Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12/0208

Plans and drawings: the text below has words only, no drawings.

Very large file (23.8 MB): may take a few minutes to open.

Log in to see the plans as drawn
www.ac    ss.gs                                                                          +GILEEHI
                                                                                       SUT1-ERJ.AN)



                                                      with a net contributing roof area of 100m2,
7        Conclusions
                                                      indicated substantial demand off-set potential for
                                                      rain tanks of 10kL capacity, and this tank size was
                                                      then selected for the assessment of the overall
Three factors govern the development of the
IWCM Plan for Noosa on Weyba:                         precinct scale demand off-set.

    The high rainfall;                                It was determined from the precinct analyses that
                                                      a 10kL rain tank  configuration could supply
    Limited opportunities for open space irrigation
    due to soil, groundwater and space limitations;
                                                      approximately 96% of the standard residential
                                                      household demands for toilet cisterns, garden
    and
                                                      irrigation and laundry use. This in turn represents
    Access to both the potable water supply
                                                      approximately 25-30% of the total household
    network and the Noosaville STP.
                                                      demand, representing a significant, sustained off-
                                                      set from the bulk water supply system serving the
These issues pose both problems and solutions
                                                      Noosa area.
for IWCM, providing a sustainable supply through
rainfall harvesting, but being problematic for the    The apartment blocks and townhouse complexes
sustained irrigation or domestic re-use from the      were modeled   with communal tank systems and
effluent streams (harvested rainwater, treated        the performance of these could be improved once
wastewater and stormwater).                           the space constraints for tanks is known. The
                                                      reticulation would however serve each residence
The provisional clarification that the augmentation
                                                      equally.
to the Noosaville STP might proceed on a

schedule allowing for receipt of sewage from          A provisional residential tank configuration is
Noosa on Weyba, and the results of the soil and       presented in Figure C2 in Appendix 1, designed to
groundwater investigations all-but precluding         combine two 5kL tanks into a functional 10kL unit,
sustained open space irrigation, meant the focus      also providing an important retention and through-
of the IWCM investigations was primarily on the       flow barrier for improving the quality of stormwater
IWCM Option 4, comprising rainwater harvesting,       runoff.
both to maximize the off-set of potable demands
                                                      The rainwater harvesting strategy lends itself to
from the municipal supply network and to improve
the quality of stormwater runoff.                     cost-effective, staged development across the
                                                      estate and minimizes the need for dual-pipe
The analysis of the rainfall data available for the   reticulation and control systems. It should be
Tewantin RSL Park, Eumundi-Crescent Road and          developed in conjunction with bio-retention swales
Noosaville sites indicated mean annual rainfall in    and basins, treating stormwater runoff prior to
the range from 1500mm/a to 1700mm/a. A                discharge to the creeks.
rainwater balance for a typically sized residence




1 0838_IWCM_RS2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PTY LTO   _
                                                                              IWCM                        21

Used in these records

About this file

File size
23.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12_0208.pdf · 23.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.