrae
CLIENT REFERENCE Noosa on Weyba Integrated Water Cycle Management Plan
SYNOPSIS This report provides an overview of the Integrated Water Cycle
Management (IWCM)options and the recommended implementation plan at the
proposed Noosa on Weyba Development site.
REVISION HISTORY
REVISION # DATE EDITION BY APPROVED BY
08/12 R. Savage C. Anderson / L. Varcoe
2 08/12 R. Savage L. Varcoe
DISTRIBUTION
REVISION NUMBER
Distribution 2 3 4 5 6 7 8 9 10
Northbrook Corporation Pty
G&S library & file
Brisbane Sydney Melbourne and regions Agriculture.Water. Environment.
20/115 Wickham Street Fortitude Valley Brisbane QLD 4006 I GPO Box 9856. Brisbane QLD 4001
Phone 07 3852 3999 I Email [email protected] I www.access.gs
Page 4
www.ac ss.gs +GILBERI
SlJT1-ERlAN)
SUMMARY
Northbrook Corporation Pty Ltd commissioned Gilbert & Sutherland
Pty Ltd (G&S)to prepare an Integrated Water Cycle Management
(IWCM)Plan for the proposed Noosa on Weyba development,
Weyba Downs, Queensland. This involved an initial assessment of
the IWCM options, a detailed analysis of the rainfall in the Noosa on
Weyba development area, an analysis of the rainfall harvesting
water balance for various rain tank sizes as well as the rainfall
harvesting performance for the proposed development precincts for
a defined rain tank size.
Soil, groundwater and open area space constraints precluded the
sustained irrigation or in-situ use of wastewater effluent and/or
treated stormwater runoff, with the result that the IWCM Plan is
focused on the provision of rainfall harvesting tanks at all
residences, townhouses and apartment blocks. This involves the
installation of rain tanks at each dwelling, or groups of tanks serving
blocks of units. These tanks will provide water for toilet cisterns,
garden irrigation and laundry use at each unit, as well as improve
the quality of stormwater runoff into the receiving environment
surrounding the developed areas.
Based on the historic rainfall records from the Noosaville and
Tewantin RSL Park rainfall stations, as well as assumed dwelling
sizes and contributing roof areas, it was found that 10,000 L tanks
could, on an annual average basis, supply approximately 96% of
the standard residential household demands for toilet cisterns,
garden irrigation and laundry use. This in turn represents
approximately 25-30% of the total household demand, a significant,
sustained off-set from the bulk water supply system serving the
Noosa area.
1 0838_IWCM_RS2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PTY LTO _
IWCM 3
Page 5
www.ac ss.gs
+GILBERI
SlJT1-ERI.
CONTENTS
1 Introduction........................................................................7
1 .1 Background..................... ..................................................
7
1 .2 Proposed development .............................7
........................
1.3 Objectives of Integrated Water Cycle Management.......... 7
1.4 Purpose of this report.. ......................................................
8
2 Site description.................................................................. 9
2.1 Property description........ ..................................................
9
2.2 Geology...........................................................................10
2.3 Topography.....................................................................10
2.4 Drainage..........................................................................10
2.5 Vegetation.......................................................................10
2.6 Current land use.............................................................. 11
2.7 Surrounding land use ......................................................
11
3 Approach and methodology.......................................... ..12
3.1 Methodology.................................................................... 12
3.2 Legislative and I nstitutional Context.......... ......................
12
4 Key considerations for developing IWCM Options..........13
4.1 Type and extent of the development.. .............................
13
4.2 Proximity to bulk water and wastewater services............ 13
4.3 Site constraints................................................................ 13
5 IWCM options................................................................. .14
5.1 Option 1...........................................................................14
5.2 Option 2...................... .....................................................
14
5.3 Option 3...................... .....................................................
14
5.4 Option 4...........................................................................14
5.5 Selection of preferred option................ ...........................
15
6 Results -
Analysis of rainwater harvesting option ..........
.16
6.1 Rainfall statistical summary.... .........................................
16
6.2 Rainwater tank assessment............................................ 17
6.3 Precinct approach -
total catchment rainfall capture and
reuse ...............................................................................18
4 AGRICULTURE WATER ENVIRONMENT
Page 6
www.access.gs
+GILtERI
SlJT1-ERlAN)
7 Conclusions .....................................................................21
8 Recommendations......... ................................................
.22
9 Limitations of reporting.... ....23
............................................
10 Appendix 1 -
Figures ......................................................25
11 Appendix 2 -
Summary of IWCM options........................27
10838_IWCM_RS2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PTY LTD -IWCM 5
Page 7
www.ac ss.gs
+GILBERI
SlJT1-ERI.
LIST OF FIGURES
FIGURE NO. DESCRIPTION
6.2.1 Rainwater tank balance model configuration
A1 Site location
A2 Master plan precincts with rainfall harvesting storage
B1 IWCM Option 1
B2 IWCM Option 2
B3 IWCM Option 3
B4 IWCM Option 4
C1 Rainfall stations and STP locations for IWCM
C2 Rainwater storage tanks
6 AGRICULTURE WATER ENVIRONMENT
Page 8
www.ac ss.gs +GILtEHI
SUT1-ERI.AN)
Table 1.2.1 Indicative site yields
1 Introduction
Estimated
Product
dwellings
Northbrook Corporation Pty Ltd commissioned Northbrook land
Gilbert & Sutherland Pty Ltd (G&S)to prepare an
Premium residential lots 73
Integrated Water Cycle Management Plan
Apartments / Mixed use 50 (est.)
(IWCMP)for the proposed Noosa on Weyba
development (’the development’), Weyba Downs, Retail (600 m2)
Queensland. The site location is shown in Figure Townhouses 83
A 1 in Appendix 1.
Retirement villas/Aged care 120
1.1 Residential lots (Precinct F,G) 164
Background
Total 490
Seven allotments of land make up the site,
however development is proposed only on Lot 2 Hofmann Land
on SP179590, Lot 53 on SP163571 , Lot 11 on Townhouses (Precinct H) 24
RP893393 and Lot 12 on RP893393. The
Residential lots (Precinct H) 52
remaining lots (being Lot 7 on RP46782, Lot 2 on
Residential lots (Precinct I) 203
RP160983 and 1667 on M37772) will be excluded
from the development area as part of a Biodiversity Rural residential lots 1
Development Offset Area (BDOA)agreement. Special residential (Precinct K) 6
The BDOA involves the dedication of these lots (a
Retirement cottages 100
total area of 139.5ha) to the Noosa National Park
Total 386
as high to medium value Koala habitat.
It is understood that the majority of the
Figure A2 in Appendix 1 shows the proposed
investigation area has historically been used for development layout, including the BDOA.
agricultural purposes, specifically livestock
grazing. 1.3 Objectives of Integrated Water
Cycle Management
1.2 Proposed development
The objectives of integrated water cycle
The draft master plan for the Noosa on Weyba
management (IWCM)are primarily:
development proposes the creation of various
To proactively conserve the water resources
rural and residential precincts across the 163ha
of the region through responsible design at
development area. A breakdown of the proposed
the development level; and
residential development across the site is
provided in the Table 1.2.1. To proactively safeguard, and seek to
improve, the water quality in all waterways
The proposed development would include: related to the development.
Subdivision via a Community Title Scheme to
Reference to the ’water cycle’ requires that the
create new lots/land parcels for future
key elements of water demand, wastewater and
development.
stormwater are assessed in an integrated manner
Bulk earthworks where required.
which reduces water demands from the region’s
Construction of internal roads and water resources, meets all wastewater treatment
connections with existing roadways. and effluent discharge specifications, and ensures
that both the quantity and quality of stormwater
Construction of stormwater, water reticulation
runoff do not negatively impact on the receiving
and sewerage infrastructure.
environment.
1 0838_IWCM_RS2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PTY LTO _
IWCM 7
Page 9
www.ac ss.gs
+GILBERI
SlJT1-ERI.
1.4 Purpose of this report
The purpose ot the IWCM assessment
documented in this report is to:
Develop a range ot options tor consideration
in the management ot the total water cycle;
and
To select an IWCM Plan that is practical, cost-
effective, aligned with all the components ot
land development and meets the IWCM
objectives ot the development.
8 AGRICULTURE WATER ENVIRONMENT
Page 10
www.ac ss.gs +GILEEHI
SUT1-ERJ.AN)
residential land to the west, the proposed BDOA
2 Site description
land on Lot 2 on RP160983 and Lot 1667 on
CP M37772 to the east and residential land to the
north. The northeastern portion of the site is
2.1 Property description
bounded by Eenie Creek.
The site is approximately 164ha in area and is
described as Lot 2 on SP179590 and Lot 53 on The eastern portion of the site (Lots 11 and 12) is
bounded by Tidswell Road to the west, Hollet
SP163571, Parish of Tewantin County of March;
and Lots 11 and 12 on RP893393, Parish of Road to the North and Lake Weyba to the east.
Weyba County of March. A summary of the site description, including its
location within the Noosa Shire of Queensland, is
The western portion of the site (Lots 2 and 53) is
bounded by Hollett Road to the south, rural presented in Table 2.1.
Hollett Road, Noosaville, Queensland, 4566
Lot 2 on SP179590, Lot 53 on SP163571, Lot 11 on RP893393 and Lot 12 on
RP893393
Northbrook Corporation Pty Ltd, Starbrite Investments Pty Ltd, Godfrey and
Jennifer Mantle and John and Kathleen Hoffmann.
Rural and rural settlement
Residential
Livestock grazing
Residential
Approximately 163 hectares (ha)
One (1)storage shed and 1 holiday house
Lot 2 on SP179590, Lot 53 on SP163571, Lot 11 on RP893393 and Lot 12 on
RP893393
Pasture grass cover
Residential premises and residential development land are located
adjacent to the northern site boundary.
The Noosa Airport is situated to the north-east of the site.
Rural residential estates border the sites western boundary
Lake Weyba borders the far eastern boundary of the site.
The Weyba Nature Refuge is located to the southeast of the site.
An Eco Tourism Resort development to the south of Lots 11 and 12.
Lake Weyba is the nearest major water body to the site and is located
adjacent to the eastern boundary of Lot 11 and Lot 12 on RP893393. Lake
Weyba is a shallow tidal lake, which drains through Weyba Creek into the
Noosa River. Eenie Creek, which flows directly into Lake Weyba forms the
northern boundary of Lot 53 on SP163571. Keysers Creek (an ephemeral
creek) flows through the low-lying western portion of Lot 11.
1 0838_IWCM_RS2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PTY LTO _
IWCM 9
Page 11
www.ac ss.gs
+GILBERI
SlJT1-ERI.
2.2 Geology 2.5 Vegetation
A review of the Geological Survey of Queensland The 164ha site has been extensively cleared of
1 :100,000 Geology Series Map No 9543 native vegetation to facilitate agricultural grazing,
(Brisbane)indicates that the site forms part of the primarily by cattle. Short grass cover is abundant
Tiaro Coal Measures of the Duckinwilla Group across most areas of the site. Small clusters of
and is underlain by lithofeldspathic labile and trees (remnant and regrowth species) are
sublabile to quartzose sandstone, siltstone, shale, scattered throughout the site, with denser
coal, and ferruginous oolite marker beds. This has bush land located to the east and west of Lot 53
been lateritized in part on the western portion of on SP163571. The dominant tree species are
Lot 11 and the majority of Lots 2 and 53. Acacia spp., Melaleuca spp. and Eucalyptus spp.
A veneer of Quaternary flood plain alluvium exists Plate 1 shows a representative area typical of the
in the lower lying areas of Lots 2 and 53 and on site vegetation, dominated by grasses with
the lower terrace adjacent to Lake Weyba on Lots scattered Eucalyptus spp.
11 and 12.
2.3 Topography
The site topography is mostly level to gently
inclined (<1% to 5%)with some moderate to
steep slopes associated with the eastern
boundary fronting Lake Weyba. The site elevation
ranges from <2.5m AHD to 20m Australian Height
Datum (AHD).
Lot 2 on SP179590 and Lot 53 on SP163571 are
dominated by a centrally located hill (up to 20m
AHD) with low lying areas located at the base, to
the north, east and west. Low lying areas are
located towards the south-west portion of Lot 11
Plate 1 View to the east (toward Lake Weyba)
on RP893393 and towards the eastern site
from within the bounds of Lot 11 on RP893393,
boundary of Lot 11 on RP893393 and Lot 12 on
showing typical vegetation within the investigation
RP893393, adjacent to Lake Weyba.
area
2.4 Drainage The DERM Regional Ecosystem (RE)mapping for
the site indicates the following REs associated
The elevated portions of the site are generally well
with the site:
drained, due largely to the predominantly friable
nature of the soils and the gentle slopes. Some
12.5.3 E. tindaliae and/or E. racemosa open
low-lying areas are poorly drained due to their low forest on remnant tertiary surfaces. This RE is
relief and the clayey texture of their subsoils.
present in the western and central south-
eastern portions of Lot 53 and the central and
An ephemeral creek, known as Keysers Creek,
south-eastern portions of Lot 11 .
flows through the low-lying western portion of Lot
11 on RP893393. No flow was detected at the 12.3.5 Melaleuca quinquenervia open forest on
time of the site inspection undertaken for the coastal alluvium. This RE is present in the
northern half of Lot 2 and the central western,
range of investigations necessary for this project.
A dam in the western portion of Lot 11 on south-eastern and north/north-eastern portions
RP893393 intercepts water flowing through of portions of Lot 53.
Keysers Creek.
10 AGRICULTURE WATER ENVIRONMENT
Page 12
www.ac ss.gs +GILEEHI
SUT1-ERJ.AN)
12.3.4 M. quinquenervia, E. robusta open remediated between November 2007 and January
forest on or near coastal alluvial plains. This 2008 and facilitated the removal of the lot from the
RE is present in the south-eastern portion of Environmental Management Register (EMR).
Lot 53.
12.3.11 E. siderophloia, E. tereticornis,
2.7 Surrounding land use
Corymbia intermedia open forest on alluvial The surrounding land use is summarised as
plains usually near the coast. This RE is follows:
associated with the northeastern portion of Lot
Bordering the site directly to the north is a
53.
residential development.
2.6 Current land use The Noosa airport is located to the north-east
of the site.
At the time of the site investigation, the site was
Lake Weyba is located to the east of the site,
being used primarily for livestock grazing. An
on the eastern boundary of Lot 11 and Lot 12
existing storage shed was identified near the
on RP893393.
eastern boundary of Lot 53 on SP163571. The
shed is likely to have been used for the storage of Eenie Creek, which flows directly into Lake
vehicles, agricultural machinery and livestock Weyba, forms part of the northern border of
feeds. A number of dams are located throughout the site.
the site. These dams are currently used for stock
Vegetated private and public land (including
watering purposes. Lake Weyba Nature Reserve) is located to the
south and south-west of the site.
A former livestock dip and associated structures,
was located in the central portion of Lot 53 on An Eco Tourism Resort development south of
SP163571. The dip was demolished and Lots 11 and 12.
1 0838_IWCM_RS2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PTY LTO _
IWCM 11
Page 13
www.ac ss.gs
+GILBERI
SlJT1-ERI.
The integration of water use in its area.
3 Approach and
In developing and implementing the plan, the local
methodology government must have regard to the SEQ
Regional Plan and any sub-regional total water
cycle management plans prepared under the SEQ
An overview of the approach and methodology
Regional Plan. Key issues for the plan to consider
adopted for this study is outlined below:
include (Section 19 (4)):
3.1 Methodology A strategy for water demand management;
Ways to increase the recycling of waste water
The methodology adopted for the IWCM
and stormwater, e.g. for industrial or
investigations included the following key activities:
agricuHural use; and
Review and detailed analysis of rainfall data The impacts of existing and future land-use on
applicable to the project area (3stations); water cycle management.
Development of conceptual IWCM options for
It is also important to note the requirements of the
the project;
Review of IWCM options with respect to site Oueensland Development Code (ODC)MP 4.2-
Water Savings Targets for Class 1 buildings
constraints;
Review of water demand off-sets and unit connected to a reticulated town water supply
demands in SEQ; system, where Class 1 (a)means ’one or more
Formulation of water balance model and output buildings, which in association, constitute a single
for a typical detached, single-family residence dwelling (detached)or one of a group of attached
for a range of rain tank sizes; dwellings’, and where Class 1 (b)means ’a
Refine IWCM concepts to 4 options, prepare boarding house, guest house, hostel, etc., with
schematics and discuss with infrastructure total floor areas not exceeding 300m2, or in which
not more than 12 persons would ordinarily be
planning engineers;
resident’.
Selection of key focus areas for IWCM after
consideration of all site limitations; and
A rainwater tank is required for these buildings,
Precinct modelling of rainwater harvesting to
with a minimum storage volume of 5,000L for
determine potential water demand off-sets for
detached Class 1 buildings and 3,000L for Class 1
each precinct.
buildings other than detached dwellings. The
minimum roof area for rain collection should be
3.2 Legislative and Institutional Context the lesser of 100m2 or 50% of the total roof area.
Part 6, Division 2 (Section 19) of the The rain tanks should be connected to the cold-
Environmental Protection (Water)Policy 2009 water plumbing for toilet flushing and washing
(Reprint No. 10 of 29 June 2012) requires a machine use internally and for garden irrigation
distributor-retailer’s participating local government externally. The applicable water savings targets
to develop and implement an environmental plan for the Noosa on Weyba area are:
about water cycle management for its local
70,000 L/year for new, detached dwellings;
government area. In the case of Noosa on and
Weyba, the distributor-retailer is Unitywater and 42,000 L/year for all other new Class1
the participating local government is the Sunshine
buildings.
Coast Regional Council.
The provisions for this legislative and institutional
The total water cycle management plan must
context are therefore key considerations for the
consider the following (Section 19 (2)): IWCM Plan for Noosa on Weyba.
The collection, treatment and recycling of
waste water, stormwater, ground water and
other water sources; and
12 AGRICULTURE WATER ENVIRONMENT
Page 14
www.ac ss.gs +GILEEHI
SUT1-ERJ.AN)
The closest sewage treatment plant (STP)is
4 Key considerations for the Noosaville STP, off Eenie Creek Road,
developing IWCM Options approximately 6km by road north east of the
project area;
the bulk sewerage north of the project area
4.1 Type and extent of the development comprises both gravity and pumping mains
delivering sewage to the Noosaville STP;
The Noosa on Weyba project comprises a range
potable water supply would have to be
of residential development precincts, including
sourced from the Noosaville water supply
freestanding dwellings, townhouses and mixed-
zone and would be subject to the
use areas with low-rise apartment blocks. As is
requirements of Unitywater.
evident in Figure A2 (Appendix 1), the proposed
BDOA comprises the majority of the land under
4.3 Site constraints
consideration, while the developable areas are
Site-related factors impacting on the IWCM
primarily located on previously farmed pastures
and grasslands. The project area is split into considerations are as follows:
eastern and western portions by Walter Hay Drive The low-lying areas of the site are shallow-
and a number of the residential precincts are
graded and poorly drained, making it difficult
separated by drainage lines and/or conservation to utilize undeveloped land area for retention
corridors. Existing developments in close basins or any form of effluent disposal;
proximity to the project area are located north- Much of the designated ’greenspace’within
west and south of the land under consideration. the proposed development areas (i.e.
Lake Weyba is located on the eastern boundary of excluding areas within the BDOA) cannot
the project area and all natural drainage from the
support continuous inundation, again limiting
project area currently flows into the lake. proposals for retention basins or any form of
effluent disposal;
4.2 Proximity to bulk water and The proposed development area is outside
wastewater services the current Noosa Plan Priority Infrastructure
The project area all falls outside of the Priority Area and thus bulk servicing requirements for
Infrastructure Area (PIA)for the Noosa Plan, water supply, and wastewater conveyance,
treatment and disposal need to be carefully
although the northern lot boundaries of the project
area do bound to the PIA. There are no bulk water
considered to reduce costs, as well as to
minimise any environmental impacts.
or wastewater services within the project area.
This does open up opportunities for consideration
In considering the IWCM options, it was, in the
of IWCM strategies which will reduce the
first instance, important to recognize the distance
infrastructure charges associated with providing or
of the proposed development areas from the
connecting to existing bulk water and wastewater
existing bulk services. There was initially
services.
uncertainty as to whether or not sewage could be
The project engineers, Cardno, have reported accepted at the Noosaville STP from the Noosa
on Weyba development due to current capacity
separately on the investigations of the water
constraints and uncertainty regarding the
supply and wastewater systems serving the
Tewantin and Noosaville areas, however key scheduling of the necessary augmentations. The
site constraints on effluent disposal do however
points to note are the following:
ultimately make any sustained on-site sewage
The water and wastewater Distribution-
treatment and disposal very problematic.
Retailer for the project area is Unitywater,
serving the Sunshine Coast Regional Council In the interests of completeness therefore, various
and all Local Councils within the SCRC area treatment and re-use alternatives were identified
of jurisdiction; and included in the IWCM options.
1 0838_IWCM_RS2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PTY LTO _
IWCM 13
Page 15
www.ac ss.gs
+GILBERI
SlJT1-ERI.
space irrigation and for domestic use in toilet
5 IWCM options
cisterns, laundry and garden irrigation;
Communal or precinct rain water harvesting
The options selected for discussion are presented for open space irrigation;
schematically in Figures 81, 82, 83 and 84 in Roof tank overflow and stormwater flows
Appendix 1. A summary of these options is through bio-retention swales and basins,
presented in Appendix 2. prior to creek discharge.
5.1 Option 1 5.3 Option 3
Option 1, which involves maximising the on-site Option 3 is a variant of Option 2 and utilises on-
re-use of wastewater generated by the project, site sewage treatment to Class A for open space
requires the installation of on-site water and domestic irrigation. Domestic rainwater
management infrastructure. The cost of this harvesting from roofs would serve internal uses
infrastructure would need to be compared to
only (toilet cisterns and laundry). Should a
headworks costs and charges for connections into connection to the Noosaville STP be unavailable,
the municipal water and wastewater systems. this option would require further investigation. The
Whilst this option has potential to substantially
key elements of Option 3 are:
reduce demand on the municipal water supply
Domestic water supply: sourced from the
system and minimise return flow rate from the site
municipal supply and domestic rain tanks (for
into Lake Weyba, it requires the long-term
toilet cisterns and laundry);
availability of land capable of supporting sustained
irrigation. The key elements of Option 1 are: Wastewater management: sewerage from
development precincts to an on-site package
Domestic water supply: sourced from the
plant treating to Class A standard for open
municipal supply and domestic rain tanks;
space irrigation and for domestic use in toilet
Wastewater management: sewerage from
cisterns, laundry and garden irrigation;
development precincts to an on-site package
Roof tank overflow and stormwater flows
plant treating to Class A standard for
domestic garden and open space irrigation;
through bio-retention swales and basins,
prior to creek discharge.
Roof tank overflow and stormwater to bio-
retention swales and basins, upstream of 5.4 Option 4
stormwater harvesting and treatment for
Option 4 assumes sewage is treated off-site at the
open space and domestic garden irrigation.
Noosaville STP and maximises rainwater
5.2 Option 2 harvesting at each residence. This option is
typical of IWCM systems in high rainfall areas and
Option 2 maximises on-site sewage treatment and includes the following elements:
re-use. Rainwater harvesting is from roofs on a
Domestic water supply: sourced from the
local or precinct scale. In the event that a
municipal supply and domestic rain tanks (for
connection to the Noosaville STP is unavailable,
toilet cisterns and laundry);
this option would require further investigation. The
key elements of Option 2 are: Wastewater management: sewerage from
development precincts to the Noosaville STP;
Domestic water supply: sourced from the
municipal supply and treated sewage effluent Domestic garden irrigation supplied from the
(for toilet cisterns and laundry); domestic rain tanks;
Wastewater management: sewerage from Roof tank overflow and stormwater flows
development precincts to an on-site package through bio-retention swales and basins,
plant treating to Class A+ standard open prior to creek discharge.
14 AGRICULTURE WATER ENVIRONMENT
Page 16
www.ac ss.gs +GILEEHI
SUT1-ERJ.AN)
5.5 Selection of preferred option potentially significant capital cost and its reliance
on the provision of suitable land capable of
In selecting the most appropriate option(s) for
sustaining long-term irrigation.
further analysis, this IWCM investigation
acknowledged the ongoing uncertainty as to Options 1, 2 and 3 assume on-site sewage
whether sewage generated by the development
treatment is required and would have to carry both
could feasibly be pumped to the Noosaville STP.
the capital and operating costs of that assumption.
In addition, the selection process was informed by
They each maximize the benefits of rain water
the soil survey, groundwater and stormwater
harvesting (from communal or domestic systems
studies that identified potential constraints in
respectively) which improves the management of
respect of the sustained, on-site use of the both stormwater quality and quantity. Communal
various effluent streams (treated sewage, treated
rainwater harvesting systems can however pose
stormwater and communal rain tanks).
operational problems for staged developments
where both inflow rates and utilisation rates are
The IWCM options represented a range from
low.
maximum on-site use of effluent streams (i.e.
Option 1) through to a focus on domestic rain The domestic rain tank system in Option 4 was
tanks and bio-retention swales and basins for
selected for further analysis as it lends itself to
stormwater quality management whilst minimising
staged development and is capable of achieving
the need for sustained open space irrigation
compliance with the demand off-set targets
(Option 4). specified in the Queensland Development Code.
In the event that a connection to the Noosaville
Option 4 also includes the construction of bio-
retention swales and basins for stormwater
STP is unavailable (at least in the early stages of
management, particularly to improve the quality of
residence on the site), sewage would have to be
stormwater runoff. Although the headworks costs
treated at an on-site package plant, including the
to secure connections to both the municipal water
recycled water reticulation. In the alternative,
and wastewater systems require further
provisions would need to be made to tanker
investigation, Option 4 can achieve a prudent and
sewage to the Coolum STP until such time as a
effective balance for IWCM by reducing impacts
connection to the Noosaville STP could be
on the surrounding areas and sizing rain water
achieved. It must be noted that the cost of
tanks to achieve substantial off-sets of potable
pumping sewage through to the Noosaville STP
water demand from the municipal supply system.
would not be insignificant but would allow for
effluent disposal through an existing system.
The results of further analyses associated with
Option 4 are presented in Section 6.
Option 1, which includes a full stormwater
harvesting treatment and distribution system, was
not selected for further analysis on the basis of
1 0838_IWCM_RS2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PTY LTO _
IWCM 15
Page 17
www.ac ss.gs
+GILBERI
SlJT1-ERI.
Table 6.1.2 Monthly rainfall statistical summary
6 Results -
Analysis of (mm)Noosaville (SILO)
rainwater harvesting option Month Average Median 95% I
January 222.5 169.7 612.9
February 240.7 178.5 657.3
As detailed in Section 5, the IWCM option
March 242.5 202.3 550.7
selected for further analyses minimises the
April 175.3 153.7 433.1
requirement for sustained on-site use of the
effluent streams and concentrates on the systems May 158.3 138.1 363.6
that enable demand off-sets from the potable June 115.4 81.6 346.3
supply network and maximise stormwater quality 86.6 59.7 242.6
July
and quantity benefits. The further investigation of
August 61.0 49.1 146.3
the IWCM systems therefore focused on the rain
tank water balance characteristics and demand September 64.2 52.4 159.7
off-sets possible for each precinct. October 93.0 79.8 224.3
November 115.7 95.8 253.6
6.1 Rainfall statistical summary
December 160.3 148.3 355.9
This assessment used rainfall data from a number
Table 6.1.3 Annual rainfall statistical summary
of locations in the Noosa Shire, including
Tewantin RSL Park, Eumundi-Crescent Road and (mm)Tewantin RSL Park
Tewantin RSL Park rainfall statistics
Noosaville. Figure C1 in Appendix 1 shows the
location of these rainfall gauging stations in Period 1996-2012
relation to the Noosa on Weyba development site. Average 1,637.6
Median 1,455.8
Tables 6.1.1 to 6.1.6 (on this and following pages) Standard deviation 488.5
provide a summary of the rainfall data utilised for 95% 2,508.5
this assessment. It should be noted that the SILO
75% 1,896.8
rainfall data is interpolated from measured data
25% 1,310.9
from adjoining stations.
5% 1,176.0
Table 6.1.1 Annual rainfall statistical summary
Table 6.1.4 Monthly rainfall statistical summary
(mm)Noosaville (SILO)
Noosaville (SILO)rainfall statistics
1 (mm)Tewantin RSL
Month Average Median 95%
Period 1889-2912
January 209.8 168.2 534.8
Average 1,735.6
February 235.2 179.3 657.3
Median 1,626.2
March 221.6 196.4 502.8
Standard deviation 472.9
April 173.3 153.7 414.9
95% 2,333.6
May 157.6 134.9 363.6
75% 2,066.0
June 115.5 81.1 334.5
25% 1,419.5
July 83.6 60.0 242.6
5% 1,081.2
August 64.9 49.1 151.5
September 60.2 42.3 159.9
October 95.0 79.8 251.9
1
The Noosaville data is taken from the SILO data drill and as
November 116.1 99.1 239.8
such is interpolated. The coordinates of this rainfall location
have been approximated to the western bank of Lake Weyba
December 160.7 147.4 355.9
(i.e. the site location).
16 AGRICULTURE WATER ENVIRONMENT
Page 18
www.ac ss.gs +GILEEHI
SUT1-ERJ.AN)
Table 6.1.5 Annual rainfall statistical summary Table 6.2.2 Daily usage2
(mm)Eumundi-Crescent Road Daily usage I
I Eumundi-Crescent Road rainfall statistics Toilet, bath & shower 21.1 (Iitres/person/day)
Period 1898-2012 Irrigation 18.6 (Iitres/person/day)
Average 1,535.5 Clothes washing 30 (I it res/person/day)
Median 1,576.4 Total daily usage 69.7 (Iitres/person/day)
Standard deviation 593.1 Total 198 litres/household/day
total from rainwater tank
95% 2,327.9
75% 1,908.5 The total tank inflow (A)is equal to the total
25% 1,240.8 rainfall over the roof area multiplied by the roof
5% 156.1 runoff coefficient of 0.9. The volume of spill (8)is
equal to the volume of inflow exceeding the tank
volume i.e. the spill is equal to the tank volume
Table 6.1.6 Monthly rainfall statistical summary
from the end of the previous time-step plus the
(mm)Eumundi-Crescent Road
inflow, less the demand from the current time-
I Month Average I Median 95%
step. The demand (outdoor and domestic) (D)is
January 214.7 165.4 614.0 supplied in the first instance from tank supply (C)
and if required, supplemented from the municipal
February 228.4 198.0 581.4
potable supply system (E).
March 221.4 169.7 530.9
April 142.6 113.4 408.8 The rainwater tank balance model configuration is
presented in Figure 6.2.1.
May 123.8 109.9 322.7
June 92.8 62.5 259.1
July 71.5 49.5 225.6
August 53.7 33.7 128.6
September 52.6 38.0 148.0
Potabte
October 87.4 73.5 235.1 Supplemented
demand
u
November 109.1 86.8 271.4 Spitt
December 154.2 129.1 365.7
6.2 Rainwater tank assessment [Domestic + Outdoor use)
A daily rainwater tank balance was assessed
Figure 6.2.1 Rainwater tank balance model
under the assumptions outlined in Tables 6.2.1 configuration
and 6.2.2.
The following equations provide a summary:
Table 6.2.1 Assumptions used in assessment of
(A)Roof Inflow (8)Spill (C)Total available for
-
=
daily rainwater tank balance
use (assuming the tank is empty at the start of the
I Daily rainwater tank balance water balance calculation).
Roof area 100m2
Roof runoff coefficient 0.9
(D)Demand (C)Rain tank supply
-
=
(E)Potable
supplemented demand
Initial tank volume o kL
Density 2.84 persons/dwelling 2
Gold Coast Domestic Water End Use Study (Willis, R et. AI)
(2009).
1 0838_IWCM_RS2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PTY LTO _
IWCM 17
Page 19
www.ac ss.gs
+GILBERI
SlJT1-ERI.
Different tank sizes were assessed for each of the inflow
rainfall data sets reviewed in section 6.1 and for
(8)Less spill 85,785 81,229 76,268
the assumptions presented in tables 6.2.1 and
(C)Total
6.2.2. A summary of these assessments is 53,004 57,542 62,460
available for use
presented in Tables 6.2.3, 6.2.4 and 6.2.5. The
rainfall tank assessment is based on the daily (D)Demand 72,301 72,301 72,301
data for each location and has been modelled on (E)Potable
a daily time-step. supplemented 19,255 14,716 9,799
demand
Table 6.2.3 Average annual rainfall balance for
Noosaville (SILO)
6.3 Precinct approach -
total catchment
I Noosaville rainfall capture and reuse
3kL Tank 5kL Tank 10kL
Annual Total (L) A catchment scale rainfall tank assessment was
Tank
undertaken to determine the total rainfall capture
(A)Total rainfall and re-use for the site. This forms part of the
156,204 156,204 156,204
inflow
preliminary planning process of integrated water
(8)Less spill 95,933 91,730 87,289 cycle management for Noosa on Weyba. The
rainfall tank assessment is based on the daily
(C)Total
60,247 64,434 68,915
available for use rainfall data assumed for the development area
and has been modelled on a daily time-step. The
(D)Demand 72,301 72,301 72,301
rainfall assessment has been based on the
(E)Potable
proposed land use precinct planning presented in
supplemented 12,051 7,864 3,464
demand
Figure A2 in Appendix 1.
Table 6.2.4 Average annual rainwater tank The assessment for each of the precincts (with
balances for Tewantin RSL park rainfall station the exception of Precincts C and E(b)), has been
based on the assumption of one (1)freestanding
I Tewantin RSL Park
tank per dwelling. For Precinct C, the connected
3kL Tank 5kL Tank 10kL
Annual Total (L) roof area of the apartment buildings has been
Tank
based on an assumption of four (4), three-storey
(A)Rainfall
145,007 145,007 145,007 buildings of 12 or 13 units in each block. The
inflow
mixed-use would comprise retail/commercial
(8)Less spill 86,304 81,633 76,371
space on the ground floor of each block and on
(C)Total the apartments above. The roof area for tank
58,515 63,061 68,011
available for use inflow has been calculated on 7 apartments per
level with individual floor areas of 80m2 giving a
(D)Demand 72,301 72,301 72,301
total roof area of 560m2 per building. Each
(E)Potable
apartment building within Precinct C has been
supplemented 13,600 9,054 4,104
assessed on the assumption of using three (3)
demand
10kL rainwater tanks.
Table 6.2.5 Average annual rainwater tanks The assumptions for the various analyses are
balance for Eumundi-Crescent Road rainfall station presented in Tables 6.3.1. 6.3.2 and 6.3.3 and
I Eumundi-Crescent Road present the results of the annual average rainfall
tank performance by precinct using data from the
3kL Tank 5kL Tank 10kL
Annual Total (L) Noosaville and Tewantin RSL Park rainfall
Tank
stations.
(A)Rainfall 138,816 138,816 138,816
18 AGRICULTURE WATER ENVIRONMENT
Page 20
www.ac ss.gs +GILEEHI
SUT1-ERJ.AN)
... - - -
.. . .. .. . .. . .
Demands
Roof area
(LIe/day) :
No. Roof areal draining to Total roof
Toilet No. of No of
persons dwelling, tank & % area
cisterns / Precinct dwelling layout tanks
/ unit or roof area draining to
Garden units and size
dwelling building draining to tanks
Irrigation / tanks
laundry
B -
Premium 1 per
21.1/28.6/ Freestanding 125m2
2.84 residential 73 unit 250m2 8,750m2
30.4 units (50%)
lots 10,000l
4 x 3-storey
buildings
3 per
Grnd lev- 280m2/3
21.1/0.0/ c- retail building 7x80m2 =
93.3m2
1.70 50
560m2
=
1,120m2
30.0 Apartments 10,000l
lev 1 -
res
(50%)
each
lev 2 -
res
0-
1 per
21.1/8.6/ Townhouses Freestanding 60m2
2 83 unit 60m2 4,680m2
30.0 (assumed units (100%)
10,000l
duplexes)
E (a)- 1 per
21.1/8.6/ Freestanding 80m2
1.7 Retirement 84 unit 80m2 5,520m2
30.0 units (100%)
cottages 10,000l
3 per
E (b)-Aged 540m2 540/(2x3)
21.1/8.6/ 4 x 9-unit block
90m2 1,080m2
30.0
1.7 care 36
blocks (60m2per =
10,000l
apartments unit) (50%)
each
F Standard 1 per
21.1/18.6/
-
125m2
2.84 residential 40 Freestanding unit 250m2 5,000m2
30.0 (50%)
lots 10,000l
G-
1 per
21.1/18.6/ Standard 125m2
2.84 124 Freestanding unit 250m2 15,375m2
30.0 residential (50%)
lots 10,000l
H (a)-
1 per
21.1/18.6/ Standard 125m2
2.84 52 Freestanding unit 250m2 6,375m2
30.0 residential (50%)
lots 10,000l
1 per
21.1/8.6/ H (b)- 60m2
2 24 Freestanding unit 60m2 1,380m2
30.0 Townhouses (100%)
10,000l
1- Standard 1 per
21.1/18.6/ 125m2
2.84 residential 203 Freestanding unit 250m2 25,250m2
30.0 (50%)
lots 10,000l
L- 1 per
21.1/8.6/ 80m2
1.7 Retirement 100 Freestanding unit 80m2 5,280m2
30.0 (100%)
villas 10,000l
1 0838_IWCM_RS2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PTY LTO _
IWCM 19
Page 21
www.ac ss.gs
+GILBERI
SlJT1-ERI.
Table 6.3.2 Summary of average annual rain tank yield by precinct -
Noosaville rainfall data
I Total precinct volumes using Noosaville rainfall data
Total Average Total average Average annual
Average
average annual annual potable %tank demand
Precinct annual Inflow
annual Spill usage from supplemented supplied from
to tanks (kL)
(kL) tanks (kL) demand (kL) tanks
Northbrook Land
(8)73 Premium residential lots 14,254 8,514 5,734 301 95%
(C)50 Apartments (4x 3-storey
1,749 543 1,205 381 76%
apartments)
(D)83 Townhouses 7,779 4,204 3,568 52 98%
(E a) 84 Retirement cottages 10,497 7,379 3,111 2 99%
(E b) 36 Retirement apartments
1,687 598 1,088 246 81%
(4x 9-unti blocks)
(F)40 Standard residential lots 7,810 5,002 2,805 87 97%
(G)124 Standard residential lots 24,212 15,507 8,695 270 97%
Hofmann Land
(H a) 52 Standard residential lots 10,153 6,503 3,646 113 97%
(H b) 24 Townhouses 2,249 1,216 1,032 15 98%
(I) 203 Standard residential lots 39,637 25,386 14,234 442 97%
(L)100 Retirement villas 12,496 8,748 3,704 3 99%
Table 6.3.3 Summary of average annual rain tank yield by precinct -
Tewantin RSL Park rainfall data
I Total precinct volumes using Tewantin RSL Park rainfall data
Total Average Total average Average annual
Average
average annual annual potable %tank demand
Precinct annual Inflow
annual Spill usage from supplemented supplied from
to tanks (kL)
(kL) tanks (kL) demand (kL) tanks
Northbrook Land
(8)73 Premium residential lots 13,232 7,531 5,670 365 94%
(C)50 Apartments (4x 3-storey
1,624 417 1,204 383 76%
apartments)
(D)83 Townhouses 7,222 3,637 3,542 78 98%
(E a) 84 Retirement cottages 9,745 6,600 3,100 13 99%
(E b) 36 Retirement apartments
1,566 467 1,095 240 82%
(4x 9-unit blocks)
(F)40 Standard residential lots 7,251 4,456 2,776 115 96%
(G)124 Standard residential lots 22,477 13,813 8,607 357 96%
Hofmann Land
(H a) 52 Standard residential lots 9,426 5,793 3,609 150 96%
(H b) 24 Townhouses 2,088 1,052 1,024 22 98%
(I) 203 Standard residential lots 36,796 22,614 14,090 584 96%
(L)100 Retirement villas 11,601 7,857 3,690 16 99%
20 AGRICULTURE WATER ENVIRONMENT
Page 22
www.ac ss.gs +GILEEHI
SUT1-ERJ.AN)
with a net contributing roof area of 100m2,
7 Conclusions
indicated substantial demand off-set potential for
rain tanks of 10kL capacity, and this tank size was
then selected for the assessment of the overall
Three factors govern the development of the
IWCM Plan for Noosa on Weyba: precinct scale demand off-set.
The high rainfall; It was determined from the precinct analyses that
a 10kL rain tank configuration could supply
Limited opportunities for open space irrigation
due to soil, groundwater and space limitations;
approximately 96% of the standard residential
household demands for toilet cisterns, garden
and
irrigation and laundry use. This in turn represents
Access to both the potable water supply
approximately 25-30% of the total household
network and the Noosaville STP.
demand, representing a significant, sustained off-
set from the bulk water supply system serving the
These issues pose both problems and solutions
Noosa area.
for IWCM, providing a sustainable supply through
rainfall harvesting, but being problematic for the The apartment blocks and townhouse complexes
sustained irrigation or domestic re-use from the were modeled with communal tank systems and
effluent streams (harvested rainwater, treated the performance of these could be improved once
wastewater and stormwater). the space constraints for tanks is known. The
reticulation would however serve each residence
The provisional clarification that the augmentation
equally.
to the Noosaville STP might proceed on a
schedule allowing for receipt of sewage from A provisional residential tank configuration is
Noosa on Weyba, and the results of the soil and presented in Figure C2 in Appendix 1, designed to
groundwater investigations all-but precluding combine two 5kL tanks into a functional 10kL unit,
sustained open space irrigation, meant the focus also providing an important retention and through-
of the IWCM investigations was primarily on the flow barrier for improving the quality of stormwater
IWCM Option 4, comprising rainwater harvesting, runoff.
both to maximize the off-set of potable demands
The rainwater harvesting strategy lends itself to
from the municipal supply network and to improve
the quality of stormwater runoff. cost-effective, staged development across the
estate and minimizes the need for dual-pipe
The analysis of the rainfall data available for the reticulation and control systems. It should be
Tewantin RSL Park, Eumundi-Crescent Road and developed in conjunction with bio-retention swales
Noosaville sites indicated mean annual rainfall in and basins, treating stormwater runoff prior to
the range from 1500mm/a to 1700mm/a. A discharge to the creeks.
rainwater balance for a typically sized residence
1 0838_IWCM_RS2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PTY LTO _
IWCM 21
Page 23
www.ac ss.gs
+GILBERI
SlJT1-ERI.
8 Recommendations
An IWCM Plan based on Option 4, comprising
rainwater harvesting with bio-retention swales and
basins, is recommended for the Noosa on Weyba
development. This option offers cost-effective and
sustainable yields for domestic use of rainwater
and significantly improves stormwater runoff
quality.
In the event that a connection to the Noosaville
STP is unavailable, detailed investigation of on-
site sewage treatment package plants and effluent
disposal options would be required.
22 AGRICULTURE WATER ENVIRONMENT
Page 24
www.ac ss.gs +GILEEHI
SUT1-ERJ.AN)
is made in good faith and on the basis that the
9 Limitations of reporting
authors, Gilbert & Sutherland Pty Ltd, their agents
or employees are not liable (whether by reason of
lack of care or otherwise) to any person for any
Gilbert & Sutherland Pty Ltd has made every
effort to ensure that the information contained in damage or loss whatsoever which has occurred or
this report is accurate. The interpretation of may occur in relation to that person taking or not
scientific data, however, often involves both
taking (as the case may be) action in respect of
any representation, statement or advice referred
professional and subjective judgments and as
to above.
such is open to error.
In recognising the potential for errors in scientific
Furthermore, this information should not be relied
upon by any persons other than the client, or the
interpretation, Gilbert & Sutherland Pty Ltd does
relevant statutory authority determining the client’s
not guarantee that the information is totally
accurate or complete and clients are advised not
application, for whom it has been compiled. This
information reflects the specific brief and the
to rely solely on this information when making
commercial decisions. Any representation,
budget of the client concerned, who enjoys an
individual tolerance of risk.
statement, opinion or advice, expressed or implied
1 0838_IWCM_RS2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PTY LTO _
IWCM 23
Page 25
www.ac
+GILtERI
ss.gs
SUT1-ERJ.AN)
10 Appendix 1 -
Figures
1 0838_IWCM_RS2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PTY LTO _
IWCM 25
Page 26
.!lI11 800 1’..11111 16001 Brisbane Sydney Melbourne and regions
SCALE metres
A
ORIENTATION
NORTH
LEGEND
Agriculture. Water. Environment.
_ Proposed development area
_ Biodiversity agreement
offset area
SOURCES
Image base:
Google Earth Pro, 21 June 2012
Investigation and biodiversity offset areas:
Queensland Government Gazette No.27, Growth
Management Queensland, Map 1 Noosa on
-
Weyba Biodiversity Development Offset Area,
Declaration Area, 3 February 2011
PROJECT
NOOSA ON WEYBA
QUEENSLAND
CLIENT
NORTHBROOK
CORPORATION
DRAWING
SITE LOCATION
AND LOT PLAN
SCALE DRAWN CHECKED
1:32000@A3 SPD RSH
ROBINA
DATE PROJECT NO DRAWING NO
PO Box 4115 Robina QLD4230 0755789944 20/07/2012 10838 FigureA1
Email [email protected] www.access.gs
Page 27
’I’, .’
,_.
~ ,-+. .
....;
. ’/
/’;~’~"~. ~,.’:.
\: "~~.~
". I. 1
,
,,~~.,’., .
,1./.’ ~~\
t"" \.’,
" .
.
..
"1’
.., ," ,.
-.,:.:,"
,,’,
. ’
...
....
." ’I..~:::< :.,-~\:.;’ \’-\~’\. "~.i.~~.
,
:I... ’:;t\,;.C"~1. ~.’h,i.:
;,’ 4 ’t’,":’;.;.~";’’’:’~~’t~~~\
".’10 d,"I’M ~,~~""
.
. .
.\
,
.~~< V:. "’\ ~’;~,’v..~~.’~~:,t~;(~’\’.~~’~:.~.. :~.~~~~
.
,
"’_",.
.~
"
....
_,:~’.~~..~~t~t’’7’’~"l,...,.
" ,},.~~.t.
.’f,
,.:. ...., ’"_ ",
"l:’~’"~"~:--~,,,#~~~,~~"" ,.’: "’~).~.’,.,’, \._
:’ft~~:~t~\~’1~t
.
;.,.(...l’.l;t.’~’-’.;....
’\.4." l
l:’\~(. ....~:
:’.’, -. ’.: .
-..
;
. \
...._. ’.:’" .,.
.
’:. .:
.
"
-J .-.
~.
~’,~.’_"~.~~~~’.~’r~~i
’,;4. ::1.
’:~~~’\_.
.",’:’ _
L.
.
.
.... ’," ,
(’.
A LEGEND SOURCES PROJECT CLIENT DRAWING Brisbane Sydney Melbourne and regions
ORIENTATION
NORTH ==Proposed development boundary
area Image base:
Google Earth Pro 2012, imagery date 15 December 2006
NOOSA-ON-WEYBA NORTH BROOK MASTERPLAN
CORPORATION PRECINCTS WITH
SCALE
_1111. 200M)1’1’ 400-’1’1’ 6001
..Biodiversityoffset
agreement boundary
area Layout:
MLDESIGN, Noosa on Weyba, Structure Plan, drawing No. MP-005-[D]
PTY LTD RAINFALL HARVESTING
melres
STORAGE
BRISBANE
GPO Box 9856 Brisbane QLD4001 0738523999 SCALE DATE DRAWN CHECKED PROJECT NO DRAWING NO
Email [email protected] www.access.gs 1:12500@A3 24/08/2012 SPD/AAK RHS 10838 Figure A2 Agriculture. Water. Environment.
Page 28
v
f f I V
^
v I
I f I v
^ ^
v I
I v
I I
^
v I
f I I v
v I
f f I v
^
v I
I f I v
v I
f f I v
^
f
v
~
I ~ Potable town water used
v for most indoor uses
I
I v
^ ^
v I
I v
I I
^ ^
v I
I v
I I Roof water
v I
f f I Recycled water v
used to irrigate open I
f f ~........~........~ space and park areas ------f On-site rainwater storage tank v
I
^
I f ........~~~ ^
plumbed for toilet flushing, laundry and
trickle top-up from town mains
v
I
^
I
^
I
~........~~ ^
~
^ ........~........~ I I
f I ~-~ f
v
-_,. I
f f -~-~-1~ v
^
I
I f Recycled -~~-~ 1 I <-<-<-<-<-<-<-<-<-<-<-<-<-<-<-<~
v
v
f f water returned
___J~-~ -_,.
^
I I
to houses for outdoor uses
f f -~-~ ^
v
~_~ I I
v
f f -^
I.. Wastewater
^ v
I f I
^ v
Overflow
I
f
f
~<-<-<<-
I
On-site sewage
treatment plant -<-<-<-<-<-<-<-<-<-<-<-<~
I
v
I
Bioretention pond
f Pump
station
f
f ’0"
f Infiltration
Ii
^
I to groundwater v
^
I v
Excess flow
f to creek
f I
^
Managed
f I Urban irrigation, release
^
~ to creek
I creek restoration I storage
^
I f
^
f I
f f
t<_<_<_<_<_<_<_<_<_<_<_<_<_<_<_<_<_<~
Harvested stormwater
treatment plant
to supplement RW supply
,< < < < < < < < <
^
b < < < < < < < < < ,,< < < < < < < < < < < < < < < < < c ,< < < < < < ,< < <
cO
Pump
station
BRISBANE LEGEND SOURCES PROJECT CLIENT DRAWING Brisbane Sydney Melbourne and regions
GPO box 9856 Brisbane OLD 4001 NOOSA-ON-WEYBA NORTH BROOK TOTAL WATER CYCLE
Email [email protected]
0738523999 CORPORATION MANAGEMENT
PTY LTD OPTION 1
www.access.gs
SCALE DATE DRAWN CHECKED PROJECT NO DRAWING NO
Not to scale 20/07/2012 SPD RHS 10838 Figure B1 Agriculture.Water.Environment.
Page 29
Recycled
water
reservoir
(Class A+)
v
~ V
I
^ v I
v
I I
^
I
v
I
J
^
I
v
I
J
^ v I
v
I I
^ v I
v
I I
^ v I
v
I I
^ v I
v
I I Potable town water used
v I
v for most indoor uses
I
v
I
^ v I
v
I I
^
I
v
I
J
v I
~ v
~ Recycled
water returned
I
~ ~
-..._"
v
for outdoor uses
~ -..._"
-..._"
J
-..._" I
^ ~
-..._" v
I
^
~
~
~ J
I -..._" ^
........~~ I I
~ ~ ^
v
-"’_".J J
~ Recycled water returned I
_y_" ~-..._"-"’_"-..._"
-...
^ to houses for outdoor
v J <-<-<-<-<-<-<-<-<-<-<-<-<-<-<-<-<~
I I I Bioretention
uses, laundry and toilet flushing v
v
swale
~ ~
~........~ ^ ^ J ~Roofwater
~ ___> _> ..L> _> _.J
J I
v
~ I
v
Wastewater -------.I ~ Overflow
~<-<--<-< On-site sewage
treatment plant
for development
<-<-<-<--<-<-<-<-<-<-<-<-<~
v
v
I
~
~
~
~
Overflow
Bioretention pond Watercourse
Pump
station ~
~
1 ~
~
~
~
"
Communal
0-
Infiltration
to groundwater
rainwater
Excess flow
storage tank
to creek
Rainwater used for:
urban irrigation,
creek restoraration/storage
BRISBANE LEGEND SOURCES PROJECT CLIENT DRAWING Brisbane Sydney Melbourne and regions
GPO box 9856 Brisbane OLD 4001 NOOSA-ON-WEYBA NORTH BROOK TOTAL WATER CYCLE
Email [email protected]
0738523999 CORPORATION MANAGEMENT
PTY LTD OPTION 2
www.access.gs
SCALE DATE DRAWN CHECKED PROJECT NO DRAWING NO
Not to scale 20/07/2012 SPD RHS 10838 Figure 62 Agriculture.Water.Environment.
Page 30
Recycled
water Town
reservoir water
(Class A) supply
v
v
I
^
I
v
I
J
v I
1 I
v
v I
1 I
v
1
v
J
I
^ v I
v
I I
v I
1 I
v
I
v
1 I
v
Potable town water used
v
~ for most indoor uses
I I
J
v I
1 I
v
v I
1 J Roof water v
I
1 ~-
Recycled v
water returned
^ J
I ~~-.. for outdoor uses On-site rainwater storage tank
^
I
~~........ plumbed for toilet flushing, laundry and J
~~- trickle top-up from town mains I
1 ~-~- ^
v
I I
1 ~~-.. v
^ ~.......~....... f J
I "’- ^
"’-"’_"J... ^
I
1 "’-..._,. L<_<_ <-<-<-<-<-<-<-<-<-<-<-<-<-<-<-<~
v
Recycled -", ^
1 water returned -""’-", I
to houses for outdoor uses ____j -..~ ^
1 ~~ I
I
v
^ ~_>_>___ft.. I
I Vi
^
I I
v
^
Wastewater Overflow
v
~<-<-<-<-<-< On-site sewage
treatment plant
for development
<_<_<_<_<_<_<_<_<_<_<J
I
v
Bioretention pond Watercourse
Pump
station
1 V"
Infiltration
to groundwater
I
Excess flow
to creek
Managed
release
to creek
BRISBANE LEGEND SOURCES PROJECT CLIENT DRAWING Brisbane Sydney Melbourne and regions
GPO box 9856 Brisbane OLD 4001 NOOSA-ON-WEYBA NORTH BROOK TOTAL WATER CYCLE
Email [email protected]
0738523999 CORPORATION MANAGEMENT
PTY LTD OPTION 3
www.access.gs
SCALE DATE DRAWN CHECKED PROJECT NO DRAWING NO
Not to scale 20/076/2012 SPD RHS 10838 Figure B3 Agriculture.Water.Environment.
Page 31
Town
water
supply
v
I
v
I
v
I
v
I
v
I
v
I
v
I
v
Potable town water used
J for most indoor uses
I
v
I
v
I
Roof water v
I
v
I
On-site rainwater storage tank v
I
plumbed for toilet flushing, laundry and v
trickle top-up from town mains I
v
I
v
Tank overflow
I
v
^
I
v
1 L<_<_<_<_<_<_ <-<-<-<-<-<-<-<-<-<-<-<-<-<-<-<~
v
1
v
I" Development sewage
v
Overflow
~
Off-site
municipal <-<-<-<-<-<-<-<-C:lJ
Municipal
sewage
Bioretention pond
Harvested storm water
storage tank or dam
sewage treatment plant Main pump station
in development
v V’
V
V
1
1
I
I nfi Itration
to groundwater
1
Sewage effluent
to creek Managed
release
to creek
BRISBANE LEGEND SOURCES PROJECT CLIENT DRAWING Brisbane Sydney Melbourne and regions
GPO box 9856 Brisbane OLD 4001 NOOSA-ON-WEYBA NORTH BROOK TOTAL WATER CYCLE
Email [email protected]
0738523999 CORPORATION MANAGEMENT
PTY LTD OPTION 4
www.access.gs
SCALE DATE DRAWN CHECKED PROJECT NO DRAWING NO
Not to scale 20/07/2012 SPD RHS 10838 Figure B4 Agriculture.Water.Environment.
Page 32
601 Brisbane Sydney Melbourne and regions
A
ORIENTATION
NORTH
LEGEND
Agriculture. Water.
Environment.
a Rainfall station locations
aSewage plants (STP)
treatment
K:I Water treatment
plant (WTP)
a Main localities
_ Proposed development area
_ Bodiversity offset area
SOURCES
Image base: Google Earth Pro 2012
PROJECT
NOOSA-ON-WEYBA
CLIENT
NORTHBROOKE
CORPORATION
PTY LTD
DRAWING
RAINFALL STATION
AND STP LOCATIONS
FOR IWCM
SCALE DRAWN CHECKED
1 :125 000@A3 SPD RHS
ROBINA
DATE PROJECT NO DRAWING NO
PO Box 4115 Robina QLD4230 0755789944 20/07/2012 10838 Figure C1
Email [email protected] www.access.gs
Page 33
Roof
drainage
~~j First-flush
Sieve
\l \l
Sieve
’.
Overflow
-
sump
House
supply
,;.~-)
5000 L 5000 L
I
_j_
----,---, Gound
1’<:’. :.~’:::;\i’:), :,"/.’.’::r,-".:"’::~:",~>:.. ;~:.: !..;..; ’,;’.:.’;-;:.’,- .. ,"_
,t ./’0’\
.
.’.....;
"’,’ ~
"""’,
Pump Level
I I
ABOVE GROUND RAINWATER STORAGE TANK To
Tank type and dimensions to be confirmed with manufacturer and site constraints
-----=-..stormwater
system
Roof House
drainage supply
! 1 Gound
Level
Overflow To
~stormwater
First-flush
system
sump
5000 L 5000 L
’:’
.-.: :’:,3;’;.’,j",:; .:r,
.
.
~); ":.<:t;..::~: ’:- :-. ,-’~,-’i:. !_.-// ~:.::-\ :’~-::
UNDERGROUND RAINWATER STORAGE TANK
Tank type and dimensions to be confirmed with manufacturer and site constraints
PROJECT CLIENT DRAWING Brisbane Sydney Melbourne and regions
NOOSA-ON-WEYBA NORTH BROOK RAINWATER
CORPORATION STORAGE TANKS
PTY LTD
SCALE DATE DRAWN CHECKED PROJECT NO DRAWING NO
Not to scale 20/07/2012 SPD RHS 10838 Figure C2 Agriculture.Water.Environment.
Page 34
www.ac
+GILtERI
ss.gs
SUT1-ERJ.AN)
11 Appendix 2 -
Summary of IWCM options
1 0838_IWCM_RS2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PTY LTO _
IWCM 27
Page 35
+GILEERI
SlJT1-ERlAN)
Summary of key elements of the IWCM Options:
Rain tanks
Local sewage treatment (on-site) Rain tanks (domestic) Bioretention Stormwater
Municipal (communal) swales & harvesting &
sewage basins treatment
External Internal
treatment
Open Open space All irrigation Internal use (treating (open-space
use and Open space
(off-site) space irrigation + + domestic (cisterns and stormwater and domestic
(garden external irrigation
irrigation domestic internal use laundry) runoff) irrigation)
irrigation) use
Option
1
.I .I .I .I
Option
.I .I .I
2
Option
.I .I .I
3
Option
.I .I .I
4
28 AGRICULTURE WATER ENVIRONMENT
Used in these records
Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 23.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.