Figure 3.2 – DRAINS Pre-development catchment
Figure 3.3 – DRAINS Post-development catchments
Figure 3.4 – DRAINS Split Post-development catchments
The results of the modelling against the range of design storms for the development under the existing and
proposed development conditions are shown in Table 3.1 Existing and proposed unmitigated site peak discharge
rates.
Table 3.1 Existing and proposed unmitigated site peak discharge rates
Wyandra Street
Qchange
A.E.P Qexisting Qproposed Qchange (%)
(m³/s) (m³/s) (m³/s)
1EY 0.016 0.018 0.002 13%
50% 0.019 0.021 0.002 11%
0.2 EY 0.028 0.031 0.003 11%
10% 0.036 0.036 0 0%
5% 0.041 0.041 0 0%
2% 0.047 0.047 0 0%
1% 0.051 0.052 0.001 2%
As expected, the site has increased the total peak flows from the site for a number of storm events. Attenuation will
be required to mitigate the outflows to ensure that the development does not exceed the predevelopment levels to
Project number 20220078
File RECOR Preliminary Stormwater Management Report - 20220078.docx, 2022-03-29 Page 8 of 15
Revision 0
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.