Original source · versioned page text
fc Noosaville Exchange & rt
4 l 2 l 3 4 I 2 6
\ GENERAL NOTES:
rr” 4 4 4 7 4 4 4 1 GENERAL
N ° XN G1. THIS DRAWING TO BE READ IN CONJUNCTION WITH SITE-SPECIFIC DRAWINGS.
/-2— / ——/
/2—/ +—/
ey Bee PEDESTAL'A’.
3 | oo REFER DETAIL
At cH
i t
;
S \
MOON FOOT
PLATFORM. PEDESTAL 'B'
REFER SHEET T2-1 REFER DETAIL I
4 f 4 f f 7 4 f f f
TYPICAL COMPOUND - PLAN VIEW
SCALE 1:50
1000 MOUNTING POLE CAST INTO FOOTING
N12 x 450 LONG INSERTED THROUGH
CHS TO PREVENT MAST ROTATION
MASS CONCRETE FOOTING
CN V aw
450
PEDESTAL 'A' - PLAN VIEW
SCALE 1:25
610 NOM.
(600 MIN., 615 MAX)
6 HOLD-DOWN BOLTS TO BE
CHEMICALLY SET INTO TOP OF
PEDESTAL AT TIME OF ACTIVE KIT
INSTALLATION
Y/Y SL72 MESH (ALL SIDES)
| __e
[—— CONCRETE PEDESTAL
ORIENTATE HOLD-DOWN BOLTS
= TO BE PARALLEL WITH UNISTRUT
L
>
s UNISTRUT (REFER SITE LAYOUT)
to
25 MIN.
2
PEDESTAL 'B' - PLAN VIEW
SCALE 1:10
3050
1650
MOUNTING POLE
168.3 x 7.1 CHS (GR350)
REFER NOTE G6
ZC...
G2. FOR GENERAL CONSTRUCTION & FABRICATION NOTES REFER TO TELSTRA STANDARD A
DRAWING 017866P05.
G3. FOOTINGS TO BE FOUNDED ON UNDISTURBED, NATURALLY CONSOLIDATED SOIL WITH
MINIMUM ALLOWABLE VERTICAL BEARING CAPACITY 100kPa (U.N.O). A SUITABLY
EXPERIENCED PERSON SHALL CONFIRM THE BEARING CAPACITY ON-SITE PRIOR TO
INSTALLING THE CONCRETE/EQUIPMENT. |_|
G4. BASE OF EXCAVATION SHALL BE CLEAN, FLAT & FREE OF SOFT/ORGANIC MATERIAL.
G5. SUBGRADE OF CRUSHED AGGREGATE OR ROAD BASE SHALL BE USED AS NECESSARY
TO ACHIEVE THE BEARING CAPACITY REQUIREMENT.
G6. CONCRETE 5-10mm BELOW TOP OF POLE. ENSURE TOP OF POLE IS WIPED CLEAN.
G7. SAFE WORK PRACTICES SHALL BE IMPLEMENTED IN ACCORDANCE WITH LOCAL
REGULATORY REQUIREMENTS & AS2159-2009. B
CONCRETE
C1. CONCRETE WORKS TO BE COMPETED IN ACCORDANCE WITH AS3600-2018.
C2. CONCRETE STRENGTH TO BE MIN fc = 32MPa AT 28 DAYS.
C3. COVER TO REINFORCEMENT TO BE MIN. 75mm (TYP ALL SIDES).
C4, CAST-IN PROPRIETARY ITEMS TO BE INSTALLED TO MANUFACTURERS —
SPECIFICATIONS.
STEEL
$1, STEELWORK TO BE FABRICATED IN ACCORDANCE WITH AS4100-2020.
$2. ALL STEELWORK TO BE HOT DIP GALVANISED TO AS4680-2006 U.N.O.
$3, ALL HOLLOW SECTIONS TO BE GRADE 350 TO AS1163-2016 U.N.O. Ic
1% FALL TOWARDS EDGES TYP.
COMPOUND GRADE FINISH
EL. 0.0m
1400
175
3
THIS SHEET TO BE READ IN CONJUNCTION WITH SHEET T2-1
SECTION” 7) —— rerennoresca, SECTION e E
SCALE 1:25 NE, 48S SCALE 1:25 NE,
FINISHED GRADE
MASS CONCRETE
FOOTING
BACKFILL MOUNTING —
POLE WITH SL72 MESH (ALL SIDES)
CONCRETE F
L-—_ CONCRETE PEDESTAL
" | E.L. 0.0m
N12 x 450 LONG = FINISHED GRADE
INSERTED THROUGH iH
CHS TO PREVENT
MAST ROTATION REFER NOTES G3,
G4&G5
ORDER
DRAWN | _CHKD.
AMENDMENT
FOR CONSTRUCTION
57168
NL | HH |FC-SP30096252WOO94DECON-SATELLITE | RC | IT
Ss —
23.03.23 | 1 €elstra
SATELLITE ACCESS NODE SITE 182703}
NOOSAVILLE EXCHANGE & RT
CONCRETE FOUNDATION DETAILS FI
88 GOODCHAP STREET, NOOSAVILLE, QLD 4566
©elstra Corporation Limited ABN 33 051 775556. All rights reserved
we Q757168 jie”
1
| 2 3
iW
7
I 5 Cad fle: Q757 168.dwg A3
The copyright and cumership of tis drawing assigned i Telstra and must not be copied or saved elsewhere without writen permission from Tals,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.