with a net contributing roof area of 100m2,
7 Conclusions
indicated substantial demand off-set potential for
rain tanks of 10kL capacity, and this tank size was
then selected for the assessment of the overall
Three factors govern the development of the
IWCM Plan for Noosa on Weyba: precinct scale demand off-set.
The high rainfall; It was determined from the precinct analyses that
a 10kL rain tank configuration could supply
Limited opportunities for open space irrigation
due to soil, groundwater and space limitations;
approximately 96% of the standard residential
household demands for toilet cisterns, garden
and
irrigation and laundry use. This in turn represents
Access to both the potable water supply
approximately 25-30% of the total household
network and the Noosaville STP.
demand, representing a significant, sustained off-
set from the bulk water supply system serving the
These issues pose both problems and solutions
Noosa area.
for IWCM, providing a sustainable supply through
rainfall harvesting, but being problematic for the The apartment blocks and townhouse complexes
sustained irrigation or domestic re-use from the were modeled with communal tank systems and
effluent streams (harvested rainwater, treated the performance of these could be improved once
wastewater and stormwater). the space constraints for tanks is known. The
reticulation would however serve each residence
The provisional clarification that the augmentation
equally.
to the Noosaville STP might proceed on a
schedule allowing for receipt of sewage from A provisional residential tank configuration is
Noosa on Weyba, and the results of the soil and presented in Figure C2 in Appendix 1, designed to
groundwater investigations all-but precluding combine two 5kL tanks into a functional 10kL unit,
sustained open space irrigation, meant the focus also providing an important retention and through-
of the IWCM investigations was primarily on the flow barrier for improving the quality of stormwater
IWCM Option 4, comprising rainwater harvesting, runoff.
both to maximize the off-set of potable demands
The rainwater harvesting strategy lends itself to
from the municipal supply network and to improve
the quality of stormwater runoff. cost-effective, staged development across the
estate and minimizes the need for dual-pipe
The analysis of the rainfall data available for the reticulation and control systems. It should be
Tewantin RSL Park, Eumundi-Crescent Road and developed in conjunction with bio-retention swales
Noosaville sites indicated mean annual rainfall in and basins, treating stormwater runoff prior to
the range from 1500mm/a to 1700mm/a. A discharge to the creeks.
rainwater balance for a typically sized residence
1 0838_IWCM_RS2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PTY LTO _
IWCM 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 23.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.