Stormwater Management Plan · MCU22/0058

of 28

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 8, section 1. The text section number identifies this passage in the reader.

                                            Figure 3.2 – DRAINS Pre-development catchment




                                           Figure 3.3 – DRAINS Post-development catchments




                                       Figure 3.4 – DRAINS Split Post-development catchments


The results of the modelling against the range of design storms for the development under the existing and
proposed development conditions are shown in Table 3.1 Existing and proposed unmitigated site peak discharge
rates.
                              Table 3.1 Existing and proposed unmitigated site peak discharge rates

                                                                        Wyandra Street
                                                                                                         Qchange
                                           A.E.P                Qexisting      Qproposed    Qchange       (%)
                                                                (m³/s)         (m³/s)       (m³/s)
                                             1EY                 0.016          0.018        0.002        13%
                                            50%                  0.019          0.021       0.002         11%
                                           0.2 EY                0.028          0.031       0.003         11%
                                            10%                  0.036          0.036          0           0%
                                             5%                  0.041          0.041          0           0%
                                             2%                  0.047          0.047          0           0%
                                             1%                  0.051          0.052       0.001          2%



As expected, the site has increased the total peak flows from the site for a number of storm events. Attenuation will
be required to mitigate the outflows to ensure that the development does not exceed the predevelopment levels to
Project number 20220078
File RECOR Preliminary Stormwater Management Report - 20220078.docx, 2022-03-29                                      Page 8 of 15
Revision 0


P +61 7 5211 1003                          A 37 Mary St, Noosaville Qld 4566            E [email protected]    recorconsulting.com

Used in these records

About this file

File size
3.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stormwater Management Plan.pdf · 3.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.