10. Appendix G - Landscape Design Concept
BUILDING 03 - refer to Architect's drgs for facade colour / finish BUILDING 04
Building 04 located
site boundary
19m away*
Building 03 parapet located 6m Building 03 parapet
away from Elevation line, refer located 80m away*
drawing LC-02* Pylon sign location & Bicycle
parking, refer Architect's drgs
Building 03 located
98m away* 3.
1. 2.
A ELEVATION A: SOUTHERN ELEVATION
SCALE 1:400 @ A3 Advanced tree planting to car park and site entrance (anticipated tree heights after 10 years growth)
Building 03 parapet BUILDING 03 Building 03 parapet
located 56m away* located 74m away*
Building 03 parapet
located 56m away*
4.
5.
B ELEVATION B: NORTHERN ELEVATION - Environmental Rehabilitation Corridor screens proposed building (anticipated tree heights after 10 years growth)
SCALE 1:400 @ A3
CONCEPT PLAN FOR DA
BUILDING 01
BUILDING 02
Building 02 located 90m away*
BUILDING 03
BUILDING 04 LEGEND:
beyond intervening builtform SITE ENTRY
PROPOSED NATIVE TREE AND
Building 04 located
39m away*
UNDERSTORY PLANTING
EXISTING NATIVE VEGETATION
continues below
RETAINED AND SUPPLEMENTED
WITH ADDITIONAL NATIVE
TUBESTOCK PLANTING
6.
* ALL MEASUREMENTS SHOWN
ON BUILDINGS TAKEN FROM
CORRESPONDING ELEVATION
LINE, REFER DRAWING LC-02
Bike parking
C ELEVATION C: EASTERN ELEVATION - Environmental Rehabilitation Corridors along with advanced native tree planting, screens proposed built form (anticipated tree heights after 10 years growth)
SCALE 1:400 @ A3
NOTES: BUILDING 03 Environmental
1. Advanced trees to carpark medians (1 per 6 car bays) and traffic islands to increase pedestrian comfort. rehabilitation
corridor
High canopy and low groundcover planting to maintain sight lines and passive surveillance opportunities from street Advanced tree planting
2.
to building, as per standard crime prevention through environmental design (CPTED) principles. Building 03 parapet Building 03 parapet creates a vegetative buffer
3. Clear trunked canopy, shade trees to car parking bays to be minimum 100L container stock with non-invasive roots located 116m away* located 13m away*
continues above
or high levels of leaf drop.
4. Existing vegetation retained to assist with screening proposed buildings from Eenie Creek Road.
5. Environmental rehabilitation corridor with all existing endemic vegetation to be retained, all exotic weeds removed
7.
and tubestock planted as per SCRC guidelines. Temporary fencing to be installed through the construction phase.
6. Landmark feature trees to site entry points.
7. Native vegetation that matures at lower levels to provide visual connection and not obscure building tenancy signage.
RARLA GENERALNOTES: PROJECTNAME: NOOSA MARKETPLACE SCALE: 1:400 @ A3
Richard Anderson AILA Hofmann Drive, Noosaville QLD 4566
1. ThisdocumentwaspreparedfortheuseofthenominatedClientonlyandisnottobecopied, CLIENT: Noosa Spotlight Property 2 SHEET: 3 /9
Registered Landscape Architect distributedorreproducedbyanyprocesswithoutthespecificwrittenpermissionofRichardAnderson,
Registration Number 588 DRAWINGTITLE: LANDSCAPE CONCEPT - DRAWN: RA / SC
RegisteredLandscapeArchitect.
38 Marriott Street 2. Dimensionsindicatedondrawingtakeprecedenceoverscalingfromprinteddrawings. LANDSCAPE ELEVATIONS
Coorparoo QLD 4151 DATE: 17/05/2019
3. CAUTION-ThisisaConceptdesignonlyandtheimplementationofanylandscapeworksindicatedon
m: 0412 626211 theConceptdesignmayrequirethemodificationofthedesignand/orsitefeatures. DRAWINGNUMBER: LA072 LC-03 ISSUE: G
e: [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.