Council archive · source document
07/1098 - MCU - Detached House [As Published] · 132007.1098
BNEOLO Ky: Checklist - Applications Involving Land
Development & Land Use Sections
IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
4.41 Form 1 Part A
4.1.1 Ensure that the form is fully completed. /
1.1.2 Inthe case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
1.2. Form Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached.
1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed.
3.1 Ensure that Part G is ; completed if EPA ‘referral i is roared
3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
AFORM CRE jESTHTOLCHANGE;ABRROMAL:
4.1 Ensure that items 1-28 have been checked and/or completed including information regarding
oe res details and owners consent.
5.1 “Ereure 2 that at least 6 cots of the Plan of Development (5 for Reconfiguration ‘and eee /
Works) accompanies the application. In addition ensure that each set is complete.
§.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and Is
unbound.
patent arti
: GRRORTINGINEORMATIONESS 1 east ue ae eta eee ,
6.1.“ Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration
and Operational Works). If the application is accompanied by a covering fetter, ensure that itis x
@ capable of reproduction. x]
6.2 In the case of reports, ensure that 1 of the cova is in an - or A4 format and is unbound.
FERS
Sie Nor ces
7.1 Ensure that the application fee, as nd ‘rom the Council’ S adopted scale of fees,
accompanies the application or has been paid.
4
7.2. Ensure that the fee which has been paid is recorded on the application form. . 4
Receiving Officer
Having completed this form and accepted the.application, please deliver both to the following IDAS Application Receiving
trays:-
« Ifthe application is for a Material Change of Use exclusively -AOP1's desk in the Land Use Section.
« Ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.
« Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.
¢ — Inall other circumstances — AOP1’s desk in the Land Use Section.
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
SEP] g.\ant\forms\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 42 pages
Page 2
gras oe we
* INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006
Rom 1 Davclooent Apeltectiion ides
Common details E /s\
The completion of all applicable questions on Part A is mandatory for ail applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.qid.qov.au.
Any information requested in the form may be provided in an attachment to the appfication, For further information about completing the following details, refer to Guide 4.
Description of land 1. Street address: fnetudinghouse number, street name, suburbfocality name & postcode) (if applicable)
‘Alltand of the application, =
tarde Homer castpten os end [8S aseeRean AACE Moora le }
Cae enya kina ea 2. Name of water body or watercourse, within which the development is proposed: (if applicable)
Advies tor completing 02 - G2 applies it [ |
development is proposed within a water body or
O ‘watecourss. 3. Lot on plan description (eg. Lot 123 on RP 4567) / GPS coordinates:
ae ee eee a [Sea Sse4_ FIPV165504
can be obtained from title documents or through the
focal government. 4. The above description is for: (ck epplicable box)
However, ifthe land on which the development és (1@) the land on which the development is proposed; or
Coa re oti (1 (i) the land adjoining the water body or watercourse, within which the development is
watercourse) provide proposed; or
0 pnigeioatint C1 fili) the water body or watercourse.
© eyelet niet bay |S. Shop/tenancynumber 6. Storey / level: 7. Total area of land: (ne orha
Advice fot pleting Q7 - Q7 does not itthe ’
Gevdonrient is wirin gee body aay | ] [ | \23;2 nat
Fee ee Oe wane tea 8. Local goverment area in which the land is situated: (eg. Esk, Hervey Bay, Woocoe ete.) (if applicable)
Note: Areas below high water mark are pot win a [ TewaANTIN ]
focal government's area unless provided for under the
Local Govamiment Act $993 9. Port authority for the strategic port fand or strategic port land tidal area on which the
Advice for completing Q9 - 9 applies it development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
development is on strategie port land or a strategic
port land fidal area. For more details refer to Guide 11 [ |
Proposal details 40. Existing use of the land: (eg. vacant, single house, shop ete.)
If thera is ingufficient roam avaitabte, dataiis may be
O provided in an attachment to the application. | VACANT 4
41. Proposed use of the land: (eg. 6 unit apartment building, 30 jot residential subdivision, ERA for aquaculture in
ponds with @ totel area of 7 ha for which wastes are released into waters etc). .
NEW HOME Con sTeucTioN |
: Other applicable parts of Form 1 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part I, etc)
Called patty Form For nfometin etc [Attachment |, @ PART © |
when a part of Farm 1 may apply refer to Guide 4,
Applicant detalls 13. Applicantsname: DJ) LEQCch PIL 15. Contact person:
qritwi ron gates hecwe steed [ari-anne _ceach | [mreach
stanton this spat 14. Contact number. 16. Facsimile number/e-mail address:
inten proved cone. The assert (O1 54740996 | fmieadh@higend-net-au]
, any referral agency & the Chief Executive
cnits intomationwhen | 17. Postal address:
[PO _BOx MI2 NOosAvILLe DC aud |
18. Signature: 19. Date:
~ () L271 S-o7
(where applicable) will rely
assessing and d ne
i 4 » .
AS
EWED \-
UN 268 B
eg ™~
FROM we.
&
Page 3
wa
‘ INTEGRATED PLANNING ACT 1997 : Part A, Version 2.4, 29 May 2006
Land owner’s consent (if applicable) 20. Land owner's consent to the making of this application:
Section 3.2.1(3) of the IPA prescribes thet an
explication a contain, or bo supported by, the Name Signature Date
\writlen consent of the tand owners, if the application . NORFOLK ESTATES
involves: (
()._ améterial change of use; Pauie ABN BOS C4STI BBA ooo ec eeeceeeceeeeeefeeeeeeeeeeeee
{@) reconfiguraiion of a lat; -. EMNT Py ud
i) work on land bolow high-water mark & not within 8 ii .
© winateiretecadmcend| | At WUAs402286 |
Management Act 1995:0r .
{¥) work on rait corrider tand defined under the iii
Tansee al 108. © Fag AMO.On. BEANE OF NORFOLK ESTATES:
Section 38, 1(2}(a) of the IPA provides that fw)
landowners consent i jred for 2 mobile o
Cen eee Lr ceceeeeeeed QOVEMONT Pl ence fee neeecenees
For more informiatton refer to Guido 1. : )
‘Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
Section 3.2. 1{5} of the IPA requires evidence of quarry material on State coastal land under the Coastal Protection and Management Act. 1995)?
resource entitlement be given for applications that
involve a prescribed Stata resource. NO - go fe Q24 LAVYES - goto a22
Section 3.2.1(10}{a}(f) of the IPA prescribes thet . Le . .
apricaion pate i tobe property rads 22. This application is accompanied by evidence: (tek appticable box)
eee oe ne (1@) ofthe allocation of, or entitlement to, the resource - attach evidence and go to Q23(vi)
Advics for completing Q2) & 22
Refer to schedule 10 of the integrated Planning Di) the chief executive of the department administering the resource is satisfied the
Regulation 1998 that presctines the nature of evidence | i ‘ nt i -
rogitedty the Staiamn atthe edging ofthis development is consistent with an allocation of, or entitlement to, the resource - go
_ development apptication.
LA dill) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource — go fo Q23
Advice for completing 023 : 23. Evidence of the resource entitlement:
CeO eae P| Gi) Resource entitlement / authority details - (vil) Official stamp of the department
The officia! stamp of the Department of Natural administering the resource (if
Resouroas, Mines and Water s mandatory where the applicable)
application invotves any water oF rivesine Quarry (i) Name of “ae officer .
material under the Water Act 2000.
‘Section 3.2.1(SA) allows the resource manager to Emit
tha time ihe evidence may be used. Q23 {vi) must be 7 if
ithe Is tine frited (ii) Position of seen officer
(iv) Signature of delegated officer
(¥) Date
(vi) rm date of evidence a
Assessment triggers 24. {s the IDAS Assessment Checklist completed and attached to this application?
ee Se tonal Pet eupaerom ook ht my ES Oo NO - the assessment manager may refuse to accept this application on the
must be completed for all other applications. , grounds thet the application has not been properly made
‘Plans / drawings | reports 25. Plans/drawings/reports accompanying this application:
Ae eed b rabe ener enet isto Plan / Drawing / Report Number Title Date
manager, referral agencies and any person viewing
the application during public scrutiny or pubtic
Notification to understand the scape of the proposat Tone Trot ae een ce cececescwesceccrcrrrcs srr roses eres eseccsvocrecvercssecreperserese scree
and ary potential impact.
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the Sme of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1. -
OFFICE USE ONLY (applicable fo assessment manager's) .
[rem, 475-00 | seceven [8-6-7 [Ser Venta He suf | Niwsens | 2007/ (04 |
Notification of Engagement of Private Certifier (Optional format) :
To, Council. | have been engaged as the private certifier for the building work referred to in this pplication,
Date ofengagement / / Accreditation Number. __Name:, Signature:
Page 4
- ase t @6-@1-2087 13:36 ROBERTS BROS 617 S442 7eii : PRGE: WITVOTUL, 1a63y Mme PRVPEAI IES - 50) 9 sorryie 7 i qtenPsueenen | 1A ctem pincatien ch or erttnnent t, Gn nese - cet esteen od wivcatnd . | CUR 00 cial esscativn of be departenst stedetedng tre consume le eotehed tho @ coourtyes tor naneranemeaee Segornnt naaahint ih clase © attest, 00 ene» oa Cre lel exneaiee of he depertnart eduttatatag te manera fh enteind to ++ ethant t, he nouce-—2 G13 : ae mene 20. Redtence cite nesune eniemene See | * fmammalenaemn _ witsecrsere Cant tie ba engngnd a fn penance arte the tastang math mtaoies ten ta gyi, Pensieoponett_/_t mange Soe rereeremcerc_J 5-1-2007 13:31 ROBERTS BROS 617 5442 eis . , : PRGE1
Page 5
__ against which the apptication will be
INTEGRATED ALANNING ACT 1997. : ee "= Patt D, Version 2.0, 4 October 2004
Form 1 Development Application
Material change of use
assessable against a local government 's planning scheme
oy,
es,
Te.
Completion of all applicable questions on Part Dis mai adatory for ail applications involving assessment of a
material change of use (MCU) assessable against a focal goverments planning scheme.
Nature of the application 4. This application is for: (tick 4 or both # applicable) -
A development permit authorises * [Preliminary approval for a material change of use of premises including conceptual
coment eres allen stile . design for any associated works that require approval under the Planning scheme (ie.
and does not authorise development to occur. consideration of the proposal concep#)
AND/OR
(7 Development permit for a material change of use of premises including conceptual
design for any associated works that require approval under the planning scheme.
The subject land 2. How the subject land is identified in the planning scheme (name the zone, precinct etc.)
For the definition of “gross floor area” go to :
“he pean atane aaiet neh te [se 1G 3 30% :
application will be assessed.
3. Existing gross floor area: (if applicable) [ 1
4. Are thefe any existing easements on the land? ‘
—~ | Wo NO 7
\ W177 7~ ~ [COLYES= attach plans of the location and details ofthe purpose of the easement
fatetiat change,déuse “cei 5. _ Details of the change to the use of the land: (eg. vacant land fo shopping centre, house o apartment bung,
RECEIVED © vacant land to industry (lyre manufacturing) etc.)
{ Nevo Home - Relacahain on" eave less, thor *GO0mn
~8 JUN 2007
NOOSA SHIRE COURCIL
FRONT COUNTER
. 6. Number of employees: | : |
y 7. Operating days and hours: - | : _
o= zon M18 Site<
@ iii ae 8. Site cover: 23 Sie .
ren ee :
area’ and‘ go fo the planning 9, Gross floor area: Be & .
10. Number of on- site car parking spaces: [ ; St . |
11. Number of storeys / maximum height above natural ground:
12 Numberotenpoyees [|
13. Hours and days the use will operate [ _ : ]
Associated operational works details | 14. Details of associated operational works (eg. landscaping, cut and fil, drainage, road works etc.)
(if applicable) . ‘2 7
: PLEASE NOTE
This application cannot'be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY {aopiiosble fo assessment manager)
: DATE RECEIVED
REFERENCE ©
NUMBERIS
Page 6
“INT! EGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
mei Development Application
IDAS noe
Checklist —
(Formerly the “Referrals Checklist”)
IMPORTANT NOTE FOR ALL APPLICANTS:
1, _ This checklist was formerly referred to as the ‘Referrals Checklist’. Some of the ‘Guides’ to using the [DAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function. -
2. ‘Under the PA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e g. Envionmenta Protection
Agency, Dept. of Natural Resources and Water, Queenstand Heritage Council etc.).
3. This checklist is provided to assist applicants to determine when an apptication requires assessment bya a Queenstand: State entity arid may also assist the applicant to
* determine the assessment manager’ for the application,
4. — Therefore, the completion of all questions in section 1 of this checklist is mandatory for alt applications (other than those ruin the sommpiation of PartsA &B ony).
5. Itis the responsibility of the applicant to accurately complete this checklist.
6. - Section 2is Mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.
7, Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.
8. The assessment manager for the application will rely on the information provided in this checklist {as well as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will'aiso rely on this information when identifying if the
. application triggers referral coordination?.
9. Toaésist you in answering the following questions a series of guides are available free from the IPA website www. www.ipa.qid.gov.au. Guide 25 explains the role of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.
10, Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www, ipa.qld.gov.au,
At Section 3 provides advice about the referrals that canbe required for applications for building work assessable against the uit ‘Regulation 2006,
ON.’ TATE SSE MENT ee
tg a evelopm i sther: r Wo eth e againat the Building Reguia ni 2
Environmentally felevant activity | 1. — The application involves: (tick applicable bowes)
“For ote information refer to Guide 4, | °.\1@_ an environmentally relevant activity (ERA) for which acode for environmental compliance,
-Unless you answered “none ofthe above" to, has not been made - complete Part G of Form 1 :
‘the appli ion requires assessment by'the
administering authority’: (iii), a mobile or temporary ERA for which a code of environmental compliance has not been
‘ean entity, other than.ihe administering | Made - completa Part G of Form 1
Authority, ‘is thé. assessmeht mafiager fot the {iii) none of the above
pplication, the-administering authority is'a
oncurrence’ agency for the application in relation
to this matter.
Continued overleaf
PEASE E: \a The assessment manager may refuse to accept an application, which, at the time of lodgement, ‘ails to provide the
completed IDAS Assessment Checklist Cif f applicable).
OFFICE USE ONLY (applicable to assessment manager)
1 The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager 1 fo @n application is prescribed in schedule 8A of the IPA.
2 For additional information refer to Guide 6 ‘Does my application tigger the referral coordination process?’,
3 The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local goverment (for a devolved ERA) or the Queensland Department of Primary Industries and
Fisheries (for a delegated ERA). - .
~ Paget
Page 7
\
INTEGRATED PLANNING ACT 1997 . : - IDAS Assessment Checklist, Version 20, 2 Apr! 2007
‘State-controlléd:road matters. _|2. ~The application involves: (tick applicable boxes) , \
‘ore efonpon er ‘os tea 1602: (C1 (i) development on land contiguous? to a State controlled road and for- . \
in -You-answered enone‘ ‘Of the, ove" 0 .
“the application’ triggers referral to the Department (2 (a) material change of use assessable against the planning scheme; \
of Main Roads (DMR).as. a réfertal agency. Oo (b} reconfiguring alot unless -
In:certa DMR will be an advi
Paiaptebrbtnicadlarat me ; "e the total number of lots is not increased; and ‘
be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased; \
Schedule 2 of the IP Requtation N will assist you to
‘delermine where OMR is an advice o (1 (c) operational work (not associated with a material change of use assessable against the
concurrence agency for the application. planning scheme or reconfiguring a fot mentioned in (b) above}—
: . : : :e associated with access to a State-controlled road; or
forfi iling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
iii) development on land not contiguous to a State-controlled road and -
(] (a) material change of use -
* assessable against the local government's planning scheme; and
. * mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
. . that schedule;
(21 (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation *
“and exceeding the thresholds set by that schedule;
. ; (1 (c) operational work (not associated with a material change of use assessable against th
‘ ” : “og . planning scheme or reconfiguring’ a lot mentioned in (b) above)— :
1H ed + assessable against the local government's planning scheme; and
an « mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
‘that schedule.
Ei) ‘none of the above
The,application-involves: (tick applicable box/es)
(i) material change of use ~
(a) assessable against the planning scheme; -
{b) on alot containing -
« acategory 1, 2 or 3 area shown ona property map of assessable vegetation; or
‘manager for the. apalication, i : ‘ + if there is no property map of assessable vegetation. for the lot - remnant vegetation;
cgoncurTence agency for ne appicatonin relation (c)_ where the existing use of the land is a rural or environmental use; and
ityouitickes-03()0r4i); your, appliction ie (d). where the size of the land is 2 hectares or larger - - complete Part J of Form 1
referral to NRW for: assessment fegardle | (ii) reconfiguring a lot~
(a) on a lot containing a category 1, 2 or 3 area shown on a property map of
ct Be "assessable vegetation or, if there is Qo property map of assessable vegetation for
the lot, remnant vegetation;
(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and .
(d) where the size of any lot created is 25 hectares or smaller - compete Part J of Form 1
CI (iii) operational work: -
(a) for the clearing of native vegetation where the vegetation Clearing | is made
_ assessable under Schedule 8 of the IPA; and
(b} not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ji) - complete Part J of
Form 4 ‘
‘ wot none of the above. |
The application involves: :
DW development on strategic port land as defi ned i in the Transport infrastructure Act 1994 (Tl
. Act) - complete Part ! of Form 1 .
isa (1 (ii) a material. change of use thatis inconsistent with the land use Se plan approved under the
. of TI Act for the strategic port land - complete Part | of Form 1
{iii)
none of the above
“Strategic, port! land
‘For-more information:
concurrence: = aaeney tort
4 Land contiguous toa State-controlled Toad is defined i schedule 14 of the iP Regulation fo mean land -if pat of the tand.is within 100m of the State-controlied toad: 0 or that is part of a future State- ©
controlled road,
. Page 2
Page 8
Cara
- INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 Apri 2007
Acid sulfate soils 5. The application involves development on land situated in an identified local government area
For more information refer to Guide 10. and where the surface of the land is: (tick applicable box)
“UnleSs you answered ‘none af the above” to Q5, 3
the applcaton'requres assessrient by [A(i) below 20m AHD® and the development will involve the excavation of 1000m? or more of
“Departmerit cf Natura Resa mes and Woaler soil or sediment at or below 5m AHD, or
(NRW). ‘ o (ii) ator below 5m AHD and the development will involve fi ling the site with 1000ms or more
sian agency o other tian NRW is:the assessment. of material .
jer far. the. application, NRW isan advice
th (ii) none of the above
{6. Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?"
06; the application NO
the Departent of (1 YES © complete Part L of Form 1
7, The application involves:
[1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
(tick-applicable box/es} _
oO (a) ina watercourse, lake or spri ING, {eg. a pump, gravity diversion, stream re-direction, weir or
° dam} - complete Part Ko, Ks, Ks, Ks, or Ks of Form 1 whichever is applicable,
[1 (b) for an artesian bore anywhere i in the State, no matter what the use ~ complete Part
Ks of Form 7;
. (1 (c) fora subartesian bore, in declared subartesian area’, or in a certain area covered
tht dian NRWis the assessment by a water resource plan, for use for purposes other than stock and/or domestic
for the: Application, NRW is'a fe Part K; of Fi tr
r ‘AGency-for the application in USe - complete Part K: of Form .
Télation to ttiis matter. (1 (d) for a subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part K; of Form 1;
. C1 (e) for taking overland flow water in certain areas covered bya water resource plan
‘ — complete Part Ks of Form 1;
C1 (f) for interfering with overland flow water in a drainage and embankment area -
; complete Part Ko of Form 1
(1g) for constructing a referable dam® or works that will increase the storage capacity
of a referable dam by more-than 10% - complete Part Ks of Form 1, of
; Hii) none of the above. .
8. Does the application involve development for the removal of quarry material from a watercourse?
Removal of quarry taterial from a
<Watercourse.
‘For more iriformation tefer to Guide 16.
Ifyou ariswered.“YES" to Q8, the application
Ox: assessment by the Department of
Ni
tifal Resaurtes 3 ind Water (NRW).
tf any agency other than NRW is the assessment
Manager for the application, NRW is a
‘concurrence agency for the application in
Hélation to this matter.
Note: Part G.of Foti is required tobe”
‘completed as thé activity of removing quarry ~
-. material from a watercourse is also an .
“*Envirorimefitally Relevant Activity (ERA):
requiring an allocation notice under the Water Act 2000?
NO
[11 YES - cémpiete Parts Kr and G of Form 4
§ The identified local govérnment areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnet, Caboolture, Caims, Catfiope, Caloundra, Cardwell, Carpentaria, Cook,
Cootoota, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey ‘Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redelifia, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday. .
Australian Height Datum (AHD).
Watercourse Is defined in sch 10 of the IPA.
The dectared ground water areas are listed in Guide 13 Develooment in a declared catchment area,
Referable dam is defined under the Water Act 2000.
"pages
Page 9
INTEGRATED PLANNING ACT 1997
Operational work that is tidal work or
work in coastal management district
For more information refer.to Guide 18. For
More information about prescribed tidal work in
tocal goverment tidal areas refer to Guide 24.
Unless you answered “none of the above” to Q9,
the application requires assessment by the
Environmental Protection Agency (EPA).
(fan agency other than EPA is the assessment
Manager for the application, EPA is a .
concurrence agency for the application ir
elation to this matter,
Locat goverment i is the assesgmient manager
for all prescribed tidal work.
“Operational work below high water
amark
For inore information refer to Guide 18. For
more information about prescribed tidal work in
local government tidal areas refer.to Guide 24.
Unless you.answered ‘noite of the.above" to
.Q10, the application triggers referral to
Queensland Transport (QT) {Maritime Satety
Qld) as a.concurrence agency. .
Local government is the assessment manager
forall. prescribed tidal work.
9.
IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves operational work that is: (tick the applicable box/es)
OW
Wi)
Ow
rw)
}10. The application involves. operational work thats: ( tick the applcabie box/es)
Ow
D ii
Bi)
ty
tidal work" as defined under the Coastal Protection and Management Act 1995 (the
‘Coastal Act) that is not prescribed tidal work - complete Part M of Form 1, OT
tidal work that is prescribed tidal work" other than ina canal!2 -complete Part P of Form 1; OF
carried out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any box/es (a) to (i) below are ticked. .
[1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ;
constructing a canal12 intended to be connected to tidal waters;
.constructing an artificial waterway;
reclaiming land under tidal water; , /
disposing of dredge spoil or other solid waste-material in tidal water;
interfering with quarry material on State coastal land above high-water mark;
draining or allowing drainage or flow of water or other matter across State
-coastal land above high-water mark;
removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
none of the above.
CF] ()
Oo)
C1 (a)
Oe)
Oi
Oi)
Oth)
0 (i)
tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work = complete Part M of Form 1; or
tidal work that is prescribed tidal work" - complete Part P of Form 1; OF
carried out within a coastal management district's under the Coastal Act and for -
O (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
M of Form 1, .
OD (b) reclaiming land under tidal water - ~ complete Part MofFonm 1; Of
{4 (c) © constructing a canal12, if the canal is associated with reconfiguring alot-
complete Part M of Form 1;
none of the above.
Coastal management
For more information refer to Guide 18.
Unless you answered “none of the above” to *
_ Q11, the application requires assessment by the
. Environmental Protection Agency (EPA).
tf an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
felation to this matter. ~
10 -Tidal work is defined in sch 10 of the IPA.
11.
The application involves: (tick the applicable box/es)
Ot
Di)
a material change of use assessable under a planning scheme involving opérational
work carried out completely or partly in a coastal management district!
a material change of use assessable under a planning scheme involving building r
work, carried out completely or partly in a coastal management district that is -
« the construction of a new-premises with a GFA’ of at least 1000m?-
« the enlargement of the GFA of existing premises by more than 1000m?
reconfiguring a lot assessable under schedule 8 of the IPA where the landis situated _
_ completely or partly in a coastal management district,
" reconfiguring a lot’ assessable under schedule 8 of the IPA and in connection with
the construction of a canal12 - complete Part M of Form 1
none of the above
11 Prescribed tidal work is defined in the Coasta! Protection and Management Regulation 2003 and includes certain tida! works completely or parlly within a local government tidal area.
12 Canal means canal as defined under the Coastaf Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completaty or partly within a local government tidal area,
15 Coastal management district is defined in sch 10 of the (PA and means a coaslal management district under the Coastal Protection and Management Act 1995, olher than an area declared as 2°
coastal management district under section 47(2) of that Act.
16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, 90 to the planning scheme | against which the application is being assessed. .
17 Under 5117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artific cial waterway, must be
aocompanies by the application for the operational works to construct the artificial waterway. .
Page 4
Page 10
INTEGRATED PLANNING ACT 1897
IDAS Assessment Checklist, Version 20, 2 Apri! 2007
Development within the limits ofa 12. Does the application involve development below high water mask and within the limits of a port
port” .
“For more information refer to Guide 18. For
information about prescribed tidal work refer to
Guide 24,
you answered “YES” to Q12, the application
tiggers referral to the Port Authority.
- The Port Aistharity is'a concurrence agency if the
development.is -
‘© within 200m of a shipping channél or an entry.
and exit shipping corridor for the port”
* within 100m of a swing basin, a commercial
shipping whart, a mooring: anchorage or spoil
grounds;
(© Within 1000m-of. a planned port actity
identified ia land-use plan approved under
- the Transport infrastructure Act 1994.
{nail other Situation the Port Authority is s an
advice agency.
under the Transport infrastructure Act 1994? .
(wH0
LD YES - complete Part M of.Form 1, or Part P of Form 1 if the work is prescribed tidal work
“Marinas > :
«For more information refer to. Guide. 18, For
‘iftormation about. whether. a‘marina is prescribed
dal work refer to Guide 24. The'local
* govermmentis thie asséssfent’ imariager for ay
prescribed tidal work:
If you answered “yES" to Q13, ‘the appléation.
“triggers referral to ueensland Fire and Rescue
‘Service as an advice agency.
Tidal works-in strategic ‘port land tidat
‘areas,
Fort hore information tefer to Guide .
Uniess you: answered: “NO” to Q14,'the relevant |
Port Authority is the assessment manager for, the
i open and the Environmental Piotectioh’
Agency (EPA) and Queensland Transport (QT)
.are concurrence agencies for the application.
— fF
1
3. Does the application in involve operational w work that is tidal work for a marina® with more than 6
- vessel berths? «
FNo ,
(71 YES - complete Part M of Form 1, or Part P of Form 1 ifthe tidal work is prescribed tidal work
een
4. cof the application involve tidal works within a strategic port land tidal "area? [
vero yt bee pa ae fe ate \
CYEs- complete Past M of Form t
“4 ete ty io :
‘Heritage
For further information refer. to Guide 1 9.
if you answered "YES" to Q15, the application
triggers referral to the’ ‘Queenstind Heritage
‘Council as concurrence. agency for the
‘application. :
“Unless you answered “none of the above” to
* Q15(b), the application involves réferral to the -
‘Environmental Protection Agency asan advice ©
agency for the application .
1
1
5. Does the application involve 6 dveopent ina heritage registered place as defined under the -
Queensland Heritage Act 1992?
NO :
DYEes- complete Part c of Form 1
15(b)The application involves: (tick applicable boxes) . :
C1 (i) a material change of use assessable against the planning scheme and the lot shares a.
common boundary with a protected area or registered place‘under the Queensland
Heritage Act 1992;
Diii) reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;,
C1 iiii) none of the above.
Declared catchment areas
For mare information, including a list of the
declared catchment areas within Queensland,
tefer to Guide 13.
Unless you answered “none of the above” to
Q16, the application requires assessment by the
:Department of Natural Resources.and Water
(NRW)...
. Ifan agency other than NRWis the assessment
“manager for the application, NRWis a
Concurrence agency for the application it in
relation to this matter.
1
6. The application | is in an area declared to be. a catchment area under the Water Act 2000 and
‘involves: (tick the applicable bax/es)
oO (i) reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares;
Oo (ii) . development assessable against the planning scheme involving the establishment or
.expansion of a waste water disposal system, other than a disposal system for carrying
ot out an environmentally relevant activity, under the Environmental Protection Act 1994;
(iii)
none of the above
18 igh water mark-is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide,
19 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995.
2% Staley port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to swalegie portland.
Page 5
Page 11
- INTEGRATED PLANNING ACT 1997
Contaminated‘land’
"Applications involving materia change of use
and/ or reconfiguring-a lot may trigger this
. Feferral.
For more information refer to:Guide'5.
Unless you answered “none of the atiove” to
Q17, the application requires asséssment by the
“Environmental Protection Agency (EPA). If an
agency other than EPA is-the assessment
manager for the application, EPA will be.a
concurrence agency far the application in
sélation to this matter:
fo
IDAS Assessment Checklist, Version 20; 2 April 2007
17. The application involves: ‘(tick the applicable box/es)
(1 @ reconfiguring a lot for which all of part of the premises are —
(a) premises mentioned in the IPA, schedule 8, part 1, table 2 - ‘
« item §, including the exemption otherwise provided for by paragraph (d);
« item 6, including the exemption otherwise provided for by paragraph (e); or
+ item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or :
{b) in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
UO (ii) a material change of use -
(a) “made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
- for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1 . , .
iii none of the above
“Electricity infrastructure
For more information refer to schedule 2of the, IP
‘Regulation. :
“Unless you ans)
3018, the applicati
. The application involves: (tick the applicable box/es)
C1 (i) ‘reconfiguring a fot where any part of the lot is -
subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or ‘ , ,
« situated within 100m of a substation site; e}
Oi (ii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if - :
. © any part of the premises is subject to an easement in favour of a-distribution entity or
transmission entity under the Electricity Act 1994 and the easement i is fora transmission
"grid or supply network under that Act; and
any structure or work thal is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;
D (iii) a material change of use, assessable against a planning scheme and not associated
- with reconfi iguring a lot if any part of the premises is situated within 100m of a substation
* site; .
oO (iw operational work that is filing or excavation assessable against the planning scheme,
“not associated with reconfiguring a lot, if -
any part of the premises is subject to an easement in favour of a distribution entity or
transmission éntity under the Electricity Act 1994 and the work is located wholly or party i in
_ the easement;
ui + the work is located wholly or partly within 10m of a substation site;
\v)
) none of the above.
‘Land designated: f68-4 COM
infrastructure
Applications involving devélopinent on land
designated for community infrastructure may .
. trigger this teferral,
-For. more information’ teler! to'schedule 2 of the |
{P Requiation.
Af you answered “YES"to Q19;:thé application 4 .
tequires assessment by the.chief:executiv
the department: administering) the Act authorisin
‘the development for the designated purpose.
designating agency will be a concurrénce |
“agency for the application’ in relation: tothis *
‘matter: woh.
. Does the application involve development assessable against the planning scheme and on n® :
designated for community infrastructure?
(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the Stale, and
(iii) . other than development -—
(a) for the designated purpose; or
oe carried out by, or oni behalf of, the designator.
‘Dyes
- Pages
Page 12
INTEGRATED PLANNING ACT 1997” _. : 2 IDAS Assessment Checklist, Version 20,2 April 2007
~SEQ ‘Regional Plan . 20. The application involves (tick applicable boxes) -
_ For more information Fefer fo schedule 2 of the C1 (i) amaterial change of use of premises -
PReiulaton , (a) ina Major Development Area in the Urban Footpin for -
Act 1997, and schedule : (1 (i) anurban activity -
Provisions for relevant : Oo in an area included in a structure plan where the IPA, section 3.1.6
yo lone afthe above" ® ix : applies; -
f te quites asassment by the : | in an area not incl ded i in a structure plan where -
a een (uM : . a « the IPA, ocion 3 1.6 applies to the slate for the material change
4 of use; or
« the premises exceeds 10,000m2; or
+ the gross floor area (GFA) on the premises will exceed 10,000m2; or
« impact assessment is required under the relevant planning scheme
CO (ii) intensive animal husbandry, or
a
(iii) residential development involving a rural residential purpose
{b) in the Regional Landscape and Rural Production Area for -
CI (i) - an urban activity and not specified in section 2. 4(2); or.
oO (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2)
. (d) in the Investigation Area for -
‘C1 (i) anurban activity and not specified in section 2.1 (2);
Be CD (ii) residential development involving a rural residential purpose and not _
. ‘ specified in section 2.12(2)? or :
OO iii) intensive animal husbandry
(1 (ii) reconfiguring a lot-:
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and ©
(b) not specifi ied in section 3. 12).
W (ii) none of the above
sFisheries waters : : -|.21, The application involves: (tick the applicable box/es)
{For more inforination refer.to schedule 2of the IP Ci (i) an assessable material change of use for aquaculture - complete Part 0; of Form 1;
C1 (i) assessable operational work that is the construction or raising of a waterway barrier -
complete Part Os of Form 1).
C1 (iii) assessable operational work completely or *patly within a declared fish habitat area-
, complete Part Oe af Form 1;
agency other-than DPIBF i is the assessment} :
et fof the application, OPISF Isa : Ow assessable operational work that is the removal, destruction or damage of a marine
e: co généy forthe application in
Felation:to items (i) -.(iv) and.an-advicé agency plant - complete Part O2 of Form 1,
in in felation to item (v). . ow ) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;
ori none of the above.
Page?
Page 13
INTEGRATED PLANNING ACT 1997
Integration of land use and public °
transport
~ For more information refer to Guide 23, schedule
8A of the IPA, & schedule 2 of the IP-Requlation.
Untess you answered “none of the above”, the
application triggers referral to QT as a
concurrence agency.
Q
IDAS Assessment Checklist, Version 20, 2 April 2007
22. The application involves: (tick the applicable box/es)— -
C1 (i) a material change of use assessable against the planning scheme fora purpose
~ mentioned in schedule 13C of the IP Regulation: and exceeding the thresholds set by that
schedule.
L (ii) reconfiguring a lot—
Oa)
Oo)
‘Oo.
Cid)
Che)
on fand that is completely or partly within a a public transport corridor, and the
total number of lots increases;
on land that is completely or partly within a future public transport, corridor or
an airport's public safety area;
on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
. for a residential purpose within the 25 ANEF contour for an airport;
for a residential purpose resulting in 100 or more allotments.
C1 (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that
Ola)
d, Ow)
{i vy) none of the above.
is completely or partly within a public transport corridor or a future public
transport corridor;
will result in work that encroaches into an airport's operational airspace.
Railway safety and efficiency
For more information refer to Guide 23, schedule
8A of the IPA-& schedule 2'6f tie IP Regulation.
Unless you answered “none ‘of the above’, the
application triggers referral to QT as a
concurrence agency.
‘| 23, The application involves: (tick the apolicable box/es)—~
oD (i) a material change of use assessable against the planning scheme for a purpose
* mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule,
Oo tii) ) reconfiguring a lot—
D(a)
Ci (b)
Oo
O@
De).
on
-on.Jand that is completely or partly within a future public transport. corridor,
future railway land or a railway tunnel easement,
on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger ralway station, and the total site area is 5000m? or
greater;
on land that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
on land that abuts rail corridor land, commercial corridor land or future railway
land.and an easement abutting the corridor or future railway tand is created;
on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
for a residential purpose resulting in 100 or more allotments.
(ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) e
above, involving extracting, excavating or filling greater than 50m3, on land that—
(1 (a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
(1 (b) is completely'or partly within future railway land, or a railway tunnel easement;
[3 (c) . abuts rail corridor land, commercial corridor land or future railway land, and
‘ -the work is within 25m of the railway boundary.
ain) none of the above.
“Moonie to Brisbane pipeline
For more information refer to schedute 2of the [P
Regulation.
Unless you answered “none of the above”, the
application triggers referral to the holder of
pipetine licence No 1 issued under the Petroleum
Act 1923, currently Santos QNT Pty.Ltd, for
advice,
: 24. The application involves the easement for the construction or operation of the Moonie to
Brisbane strategic pipeline, and-involves; (tick the applicable box/es)—
Oa | material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the |
easement.
C1 (ii) reconfiguring a lot
C1 (ii) operational work assessable against the planning scheme, that is filling, excavation,
“compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.
(iv) none of the above. -
‘Page 8 .
Page 14
INTEGRATED PLANNING ACT. 1997 Koala habitat area For more information, refer to Guide 26 and schedule 2.of the IP Requlation. Untess you answered “none of the above’, the application requires referral to the Environmental “Protection Adency-as acoficurrence agency. ’ : IDAS Assessment Checklist, Version 20, 2 April 2007 sustainability area made assessable under a planning scheme, that is not for a domestic (>) anew building and any reasonably associated structure with 2 a total footprint the extension has a total footprint greater than 1000m?; Oe). additional traffic in a koala conservation area or koala sustainability area, result in - LD (iti) operational work ina koala conservation area or koala sustainability area made over an area greater'than 2500m?. mentioned in (i) or reconfiguring a fot mentioned in (ii) above) that i is not for a domestic activity LL) (b) extracting gravel, rock or sand from an area greater than 5000m?; 25. The application involves: (tick the appficable box/es}— L(i) a material change of use of premises in a koala conservation area or koala activity and will result in - .- ‘1 (a) clearing of native vegetation over an area a greater than 2500m?, greater than 1000m?; Ole) an extension to an existing building and any reasonably associated structure if (1d) extracting gravel, rock or sand from an area'greater than 5000m?, excavating or filling an area greater than 5000m2; -O between 6p.m. on a day and 6a.m. on the following day. Di (ii) reconti figuring alotina koala conservation area or koala sustainability area that will Ci (a) an increased number of iots; [1 (b) clearing of native vegetation over an area greater than 2500m?, assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with reconfiguring a fot mentioned in (ii) above) that will result in the clearing of native vegetation L (iv) operational work in a koala conservation area or koala sustainability area ‘made assessable under a planriing scheme (not associated with a material change of use and will result in - C1 (a) clearing of native vegetation over an area greater than 2500m?; ‘L1(c)_ excavating or filling-an area greater than 5000m2, ° v) none of the above. ~-Wild-tiver area - For more’ information, refer to Guide 27 you answéred YES to Q26, you must also Complete section 2 of this checklist. This will eiablé you to determine if your application can (proceed in.a wild river area and which referral agency will assess your application against the Wild Rivers Code, or if-the proposed development is “prohibited” in a wild river area, “Note; Development can be ‘prohibited’ in a wild river area becatise the application cannot be . accepted by the assessment manager. 26. Does the application involve development in a wild river area declared under the Wild Rivers Act - 2005? Eo: Oyes Preliminary Approval ~ Ifyou answered YES to.027, the apptication triggers referral to the Department of Local Government, Planning, Sport and.Recreation as an advice agency. 27. Does the application involve a development for which preliminary approval i is sought under Section 3.1.6 of the Integrated Planning Act 1997? NO DIYEes: “Wetlands Domestic activity means the coristruction or use Of a single residence on a lot and any reasonably ‘associated building er structure. Examples of.a _ building or structure. that could be reasonably associated with a single residence include: caretaker's residence, granny flat, building or Structure, used for a home business. * Note: Wetland is defined j in the Integrated Planning Regulation 1998. Unless you answered ‘rione:of tie above™ to Q28, the application irivolves referral to the . Etvironmentat Protection, Agency as an advice agency for the application. 28. The application involves: (tick the applicable boxes) - Oi) amateriat- change of use, other than for a domestic activity, assessable against the planning scheme thatis in or within 100m ofa wetland; : Di (ii) reconfiguring a tot - In or within 100m of a wetland that will result in [1 (a) more than 16 lots being created; or mf (1 (b) lots tess than 5 hectares; (iii) none of the above - . Paged
Page 15
INTEGRATED PLANNING ACT 1997
Conservation Estate —
Urban purposes is defined in the Integrated...
. _Planning.Act 1997 as “purposes for. which land is
-used in cities or towns, including residential,
industial, spo i i
purposes, but nmental, :
conservation, ‘ufal, “natural ‘or wildemess area
“Puposes :
agency. for the actor
‘ ”
IDAS Assessment Checklist, Version 20, 2 April 2007
29. The application involves: {tick the applicable box/es}— .
(1) {i) a material change of use for urban purposes that i is in or within 100m-of any of the
following -
Oa) a protected a area, forest reserve, ‘oftical habitat or area of major. interest under
the Nature Conservation Act 1992;,
L (b) a State forést or timber reserve under the Forestry Act 1959;
[1 (c) amarine park under the Marine Parks Act 2004;
[1 (d) arecreation area under the Recreation Area Management Act 1988;
(J (e) a world heritage area listed under the World Heritage Convention;
(4 (f) Brisbane forest park under the Brisbane Forest Park Act 1977.
D (ii) reconfiguring a lot if - .
(J (a) any part of the tot is situated in, or within 100m of, any of the following -
CI (i) ‘a protected area, forest reserve, critical habitat or area of major
interest under the Nature Conservation Act 1992;"
ii) a State forest or timber reserve under the Forestry Act 1959; °
iii) a marine park under the Marine Parks Act 2004;
iv) arecreation area under’ the Recreation Area Management Act 1988;
v) aworld heritage area listed under the World Heritage Convention;
Brisbane forest park under the Brisbane Forest Park Act 1977; and
(1) (b) the reconfiguration involves more than 10 lots being created, or any lot
hs ‘resulting from the reconfiguring i istess than Sha; | @
(iil) none of the above. . .
Page 10
Page 16
INTEGRATEO PLANNING ACT 1997
DAS seen eo Version 20, 2 Apri 2007
Wild River area.
“Itthe responsibility of the applicant to
‘determine if the development is Proposed i in
+a wild-river area.
Information about wild iver areas Including the
geographical location and position of .
«managemént-areas in.telation te propefties, can
“be accessed by contacting the Department of
_ Natural Resources and Water (NRW), accessing
therdepartmient’s website www.ritw, Qld. gov aor.
“coi acting the department by email on:
“wild [email protected]:gov.au
“Note.on Referrals
*Referrals for development in a wild river area
-{ather than for agricultural activities and animat
; husbandry activities) are not changed from the .
‘existing referral airangements.
i Notes on development assessable
‘against the Wild Rivers. Code’
+ For information regarding development in a wild
fiver area, see the relevant wild river declaration
?and Guide 27, The relevant wild-river
claration will provide. information regarding
@ Which types of development: must be assessed
‘ against the Wild Rivers Code, and in some.
i cases which types: of development are exempt
from wild fiver requiremeits.
"THe notes on develdpment assessable against
«ithe Wild Rivers Code jn this section of the
“checklist provide some guidance however this -
‘hay vaty between: wild river areas. The relevant
declaration will provide the information applying
to each wild river area,
“Applications for same new developments will not
“be, accepted if the proposéd development is in a:
“uhigh preservation area (HPA). Most applications
‘ifor development activities which, may:be made
éincluding those ina preservation area (PA), must
ibe assessed against and must comply with the
"Wild Rivers Code where indicated in a relevant
Wild river declaration.
1.
Which wild river area is the development proposed in in?
The proposed development is to be located in: (tick he applicabié boxes)
(11) a high preservation area (HPA).
(ii) a preservation area (PA) ; -
oO ill) a wild river floodplain management area (FMA);
LO iv) a wild river nominated waterway;
(1 w) a designated urban area (DUA).
“Environmentally relevant activities
. {ERAs) in a designated urban area
alfyou answered-YES, your apptication for an
“ERA is exempt from any wild river requirements
":and provided there are no other aspects of this
development that require assessment against
iwild rivers, you do not need to complete the
maining questions in Section 2.
‘ou answered NO to Q2, ptease complete the
‘temaining questions in Section 2:
‘Clearing native vegetation
“IF YES, there are a limited number of purposes
for which an application to clear native
vegetation may be accepted in a HPA. See
Guide 27 fora list of relevant purposes for
‘which an application may be made In a HPA.
EYES and you ticked Q4 box i) the application
‘may be made and is assessable against the Wild
«Rivers Code. If YES and you ticked 04 box ii)
“the apptication will not be accepted.
Note: If clearing native vegetation is ina PA,
there are no wild river requirements and
_brovided there are no other aspécts of this
" "development where wild river requirements
apply, do not complete the remaining questions
in Section 2.
4.
2.
Does the proposed development only involve any of the following environmentally relevant
activities (ERAs) in a designated urban area ea (as mapped in the relevant wild river declaration)?
i) An ERA 28 or ERA 14: or
ne. 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.
NO : O YES (ensure you have completed Part G of Form 1)
Is the application operational work for clearing native vegetation in a HPA? :
NO : O) YES (ensure you have completed Part J of Form 1)
If YES, is the clearing?
O i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
area of agriculture in a HPA (see Guide 27); or
‘OO il) in a HPA outside a registered area of agriculture?
Page 11
Page 17
_INTEGRATED PLANNING ACT 1997
‘Works in tidal areas, coastal
management districts and fish habitat
areas ‘
If you answered YES to Q5, and ticked any
boxes in Q6), your application is required to be
assessed against and must comply with the Wild
Rivers Code,
“Ifyou answered YES to Q5 and ticked box i) in *
Q6, your application is required o be réferred to
the EPA,
Note: If specified works are proposed ina local
government area, it is prescribed tidal work - the
relevant local government will be the
assessment manager with the EPA as a
coneurrence agency
H you answered YES to Q5, and ticked box ii) or
ili) in Q6, your application requires referral to,
DPIF.
* Ifyou answered NO to'Q5 and ticked box i} in ,
Q6, the application will not be accepted.
Hyou answered NO to Q5, ticked box ii) in Q6
-and the development is necessary to install
authorised works or infrastructure where a
development pemmit is not required, or if a
fequired permit is held, thie application must be
* -dssessed against and-must comply with the Wild
Rivers Code. Applications for purposes other
than specified works:or as described above wilt
not be accepted.
If you answered NO at Q5 and ticked box iil) in
Q6, the application may be made if the works are]
ina PA. These applications must be assessed.
+against and must comply with the Wild Rivers .
- Code, The applicatian will hot be accepted if the
development is proposed to be located:in a HPA,
For more information about specified works refer
to Guide 27
6.
Development in a wild river area)
Trio - Eyes:
The application is for one or more of the following: ,
+
(DAS Assessment Checklist, Version 20, 2 April 2007
is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
(Ji) Operational works that is tidal works or works in a coastal management district fensure you .
have completed Part M and/or Part P of Form 1); OF ~
oii ) Operational works for the removal, destruction or damage of marine plants (ensure you have
ee Part O2 of Form 1); Of
Di iii) Building or operational works in a fi sh habitat area fensure you have completed Part O2 of Form 1).
Residential, commercial or industrial
development
If you answered YES to Q7, your application i is
- not sudject to wild river requirements. Provided
there are no other aspects of this development
that require assessment against the relevant wild
river deciaration or-Wild Rivers Code,.you do nat
“need to complete the remaining questions in
Section 2.
if you'answered NO-to Q7 and ticked either'box
') or ti) in Q8, the assessing agency is the
‘relevant local goverment. The application must
be assessed against and must comply with the
Wild Rivers Code.
Animal husbandry activities
__ Ifyou answered YES to Q9 your application
fequires assessment against and must comply
with the Wild Rivers Code.
The assessing agency is NRW, ©
Note: Applications for animal husbandry
activities will not be accepted if proposed in a
HPA. For nore details and a definition of animal -
hushandry activities see the Wild Rivers Act -
2005 and refer to‘Guide 27.
8..
Is the application for residential, commercial or industrial development in a designated urban
areg?
Pino
LC] Yes
If NO, does the application for residential, commercial or industrial development involve: °
Ci i) a material change of use made assessable in a local government planning scheme
{ensure you have completed Part D of Form 4); or
(_] ii) operationat works associated with reconti iguring ¢ alot (ensure you have completed Part F
of Form 1).
Does the application involve a material change of use ior animal husbandry activities (as defined
under the Wild Rivers Act 2005) in a PA?
NO : Oo YES (ensuré you have completed Part R of Form 1)
Agricultural activities
Hf you answered YES to Q10, your application .
fequires assessment against and must comply
with the Wild Rivers Code.
«The assessing agency is NRW.
Note: Applications for agricultural activities will
_ Not be accepted if proposed in a HPA. For more”
details and a definition of agricultural activities
see the Wild Rivers Act 2005 and refer to Guide
27.
The production of fodder in a PA, and pasture
improvement using low impact soil disturbance
techniques is not an agricultural activity as
defined under the Wild Rivers Act 2005. For
smore information see Guide 27.
10.
Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
a PA?
NO
if YES is the application for:
(11) a materiat change of use: or
CJ ii) operational works.
Page 12
(J YES (ensure you have completed Part Q of Form 1)
Page 18
INTEGRATED PLANNING ACT 1997 Works that take overiand flow water The relevant wild river dectaration will state works thal take overtand flow water are either Self assessable or assessable, or are exempt from wild river requirements. Ifyou ticked Q13 j), your application must be assessed by NRW.against the Wild Rivers Code and must comply with the code. you ticked Q13 ii) an application i is not fequired to be made however the works must cornply with’ the relevant self-assessable section of the Wild Rivers Code, otherwise the works become assessable development for which an application: +is required and must be assessed by NRW Against the relevant part of the Wild Rivers Cotte and must comply with the, code. (f you ticked Q13 iii) your application is not Subject to wild river requirements. “Applications for devélopmienit that is ottierthain that stated to be assessable, self assessable or exempt will not be accepted. 13. IDAS Assessment Checklist, Version 20, 2 April 2007, Does the application involve works that take overland flow. water in a HPA or an FMA? NO Ll yes (ensure you have completed Part Ksof Form 1} It YES, is the application for works stated in the relevant wild river declaration to be? Oi i) assessable works ‘ Oo] ii) self-assessable works oO iti) exempt works oe ete Va A “Works that interfere with overland flow water : The retevant wild siver declaration will state. works that interferé with overtand flow water that (are either self assessable, assessable or exempt “from wild river requiretnerits. Ifyou ticked.Q15 i), your application must be" assessed by NRW against the Wild Rivers Codé: and must comply with the code. Ifyou ticked Q15 ii) an application is not required to be made however. the works must comply with the relevant setf-assessable section of the Wild -Rivers Code, othemwise the works become _ assessable development for which an application is required and must be assessed. by NRW .” against the relevant part of the Wild Rivers Code +and must comply with the code. “Ifyou ticked Q15 iil) your application is not + Subject to wild river requirements. Applications for development that is other than . ‘that stated to be assessable, sell- assessable or exempt will not be accepted. Doe the application in involve works that, interfere with overland flow water ir ina FMA? most . () YES (ensure you have completed Part Kio of Form 1) : If YES, is the application for works stated in the relevant wild rivers declaration to be? (1 i) assessable works : (J ii self-assessable works - (Till) exempt works ; : : : ‘ ‘Waterway barrier works Applications for building or raising waterway barrier works in a HPA will not be accepted. ‘you answered YES.to Q16, your application .. ‘must be assessed .by DPIF against the Wild : Rivers Code and must comply with the code. Aquaculture (non’ERA) ‘Apptications for aquaculture in a HPA will not be accepted. -Hyou answered YES to Q17, your application Must be assessed by DPIF against the Wild Rivers Code and must comply with the code, Works that interfere with water in a watercourse Note: if the development is proposed in a HPA, applications for all works that interfere with water in a watercourse (including dams or weirs, stream realignment or steam n diversion) will not be accepted. in a PA, applications for instream dams and weirs may be accepted in nominated waterways. Hf you ticked box i) in Q19, your application will notbe accepted. Note: Operational works outside a. HPA or nominated waterway are not Subject to wild river requitemerits, .More information and lacations of nofftinated waterways is available by contact NRW, ‘accessing the department's website weww.nnw.gid.aov.au or contacting the department by email on: wild. ivers@nrw. ald.qov.au. ‘16. Does, the application involve building or raising waterway barrier works in a PA? © Ne) LJ Yes (ensure you have completed Part O; of Form 1) Does the application involve aquaculture in a PA? NO O YES (ensure you have completed Part Os of Form 1) Does the application involve operational works that interfere. with water in a watercourse that is in a nominated waterway in a PA? NO. Oo YES (ensure you have completed the relevant Part K of Form 1) “IFYES, oO i) The application is for an instream dam or weir: of: oO ii) The application is for operational works that interfere with water in a watercourse, andi is for development other than a dam or weir. Page 13
Page 19
INTEGRATED PLANNING ACT 1997
Environmentally relevant activities
Most applications for an ERA in a HPA will not
-be accepted. Applications which may be made
Tequire referral to the EPA. The assessment of-
some ERAs is assessed by NRW, others have
been devolved to DPIF, NRW or delegated
local gavemment (see.EPA website for more
information on devolved ERAs)
Ifyou answered NO to.Q20 you do not need to
complete Qs 21-24.
Ifyou answered YES to Q20 and the
ic tion must be.
assessed by the-ad nistering
against the Wild Rivers ‘Code and must comply
. with the code, unless the proposal is for
development where an application will not be
: accepted, or is exempt from wild river
“fequirements (see Q2); You-will be able to .
determine if an ‘application will not be-accepted, ©
(tor the-development by‘answering 21 - :
“t you answered NO:to.021, you do ‘not need to
coriplete‘Q22. If you answefed VES to Q24 you
are required:to-compléte-Q22,
tfyou answered:NO to.Q22, the application will .
+ not: be:accepted.” If you answered YES to Q22,
‘application must be. assessed by NRW wf
‘against the Wild.Rivers’ cote ‘and.must comply“
_ with the. code,
Ifyou answered NO to Q23 and the developineint
is proposed i inthe HPA the ‘application will not be
‘accepted. if.you answered YES to Q23, the
application must be assessed by the EPA or
NRW (as prescribed in schedule 8A of the PA) |
‘against the Wild RiversiCode and.must comply
with the code. ,
Wfyou answered YES to-Q24 the application will °
-not-be accepted. if you answered NO to Q24,
your application must be assessed by NRW
against the Wild Rivers.Code and must comply -
‘with the code,
Exempt! ERAs in a.designated urban
warea ‘
"ithe development is proposed in-a designated *
urban area there may be no wild fiver
* requirements. See Section 22.
“Note: All applications that can be’ accepted must
be assessed against and must comply withthe |
Wild Rivers Code(other than exempt ERAs ina |
designated urban area).
20.
21.
22,
23.
24,
“Does the application involve an ERA?
IDAS Assessment Checklist, Version 20, 2 April 2007
NO oO YES (ensure you have completed Part G of Form!)
ts the application for an ERA 20instream?
NO CJ yes
Is aquarry allocation notice held for the proposed ERA 20 instream?
no Lives .
Does the application involve any of the following in a HPA? ©
i) alevel 2 ERA 11, (and is for specified works or a residential complex)
ii) an ERA 19 (dredging) :
iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994}
"A ERA 22 (out of stream)
NO Clyes
{s the proposed development for ERA 20 (out of stream) and;
— in aFMA; and
— not low impact; and
— mot for a residential complex in the area, or for specif ied works.
NO ‘Dyes
‘Documentation
{f you answered NO.tos Q25;-your application:
_May be subject to an information request and
processing of the application-may- be delayed.
25.
Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance =e
as set out in the relevant parts of the Wild Rivers Code?
NO Cyes
n The administering authority may be either the EPA, or if devolved or delegated, the local goverment, DPIF or NRW.
- Page 14
Page 20
“INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
a ee re
Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.
Specialfire Services-generally —} 1.
For more information 9010 schédute 2 table 7 and
|-Schadute 2A ofthe’ {P Regulation.
Assessment | period: 15 days: NO response isa
| deemed refusal, A
An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
Tequires special fire services mentioned in schedule 2A part 1 of the integrated Planning Regulation 1998
(IP Reguiation) or includes an altemative solution assessed agains! the performance requirements of the
Building Code of Australia. .
-Firé-safety forbudget accommodation: | 2.
For mote information ga to'schedule 2 of the IP
FRegutation —* .
An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
the subject of the application requires the installation of a fire safely system for a budget accommodation
building. :
[Spray paintir .
For more information.go Ad schedule 2 of the IP
Requtation
An application may trigger referral to the Department of industrial Relations (OR) as concurrence agency
if the application involves a workplace incorporating spray painting.
Retail. meat.prémises - 4.
For more informatics go to schedule 2 of the IP
An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a
retail meat premises.
An application may trigger referral to the Department of Health as a concurrence agency if the application
For more. inforrnation go to.schedule 2 of the IP. involves a private health facility, ©
Regulation 7
Workplace aréa: less than 2. 3am? 6. An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the
application involves a work place area less that 2.3m2.
Htand coritiguous ¢ Staté:controlled 7.
road
F For more: information go! 10 schedute 2 a the IP
| Regutation ~
An application may trigger referral to the Department of Main Roads as a concurrence agency or radvice
agency if the application involves land contiguous to a State-controlted road.
bPastorat workersaccommodation 6.
“For more information goto toschedute 2 of the IP
‘Regulation
An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence ‘agency
if the application involves pastoral workers accommodation.
Child care centre _ 19
For mora information ga to schedule 2 ofthe IP
‘Regulation
An application may trigger referral to the Department of Communities as a concurrence agency if the
application involves a childcare centre.
Fr mofe information goto > schedule 2 ofthe (P
) Regulation
Coastal development . 10.
An application may trigger referral io the Environmental Protection Agency {EPA) as a concurrence agency
if the application involves land completely or partly seaward of a coastal building line?
For more information go to schedule 2 of the IP
‘Regulation
Heritage = dat,
An application may trigger referral to the Heritage Council as a concurrence agency if the application
involves a heritage registered place.
For more information go to schedule 2 of the IP
Regulation . .
Fisheries matters. 12.
. habitat area. .
An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a
concurrence agency if the application involves assessable building work in a declared fish habitat area; or
as an advice.agency if the application involves assessable buitding work on land that adjoins a declared fish
| transport
“For more information go to schedule 2 of the {P
‘Requtation.
Integration of. land use and public 13.
An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves existing or future public transport corridors, or airport operational airspace”.
For more information go to schedule 2 ofthe IP .
tal
:Railway safety and eff jiciency - 14,
An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves future railway land.
“NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS .
The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications retating to design and siting (17, 18 & 19}, and building work for removat or rebuilding (23), the assessment period is 5 days. For all
other applications the assessment period is 15 days. If no response is received from the iocal government for an application, it is taken to be a deemed
refusal.’ However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure {15}, no
response is taken to be a deemed approval.
particular building work for single
| detached class 1 building or class 10
[building or structure
For more information go to schedule 2 table 1 of the
{P Regulation.
Assessment period 15 days. No response is a
| deemed approval.
Amenity and aestheticimpact of ~ | 15.
An application will trigger a referral to the local government ifitis:
¢ fora single detached class-1 building, or class 10 structure; and
«the local government has declared by resolution the following:
— the appearance of the building or structure will have an extremely adverse impact on the amenity of
the locality, and
— -the appearance of the building or structure would be in extreme Conflict with the character of the
- locality. .
2 Coastal build firg lines are prescribed under the Coastal Protection and Management Act 1995.
a Operations airspace is as defined in State Planning Policy 1/02 “Development in the Vicinity of Certain Airports and Aviation Facilities".
Page 15
Page 21
INTEGRATED PLANNING ACT 1997 _
“
designated rainwater tank area
For more information go to schedute 2 table 1 of the
IP Regulation and the QDC part 25.
Assessment period 15 days. No response is a
deemed refusal.
IDAS Assessment Checklist, Version 20, 2 April 2007
Whether particular buildings maybe | 16. An application to to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a
occupied for residential purposes referral to the local government as the concurrence agency.
For more information go to schedule 2 table 1 of the . .
IP Regulation.
Assessment period 15 days. No response is
deemed refusal. . .
Design and siting 17. An application may trigger referral-to the local government as the concurrence agency if thé building work ©
For more information go lo Schedule 2:table 1 of.the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
{P Requtation. 18. An application may trigger referral to the local government as the concurrence agency if ‘the building work
‘Assessment period § days. No.response is a does not comply with the qualitative statement for building clearance and site cover.
deemed refusal 19. An application may trigger referral to the local government as the concurrence agency if the building work
. does nat comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Development Code, part 11 or 12. °
Fire safety In particular. budget 20. An application may trigger referral to the local government as the concurrence agency to determine the
accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has
For more’information go to schedula 2 table 1 of the been. completed.
IP Requtation. :
Assessment period 15 days. No response i isa.
deemed refusal.
Higher risk personal appearance 21. An application may trigger referral to the local government as the concurrence agency to determine if the
services building work
For mare information go to schedule 2 table 1 of the * complies with the performance criteria of the Queensland Development code part 15; and
IP Reaulation and the QOC part 15. ¢ the work does not comply with an acceptable solution stated in the part.
Assessment périgd 15 days. No response is a : . .
:deemed refusall.” . . . .
Building work for residential service | 22. An application for building work for premises in which residential care service under the Residential
For mora information go to'schedule 2 table 1 of the Services (Accreditation) Act 2002,-section 4, is conducted, or is proposed to be conducted, will trigger
JP Regulation and the QDC part 20, referral to the-local government as the concurrence agency.
Assessment period 15 days. Nov response is a
deemed refusal. :
Building work-for removal or 23. "An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
rebuilding referral to the local government as the concurrence agency. .
For more information go to: Schedule 2 table 1 of the
IP Regulation.
| Assessment period 5 days. No response isa
'] deemed refusal, .
Buildirig work for rainwater tank in 24. An application may trigger referral to the local government as the concurrence agency to determine if the °
building work or structure complies with the relevant performance criteria if -
« Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
buitding work, in a designated rainwater tank area; and
e Under the Queensland Development Code, part 25; the rainwater tank does not include an acceptable
solution for a relevant performance criteria.
Page 16
Page 22
a
ohm
5
i
Refer Roof Plan { sheet 3 )
For Full Roof Details
_ _Ma
COV.BB
575m? .
ymwatertotank- — — — —
_Sto
ro
sececeeseneeccee seen #
mrrA
uw ROA oe s | @on
ODSA Lic. Ne, OF8447
1/33 Premior Clrevit.
Kawana Junction
Queanstand 4575.
Pi/ 07 5493 5908
Fil 07 5493 68714
[email protected]
Amendment Schedule
I88UE AMENDMENT OATE
Prefininary Design| A T2ApH OF
Preliminary Design| B 24 Apa 07
Working Drawings 24 May 07
Site Plan Legend
DP 100 mm Down pips
channeled underground
to Street channe! or SOOOL
Rainwater Storage
D.P.S Downpipe and
spreader to roof below.
Lh Invert level of Sewer line
H.C.P House connection point. Sewer,
AC Alr Conditioning unit
Approximate position,
HP Heat Pump.
Approximate position.
GD SW — Grated Drain for
storm surface water.
GAS Gas Installation by
liscened tradesman
~~ 5.
Provide rainwater catchment from roof
IS 5000 Litres of rain water storage Required
*}99 — Refer Local Authority for details
| regarding tank water allocation
fevnvvenfOT 51S] 20.021
* ‘ 182°36'45"
6,540 182°36'45"
6,964 Setout :
j—Sauseoa Site Plan
PROPERTY DESCRIPTION \
Lot: 51 '
SP No: 163309 }
Parish: Tewantin
County: March
Site Area: 1382m? sar
i 23.5% .
Site Coverage 3.5% F Danny Leach
7
GENERAL NOTES TERMITE PROTECTION CONSULTANTS. ENERGY EFFICIENCY Proc Deserinéon
ALL CONSTRUCTION TO COMPLY WITH THE BUILDING CODE OF AUSTRALIA, } LICENCED CONTRACTOR TO PROVIDE TERMITE BARRIER TO PERIMETER OF | STRUCTURAL THESE PLANS ARE SUBJECT TO 8,E.R.S. ASSESSMENT Proposed Residence
THE QUEENSLAND BUILDING ACT AND TO THE REQUIREMENTS OF THE SLAB AND ALL PENETRATIONS IN ACCORDANCE WITH A.S 3660.1, PART 3.1.3 REFER ENGINEERS SPECIFICATION FOR INSULATION NOTES :-
LOCAL AUTHORITY. OF THE BCAAND RELEVANT AMENDMENTS. SOlk TEST / SITE CLASSIFICATION - PROVIDE R2.5 TO CEILING
, sATTAGHMENTS TO BUILDING SUCH AS DOWN PIPES MUST HAVE ANOMINAL | e SLAB AND FOOTING DESIGN | PROVIDE MIN R1.5 TO EXTERNAL WALLS She Address
SEWERAGE AND FLOOR WASTES TO DISPOSAL SYSTEM AS APPROVED BY | GAP TO ALLOW CLEAR AND UNINTERUPPTED VISUAL INSPECTIONACCROSS =| » FULL STRUCTURAL DESIGN Lot $1
E WITH THE SEWERAGE AND =| THE INSPECTION ZONE. : -40% OF FLOOR AREA TO H,
ee ect aeeaeT AND IN AGCORDANC! eSTRUCTURES SUCH AS STEPS, VERANDAHS, PORCHES, ACCESS RAMPS. REFER TRUSS MANUFACTURERS SPECIFICATION FOR ENERGY EFFICIENT CUTE APPROVED Aspera Place
> 400MM PVC PIPE CARPORTS, TRELLISES, DECKS, HOT WATER SYSTEMS, AIR CONDIT! . Tl ND RAMING. “WATER HEATER TO BE AN APPROVED . .
Cae ee BV HE LOCAL AUTHORITY. ENSURE THE GROUND LEVEL | OR THE LIKE WHICH ARE NOT PRIVIDED WITH ONE OF THE BARRIER SYSTEMS | REFER ROOF CONTRACTORS SPECIFICATION FOR GAS, SOLAR, OR HEAT PUMP o Noosa Retreat
FALLS MIN 1:20 - 800mm AWAY FROM THE BUILDING LINE. PROVIDE AND. DESCRIBED IN THIS PART, MUST BE SEPARATED FROM THE BUILDING BY A ¢ SHEET ROOF FIXING AND ACCESSORIES. INSTALLED BY LISCENCED TRADESPERSON. Noosa
MAINTAIN EROSION AND SEDIMENT CONTROL STRUCTURES TO PERIMETER | GAP OF NOT BESS THAN 25mm, TOALLOW CLEAR AND UNINTERUPPTED : Ticou ecg ma sprig of WRK Dod
VISUAL INSP! .
OF WORK AREA. eWHERE ATTACHMENTS OR STRUCTURES AS OUTLINED ABOVE ABUT A ton nhaerealeielidaladalel
00 NOT SCALE FROM DRAWING. BUILDING AND THERE IS NO CLEAR GAP, A BARRIER MUST BE PROVIDED TO . cree he eb
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, SETBACKS, AND LEVELS] THE ATTACHMENT, REGARDLESS OF THE SIZE OF THE ATTACHMENT. seus 1:200
OF SERVICES ON SITE, BEFORE COMMENCING WORK . CONTRACTOR |S BARRIERS MUST NOT BE BRIDGED BY STRUCTURES, FITTINGS OR OTHER : coun Wortn eanaoor
RESPONSIBLE FOR MAINTAINING STABILITY OF THE STRUCTURE UNTIL ATTACHED TO THE MAIN BUILDING, NOR SHALL THEY BE BREACHED BY THE Sa a
COMPLETION ANS SHALL ENSURE THAT NO PART OF THE STRUCTURE IS INSTALLATION OF SERVICE ENTRY POINT, DOWN PIPES ADDITIONAL SLAB! y RDG hehecked By:
OVERSTRESSED BY CONSTRUCTION LOADING. AND PATHS, LANDSCAPING, GARDENS OR SIMILAR UNLESS ADDITIONAL Project No: eaten
BARRIERS ARE USED TO ELIMINATE CONCEALED ACCESS BY TERMITES TO ; ice
THE STRUCTURE. ‘ 2007 - 047|"" °
en
beep rs
Page 23
*
*
ae
s
4 .
4 23,770 4
: 5,480 41880 4
4—1.200__+ 5,700 $5004 8,300 4 + 4
5,000 240) 4 1,650 2405 4
180024054 5,220 2404 4.6004 8,300 2404-4 +4 +4
240 90
1,200 210_s0 59044 1,010 4 4240 }
pone eee een eee eee eee 4
purrs \
pool 1
4 4 ‘ f as oy? \gate. 1 soxe00 ' 750 x 2000 FG toe
Oe -¢ -@ -O- C x ? == ee yi a al a ast
- > vo t 1 ss
gq 1s 1 wio| Pty |[Ref ' a 8
1
“ei g ei 7} GLARE. - - posse eee
ie i ay Kitchen
g ‘3 : 2400 flat ceiling 1 2
=| of Blo ‘m4 i =
Ng a @ ey ' : 3
5 9 iat s!
el og
oe Bed 3 2!
| 4
iF 8 R He i
3 ' \ stein oor 820 ' .
~- —
+a OF rhe
1 T
Se ' 4 = « ! T
5 gro i 0 tye 2 yp UE gee EEE EI - ~ Qe - - creer ce !
gy Be ts court PRR SP? } ‘South
oO a t
im N 1 tL t
a 8 9 dh 1 ! pT PET yy ---------------- (Deck!
wy og ' 4 2]
oO Sk I ' TOM S|
N ~ 2 1 |
a gfe of) GL BREREEEEEEEEEE EL 220k 222 eeeeeeeee rH g 3
x at i ah coe a ey 5
4 * ey ke th 7
- - E a bee 5
gt x v's Rr ff) epee eco NN
a ° t ' Lt
i 8 5 an x
PoP Bm rn ger mmm mmm mn ee PS Lees 1 !
Z| 1 8 ' 1 Hayy oo m1 a
8 af 1 ' r ’
3 “ ' \ Pool ) '
° R ' oA. ' Conrete Poo! ' ‘ '
w------------8 Wee eee eee
° 1g @ Be. Refer Engireers Spec. Enclosyre : i
3 oo Bed 2 2 ‘ 1 \ g
8 "3 Front pete 3 twa ; . 8
3 _ ot Cad i tiving *
cd v \ ' 1
> Z Mary _ | ‘| .
ae rt MBG \ i gf ------------------ 5
a qj ot ie iQ °
Ho : ‘ 2} ig 3 | e
ht ' ' Si 2415sw 2415 sw, 2415 sw 2415 sw Ss!
ele Foyer ee SE
8 ; \ t
S| & = 11 | R&ked citing, ' 1o¢ i g
=a fig PRR OE 1} g di]
nm ne! ' ' 1 yoo _—— “le a
0 eS = 1 t ! 2440 fm.sd 2412 tm.sd d 1 if ° = i a +: x
. — 5 A
100 mm Stepdown ' ! ‘al a >| Z| a
7 1 ' 5 =
“ES tat i gl g
RS chwey 2 7 3
3 - Study ' E tesa iS et i
3 1) {Psa up's 7740s 2
< H Hi TV Niche a0 ; Bae #8 8
5 i t | = a} wT} wh)
sh-5 Media ray 1 HenBL-abs 3
= ee ape speek
2 = 2* upstand trusses .
8 ° Garage ‘| ' :
i ae Flat ceiling. 1 '
wy Timber trusses J Bed 1 D1 B: + >
0932 Flat ceiting. gs
2415 ox sd 0924 oxxo sw oon sw ‘. Tuber wessos IT i a Si ce
eee een c ence remo n ener en enone ene 4-4
i ear +
1's Bt 7 gi of
t 3 2 1 “i N 5
i By 1 2
. 1 ' o> -
zt : + af +
rer (0824 oxo &W i g g
“ Horocecesscscceerrcereee Pp 4g 0
2,670 204, 4,550 O04 1.010 dfeso 41,260
2404 4 5,000 24 4 1,890
800) 2404 4 6,220 8,900 ++ , +6 _ ¢
4 5,481 $
4800.4 6,700 8,800 + + ¢
23,770
+ ¢
+
Floor Plan
eel
- ' .
I 1:100
R A
QBGA Lic, No. OFDanT
1433 Premier Circuit.
Kawana Junctton
Queansland 4575.
Pit OF $493 5908
Fil 07 5493 69714
Efi [email protected]
Amendment Schedute
1SSUE “AMENDMENT OATE
Praiminary Design| A T2ApHO7
Prefrinary Design) 6 24 Apt 07
Working Drawings ‘24 May 07
00 NOT SCALE FROM DRAWING,
THE CONTRACTOR SHALL VERIFY ALL
DIMENSIONS, SETBACKS, AND LEVELS OF
SERVICES ON SITE, BEFORE
COMMENCING WORK.
ALL CONSTRUCTION TO COMPLY WITH
THE BUILDING CODE OF AUSTRALIA,
THE QUEENSLAND BUILDING ACT AND TO
THE REQUIREMENTS OF THE LOCAL
AUTHORITY,
ALL GLAZING TO BE IN ACCORDANCE
WITHASS, 1288, AND SHALL COMPLY WITH
BCA.
ALL WATERPROOFING TO PROVIDED IN
ACCORDANCE TO PART 3.8.1 OF THE BCA
WET AREAS, ROOM HEIGHTS, LIGHT AND
VENTILATION, AND SOUND INSULATION TO.
COMPLY WITH PART 3.8 OF THE BCA,
REFER TO CONSULTANTS FOR
RELEVANT DETAILS AND SPECIFICATIONS.
SMOKE DETECTORS TO BE HARDWIRED
IN ACCORDANCE WITH AS 3786 AND BCA
PART 3.7.2
Floor Plan
1: 100
Area Schedule
Internal - 275
Entry - 10
outdoor 33
South Deck - 8
Total 326.00 M2
Clent
Danny Leach
Project Description
Proposed Residence
Site Address.
Lot 51
Aspera Place
~ Noosa Retreat ~
Noosa
"These drawings remain copyright of MRA Design
ered may not be tsed in part orn whote withox
fwrttten consent by tha author.
Scate 1:400,
Seat Bewinge
Crewn: RDG
Project No:
Date: 18/05/2007
[Checked By:
Sheet No:
2007 - 047\°2 of
Pets SSCSCS~SCSCS BT
Page 24
i
iQ --------4--
9
Optional timber
Batten Awnin
~-ae------- Pe
Gutter
\
:
1
8
°
Gutter
or
Half-Round or
Selected Fascia
|. timber
ni
\ ~
Optional
Batten Awnir
+
“Stormwater to tank
3,545
Half-Round or Flatback Gutter
¢ Half-Round or
Flatback Gutter
* Half-Round. or Flatback Gutter 1 os
395, +
or
|
Refer Truss Manufacturers Specification for all timber trusses/Rafters and fixings \
Refer Roof Contractors Specification for all roof sheeting, fascia / gutter systems and accessories
+ oe gt me
ee
Roof Plan
1:100
QnA Lic. Re. @
1/93 Premier
Kawano June
Queenstand
o
=
©
4
5
i 6
[email protected]
Amendment Schedule
ISSUE AMENDMENT DATE
Preliminary Design| A Te Apilor
Preliminary Design| B Baap O7
Working Drawings: 24 May 07
Cfent
Danny Leach
Project Description
Proposed Residence
‘Site Address
Lot 51
Aspera Place
~ Noosa Retreat ~
Noosa
These drawings remain copyright of MRA Design
Jand may not be used In pert or in whole without
nition consent by the author.
Scale: 1:100
Stes: Wordng Date: 14/08/2007
Drawn: ROG [Checked By.
Project No: Sheet No.:
03 of 7
2007 - 047
Page 25
1,600
---@ --@-----
'
i
Conrete Pool
Refer Engineers S|
100 mm Stepdown
4
Reinforced Concrete Seb
Refer Engineers S|
Slab and Footing de!
6,700 4 -
—o -#-----
3
IS
| --@-----
4
4 5,700 48004. 3,775 4830 4 3,896 4
T "
5.480
5,480
|
\
t
1
1990
:
-@-------
12,610
5,430
4
4,510
19,550
Slab Setout Plan
‘ 1:100
QBSA Lic. &
1/33 Pre
Kawanes Junc
Queensiand 45
75.
Pf} O7 5493 5908
71
Fit 07 5493 69
[email protected]. aw
Amendment Schedule
ISSUE AMENOMENT DATE
Preliminary Design| A 42 April 07
Preliminary Design| B 24 ApnlO?
Working Drawings 24 May OF
Chent
Danny Leach
Project Description
Proposed Residence
|Site Address:
Lot 51
Aspera Place
~ Noosa Retreat ~
Noosa
‘These drawings remain copyright of MRA Design
Jind may net be used in part or in whole without
written consent by the author.
Seater 1:100
Stats: Working Date: 14/08/2007
Oren: RDG [Checked By:
Projact No: Sheet No.
04 of 7
2007 - 047\°4 of
Teo |
Page 26
oT
ak
ies blockwork
28h Sone Venesr cladding
ype sara
imbef Bat
stone venger over masonry.
Suspended timber awning nn a ee
over BBO Niche
ColorBond Roofsheet _ __. — —__-__
6° Pitch
es t ~ ea = ale Jo ; % 40 Brick Veneer
: . : : ‘ : enderand paint finish
South Elevation
: 1:100
Sns columns conected to masonry
Timber batten entry awning
— ~ “——— Hung from timber Support.
— F.C Cladding with Timber cover strips
¢
4
GolorBond Roofsheet !
eS 8" PILE
240 Brick Veneer
~ Render and paint finish
2448 Panel lift door
North Elevation
{ , 1:100
150 senes blockwork
Render Finish
—— Shs columns conected to masonry
_ 240 Brick Veneer
fender and paint finish
East Elevation
1:100
ae,
3,996 approx Maxihei
West Elevation
; 1:100
mreA
wOROA doe es i gia
OREA Lig. No. OTEAIT
1433 Pramier Circuit.
Kawana Junction
Queensland 4
pit oT $493 58
Fifi 07 5493 69
E/fadmin@mra
anwo wn
esign.com.au
Amendment Schedule
ISSUE AMENDMENT DATE
Preiminary Design| A TAROT
Preliminary Design| B 2H Ape 07
‘Working Drawings 24 May OF
ALUMINIUM FRAMED WINDOWS AND
SLIDING GLASS DOORS
[TO HAVE A POWDERCOAT FINISH TO.
FRAME WITH CLEAR GLASS UNLESS
OTHERWISE NOTED.
ALL FIXING TO BE IN STRICT
ACCORDANCE WITH THE
MANUFACTURERS DETAILS AND
SPECIFICATIONS
WINDOW SIZES SHOWN ARE NOMINAL
ONLY AND ARE TO BE VERIFIED ON SITE.
GLAZING TO BE INACCORDANCE WITH
AS1288.
Elevations Legend
ALL MATERIALS AND CLADDING SYSTEMS,
APPLIED TO BUILDING
ARE TO BE FIXED AND FINISHED IN STRICT
ACCORDANCE WITH
THE MANUFACTURERS SPECIFICATION.
F.C Fibre Cement sheet Cladding
with timber cover strip or selécted tri
IR.B.V. Rendered Brick Veneer
Size as Noted 210 / 230 250mm
Square Hollow Section.
SHS sie / finish as Noted 75/90 mm
Circular Hollow Section,
CHS Size / finish as Noted / mm.
Cent
Danny Leach
Project Deserion
Proposed Residence
Site Address.
Lot 51
Aspera Place
~ Noosa Retreat ~
Noosa
Thess drawings fersain copyright of MRA Design
and may not ba used in part or in whole without
writen consent by the author.
Seale: 1:100
Stes: Pern Date: 14/05/2007
Drawn: RDG Checked By:
Project No: Sheet No:
05 of
2007 - 047
I Bete: Tee
—————e—e—eoEoeooaooo————aooooo SE
Page 27
“
wit
Suspended timber awning
over BBQ Niche
ColorBond Rootsheet
timber trusses
8° Pitch.
“Timber Batten screen |
with access gate.
240mm Brick Veneer cladding _
Render Finish
Refer Kechen marnctacturers Spec t}
2,700
2,400.
3,996 approx Max Height.
Detail - A
Truss - Top plate detail
Typical tie down detail
scale 1:10
COLORBOND FASCIVFLATBACK GUTTER
FIXED IN ACCORDANCE WITH
MANUF, SPECIFICATIONS.
M12 anchor rod taken from
lop plate 10 footings
FIX TRUSSES TO WALL FRAME USING ONE
30 x 0.8mm G.. LOOPED STRAP WITH 4 / 2.8mm
DIA. NAILS AT EACH END. STRAP TO BE TAKEN
MIN. 100mm ALONG STUD.
JOINT GROUP JD4
Detail - B
footing detail
Typical ie down detail
scale 1: 10
PROVIDE APPROVED FLSHING FROM U/SIDE OF
BOTTOM PLATE TO WEEP HOLES PROVIDED OVER
OPENINGS AND AT BASE OF WALLS AT EVERY
THIRD PERPEND.
FOOTINGS TO BE INACCORDANCE WITH
ENGINEERS DETAILS
= =U SNP
Tt I i ;
Section
+1:100
ii
4
i
bh
Detail C
Rafter Detail
QBsA Lic, No. o
1433 Premier
Kawana June
ueensiand
Qa
Pp
F
E
Amendment Schedule
ISSUE ABENDMENT
DATE
Preliminary Design| A
T2Apri G7
Preliminary Design} 6
24 ApnlO7
Working Drawings
24 May 07
Chent
Danny Leach
Project Description
Proposed Residence
Site Address.
Lot 51
Aspera Place
~ Noosa Retreat ~
Noosa
These drawings remain copyright of MRA Design
Jend may not be used in part or in whole without
\wrttan consent by the author.
Scale: 1:100
stu: Working | ate: 1470512007
Drewn: RDG Checked By:
Project No: Sheet No.:
2007 - 047|°6 F7
TORO
Page 28
Amendment Schedule
Sa NT DATE
Prelimanary Design| A TZApAOT
Preliminary Design| B 24 AprilO7
Working Drawings 24 May OF
or ELECTRICAL SYOMBOL KEY
100 mm Stepdown
100 mm Stepdown
CHent
Danny Leach
Project Description
Proposed Residence
' '
Boe eee ee nn ee ee ee ene Sto Address
1 cece eee eee ee ee ened
oO Lot 51
tL : Aspera Place
{ ~ Noosa Retreat ~
Noosa
These drawings remain copyright of MRA Design
and may not be used In Part or in whole without
Electrical Plan ||Siner cory nesses
4:100 jiseet
Sts: ong Date: 14/08/2007
Drewn: RDG [Checked By:
; Project No: Shoet No.
| : 2007 - 047|°7 of?
{ f
a EE Des: TET]
=
'
Page 29
my LINDSAY CONSULTING PTY LTD. STRUCTURAL AND CIVIL ENGINEE ACNOTO 74809 AGN of 418 386 38S CST REGISTERED AS TRUSTEE FOR THE LINDSAY FAMILY TRUST Ref: 070819 18" May 2007 D. Leach Dear Sir, PROPOSED RESIDENCE LOT 51 ASPERA PL, NOOSA As commissioned a footing, structural and pool design for the above project has been carried out and attached are drawings 07-0819-01 to 12. Should you require any further information please do not hesitate to contact me at the above address. . On and Behalf of LINDSAY CONSULTING PTY LTD LD Off. 2C/82 Parker St, Maroochydore 4558 OFFICE: (07) 54 792 118 MOBILE: 0412 313 648 FAN: (07) 54510 118 E-MAIL: [email protected]
Page 30
FOUNDATION AND STRUCTURAL PLANS
SITE CLASSIFICATION - M
ARTICULATED MASONRY VENEER
SITE CLASS FOUNDATIONS
Most sand and rock sites with little or no ground movement
CLASS - A from moisture changes.
Slightly reactive clay sites with only slight ground
CLASS - S movement from moisture changes.
Moderately reactive clay or silt sites which can experience
CLASS - M moderate ground movement from moisture changes.
Highly reactive clay sites, which can experience high
CLASS - H ground movement from moisture changes.
Extremely reactive sites, which can experience extreme
CLASS - E ground movement from moisture changes.
CLASS - A to P | Filled sites.
Sites which include soft soils, such as soft clay or silt or
CLASS - P loose sands; landslip; mine subsidence; collapsing soils;
soil subject to to erosion; reactive sites subject to abnormal
moisture conditions or sites which cannot be classified
otherwise.
CONSTRUCTION NOTES
: 1. All workmanship and materials shatt be in accordance with the requirements of the relevant current
Australian Standard Codes, Building By-Laws and the ordinances of the relevant Local Authority.
2. i) Concrete Class - Minimum 20 MPa at 28 days
Stab on ground 20 nominal maximum aggregate size
80 maximum stump +/-10mm
ii) Concrete Class
Suspended slab
Minimum 32 MPa at 28 days for internal slabs
Minimum 40 MPa at 28 days for external slabs
20 nominal maximum aggregate size.
80 maximum slump +/-10mm ‘
25 to upper face of internal stabs -0 +Smm
45 for external exposure
30 to a membrane in contact with the ground
40 to unprotected ground :
4. Minimum Laps and Splices for Reinforcement
{a} Slab Fabric - 225 minimum overtap of transverse bars at all edges
(b} Trench Mesh 500 splices in all footing beams .
Laps at intersections as per the Design Drawings
500 splices in all footing beams
Provide “L” bars at all beam intersections with 500 laps to each leg
5. Fireplaces shall be supported on slab thickening extending 300 past the edges of the masonry, and
reinforced with F72 mesh top and bottom. Slab thickening shall be 150 thick for single storey construction
and 200 thick for two storey construction.
Shrinkage Control
6. Reinforcing mesh may be reduced to F72 for slabs under 18m in length on "S” sites
7. Where the floor slab is to be tiled, the following recommendations are made, in order to
minimise the effect of shrinkage:-
- F92 slab mesh (or equivalent) should be provided
- Placement of tiles should be delayed for as long as possible (preferably for at least 3 months)
EARTHWORKS NOTES:
Where any filling is carried out on the site after the completion of the site investigation, the
t following recommendation shall be fellowed:-
8. The site shall be stripped of all vegetation prior to the placement of any filling material.
9. Compaction Standards for filling Material
A. Controtled Filling 5G
{a} Sand filling up to 600 deep, placed in maximum 300 thick layers and compacted with a vibrating
roller to achieve a minimum Dynamic Cone Penetrometer reading of 7 blows per 300 penetration
(refer AS 1289.F3.3}. Sand fill may be flooded if necessary to achieve this compaction standard,
provided the water can subsequently be drained from the site.
(b) Non-sand filling up to 400 deep, placed in maximum 150 thick layers and compacted with a
mechanical roller. Clay fill shall be moist during compaction.
{c) Controlled filling shail continue for at least 1 metre past the edge of the footing beam and shall
be battered back to the original surface with a stope of no more than 1:2 (Vert : Hor),
(d) Where the depth of filling material exceeds that specified above, the filling material shall be
compacted as follows:-
t Sand fill to 65% Density Index in accordance with AS1289.E6.1
: Non-sand fill to 95% Maximum Ory Density (Standard Compaction) in accordance with 5.4.1
Compaction tests shall be carried out on each layer as the filling is placed. If the compaction standard
specified is not achieved, then a “Pier and Slab” and “Pier and Beam” footing design shall be adopted with
all piers founded on the undertying natural material.
. B. Rolled Filling
(a) Sand Fitling up to 600 deep, placed in maximum 300 thick layers and compacted by repeated
tolling with an excavator.
, (b) Non-sand filing up to 300 deep, placed in maximum 150 thick layers and compacted by repeated
tolling with an excavator.
{c) Where the depth of filling material exceeds that specified above, the filling material shall be
compacted as follows:-
Sand fill to 65% Density Index in accordance with AS1289.E6.1
Non-sand fill to 95% Maximum Dry Oensity (Standard Compaction) in accordance with 5.4.1
Compaction tests shall be carried out on each layer as the filling is placed. If the compaction standard
specified is not achieved, then a “Pier and Slab” and “Pier and Beam” feoting design shall be adopted with
all piers founded on the natura! underlying material.
3. Minimum Cover
to Reinforcement
(ch Reinfercing Bars
Le
ANT CL Lt A ZN
SA
Tomes l=7:
LINDSA Y CONSULFING °7y, (ubgER-#-SLENT
gli<
=-
E a
~Pig
?
o
wn
n
tod
&
a
a
eo] 8<
=i >=
<| Ga
4] 2
el Se
a wi
S| oo
319 <
a4
-| Oin =<
ut a A
aor oO
o| &© ao &
Saw Zz
a
2
=
z
oa
|=
o x
nM |=
Ll +
A w
2} x
ky
ROOCHYDORE
OFF. 2C/82 PARKER STREET, MA
~—s
Page 31
ALL EXTERNAL MASONRY WALLS SHALL BE
ARTICULATED AT 5000 mm CENTERS
CUT/FILL LINES AND PIER LOCATIONS SHALL BE CONFIRMED ON-SITE
SUITABLE FOR MAXIMUM BUILDING LENGTH OF 25 METRES
FOUNDATION PLAN
SCALE 1:00
EB1
‘| 100 mm SLAB SL72 TOP FABRIC
-] 100 mm NON-HABITABLE SLAB SL72 FABRIC CENTRALLY
125 mm SLAB SL72 TOP FABRIC, SL72 BOTTOM FABRIC
2
07-0819-02 | A
—_—
PROJECT DESCRIPTION AND ADDRESS |=
LOT 51 ASPERA PLACE
PROPOSED RESIDENCE
NOOSA
DANNY LEACH
eC TURAL UAND OLA APN ZS Ste be So
LINDSA Y CONSULTING, °75, |BUupER & CLENT
4
Page 32
400 MIN
3 DENOTES MINIMUM DEPTH BELOW
Fo Masonry veneer © f- SL72 Fabric SITE LEVEL {SL} FOLLOWING - Masonry veneer
| SL82 Fabric STRIPPING OF ALL VEGETATION
| -— SL82 Fabric
| 400 la
- 15 yrs aed
|_| | == — 100 ri
ne Ls t =< 400 7 Z 1 on 20 fall ——
ve ea sg
. z| SL fo
tO tol est > RS Compacted sand fill
ISIN 200 MIN S| * 5 a
SL = = |
= [TAN
350 = ST Ri igs at 600 C/C or
Y12 ligs at 900 C/C.
3-L11TM 800 SQ. 4 | {ligatures not required if Beams
a 3-L1T™M 350 250 | are poured integrally with stab)
300 TYPICAL EXTERNAL EDGE BEAM - EB1
Not to scale
350D
\ 1000 mm max,
350 S82 Fabric —— .
| 1800 Centres each way : , , Internal load - bearing wall
t ?
ALTERNATIVE EXTERNAL EDGE BEAM - EB2
Not to scale
Conpacted sand fill
am Masonry veneer
-— SL82 fabric
-— SL82 Fabric m0
1 on 20 falt 100 ————— Not to scale
205 MN. “e { Ef :
FSL } 1
IRS | 4 t ~ Compacted sand fil
400 MIN, B a Load bearing wall ————j-o
| P——— 0 tigs at 640 C/C or | 200 MN MIN. {
Yi igs at 500 C/C te R10 ligs at 600 C/C or ~ Slab mesh
YA2 ligs at 900 C/C.
\ (Ligatures not required if Beams 1
3-L11TM 4 350 30 are poured integrally with stab) Slab mesh 15
40 bottom cover ———__—~ = [=
EXTERNAL EDGE BEAM-EBA EXTERNAL EDGE BEAM-EB3 50 | 500 | 50
a TYPICAL SLAB THICKENING UNDER LOAD BEARING WALLS - STB
AT VERANDAH AREA Not to scale
Not to scale
—
my.
07-0819-03} A
3
[ampeter Pia
PROJECT DESCRIPTION AND ADDRESS [=
PROPOSED RESIDENCE
LOT 51 ASPERA PLACE
NOOSA
DANNY LEACH
<I
7
Se be ee OL NUCALN Fa
Be rete TU ke Z
LINDSA Y CONSULTING (75 Samu
OFF. 2C/82 PARKER STREET, MAROO,
4
Page 33
r- $L82 Fabric
Masonry veneer
r- SL82 fabric
Cc 100
» Lp we
=
LL. i N
Water Levely
Compacted sand filt
150] |
Yi2 ligs at 900 C/C.
5
_ R10 igs at 600 C/C or 200 MINK
N
MIN. .
| ——-———- R10 ligs at 600 C/C or
350
Yi2 ligs at 900 C/C.
(Ligatures not required if Beams
50 are poured integrally with stab)
L 300
Piers under Footings at
400 HIN
350 DIA 1500 mm maximum centres
EXTERNAL EDGE BEAM-EBS —_TYPACAL EXTERN
o— Blockwork
easel -— SL82 slab mesh - 25 top cover
100
msn, 10020 fall —-——
FS | \
_ NEES | Compacted sand fill
200 MIN. | |
——.. | Bi igs at 600 C/C oF
3411TM trench mesh Yi. 330
Yi2 ligs at 900 C/C.
(ligatures not required if Beams
20 are poured integrally with stab)
TYPICAL
EDGE BEAM - EB5
Not to scale
7
Juc_ BEAR AN) _VERANDAN
ADJACENT TO POOL AT VERANDAH AREA
EDGE BEAM-EB3
Not to scate
zl <
EL =
9
“Las
ae
a as
g
3
uw
al 4&
2| 2
z| a>
gas
al WY iy
S| — &
no <
-lon<
Beg
alesse
sjauste
2
ad
>
=z
a
<
QS
——_
External
Edge Beam
NN
300
>
?
Piers under Footings at
{500 mm maximum centres
FOOTING DEEPING ADJACENT POOL - EB7
350 DIA
Sr
Not to Scale
i
2
Water Level
PH 54 792 118
SN ae eee ot at lee “foe NLS NI EE Fe
LINDSA Y CONSULFING (75 Peon
Bo Tel ce TU te Z
=
Page 34
W| (WIDTH)
L {(LENGTH}
PLAN
Tie-down Rod
Refer Arch. Drawings
(Y12 bar mininum)
Water Level
350D
BLOCK PIER ADJACENT POOL DETAIL - BPt
Not to scale
N12 bar at 1800 centrally P
placed lap 400 min. to
$182 Slab mesh
Compacted sand fill
* 600
min.
. 450
TYPICAL STRIP FOOTING DETAIL - ST2
wall reinforcement NI T
400
No construction joint —1
Not to scate
450 3-11TM trench mesh, 40 bottom
and side cover,
TYPICAL TERNAL BEAM - 52
Not to scale
Y12 bar at 1800 centrally
placed lap 400 min. to
wall reinforcement
3-11TM trench mesh top
and bottom with R10 ties
at 1200 centres.
v
Ly Lee NS
* DENOTES MINIMUM DEPTH BELOW
SITE LEVEL (SL) FOLLOWING
STRIPPING OF ALL VEGETATION.
SL
AYANY Y12 bar at 1800 centrally
placed fap 400 min. to
* 600 wall reinforcement
min. 500
J | [K—— 3-11 trench mesh top
350 at 1200 centres.
Not to scale
8 el Se te NI CIN EE ks
> treloo Tis
LINDSAY CONSULTING 135 BUILDER & CLIENT
gli<
w
&| 3
is
| i
wn
n
ul
4
3
7 08
o| 4 «
=i > —
<< Ga
Z| 2
ave
lao
4ig<
aa SC
-| O th <
wl a w
41 Or ©
o| &o &
= awd Z
“
z
oS
2
Is
z
ik
(x
OFF. 2C/82 PARKER STREET, MAR
Page 35
3102S 04 JON
€1S - 1V1G0 100d INZDVC¥ ONY SNILOOI didiS
| BOSE |
—
Ir
t
SS
pad] 2]0K,
&
z
s
=z 18
=
2
=|>
ip
2.
BOY
J
4
Pd
=
i]
:
L IND Ss. "A Y CONSU; ING Pry BUILDER & CUENT PROJECT DESCRIPTION AND ADDRESS a 6
DANNY LEACH PROPOSED RESIDENCE
SRASS LOM LOIN AN SOI.) AN ea
LOT 51 ASPERA PLACE
7s
07-0819-06
> als
NOOSA
Page 36
NOTES
1. STRUCTURAL
a) Concrete = - Fe = 32MPa at 28 days.
- Concrete shall comply with AS2783.
~ Concreting shall be carried out in one continuous operation by pneumatic spraying process.
= Shade concrete and keep moist for 7 days.
~ Exposure Classification (AS2783) - 82.
b) Reinforcement Fy = 250MPa. $12 bars throughout, lap 400 where required.
~ Bars shall be tied securely in position.
- Cover shall be 65mm to verticat reinforcement to the inside face.
¢) Foundations - Excavation shail follow contours of pool shape. Where over excavation occurs fill with concrete.
- Foundation material shall be uniform over entire pool base, if not refer to Engineer.
- Inclay or rocky ground use 75mm thick layer of 20mm nominal gravel under base,
~ Minimium safe bearing capacity - 100kPa
= Pool walls shall be poured against undisturbed natural ground, if not refer to Structural Engineer,
a
300 Totat length 16700 MAX
- Design suitable for sites up to and including Class H (AS2870 Parts 1 and 2)
- If pool is located in fill or aboveground refer to Structural Engineer.
- Orawing not to be used for pools in Exposure Classification C (AS2783)
- Walls have not been designed for cantilever walkways.
2. CONSTRUCTION
a) Construction shall comply with AS2783.
3. GENERAL
a) Ground water pressure shall be relieved by Hydrostatic valve as shown. :
b) Surface water shall be prevented from penetrating down beside poo! wall by 3
grading surrounding areas away from the pool.
¢) Security fencing shall be as required by the Local Authority.
d) Finishes to pool surface shall be as detailed by Pool Contractor.
e) All hydrautic equipment (eg. pump, filter, hydrostatic relief valve, skimmer box etc.)
shalt be as specified by the Pool Contractor
ry
4) Design
4
y
5
900 wide x 75 thick slab alt round with F52
fabric CP or pavers with cement stabilized
filling sand, Refer Note 3(b).
300 |
} Maximium surface area - 100m? Finish to Clients or | wr
Contractors requirements ™,
200] Bo Water Level ——————
b 3/812
inbond beam = a $
“a =x
wl 4 ,
| we a,
3 sf %% 100 | \
% : DIA 200 Anti vortex . \
Unreinforced cutoff wall
& cover & (OMY Class sites)
— west eaen A
ol , eter re A
Earth wire to reinforcement meron ‘ * Dia 60 suction tine : 300 t
/- Connect to dwelling earth system Hydrostatic rellef vatve & to filter | “
300 Varies e wo
} Sump containing 3 = st
/| ae f ee
Waterlevel ww 600 SQ
TE .
Where poot wall height (Hl) exceed #
2] ittostnm for 5]
provide intermediate vertical jars .
i, Sia basin his are at 0 LONGITUDINAL SECTION COPING VARIATION WET EDGE DETAIL
4 300 Varies 4
I I I
| @ - _
=
oY sli os
ry ___._____ &%
SECTION B-B
SECTION A-A
7
PROJECT DESCRIPTION AND ADDRESS [==
PROPOSED RESIDENCE
LOT Si ASPERA PLACE
NOOSA
DANNY LEACH
:
S
>
S
CO
a
a
“
z
|
HE NICINE tx
7)
Or
SND
SS
8
5
D
Y
.
ry
OFF. 2C/82 PARKER STREE
Page 37
Filter and Spa
pumping unit {optional}
Outlet to stormwater
drainage or sewer as
required by council
Main sump 1
for emptying
SCHEMATIC FOR WATER CIRCULATION
All pipework shall be Dia 40 uPVC Class 9 and
all fittings shall be uPVC Class 18 all to AS1475 —
, 300 Varies 150
3 treads at 300 |
a a
§ g
$12-300 EW CP 2
$12-300 EW CP. *
STEP DETAILS
SPA DETAIL
3 S12 - 200 Ew CP —
= > Poot reinforcement
iS J
S12 - 300 EW (P
400
BENCH DETAIL
Extra $12 1500 long
spaced 300 vertically
15 cover to inside face PLAN
= SKIMMER BOX DETAIL
Profite of recess
Line of en, to suit skimmer box.
excavation 2 $12 - 200 EW
MIN 150 ft Pool
/~ Position outside horizontal { t reinforcement
reinforcing with 60 MIN cover +
to excavated face MIN 150 | |
WALL CORNER DETAIL BOND BEAM CORNER DETAIL SECTION (-£
FOR RECTANGULAR POOLS — "FoR RECTANGULAR POOLS © SKIMMER BOX DETAIL
SC TURAL AND) Clit EA CIE Ee
LINDSAY CONSULTING [5 BUILDER & CLIENT
zl <
©
5/2
7
b bes
o
4
E
3
< as
ol MZ
z 3S
3a
as
ry ou
4
a.
wn
ale &
) 7
-l Oth <
vl a ~n
aor o
oj “© o &
eanaz
a
z
Go
2
I
£
at
wn
x
a
OFF. 2C/82 PARKER STREET #4
Page 38
o— @™ = = — hea i ——S} ———} = Po a S | ry sc .S za © | © 5 | | = ~~ cm > | = a | 7 : | @ @ @) " [aneet L IND Ss ‘A Y CO NSUL ; ING Pry BUILDER & CLIENT PROJECT DESCRIPTION AND ADDRESS 9 -| DANNY LEACH PROPOSED RESIDENCE a LOT 51 ASPERA PLACE cana nme | Wav PH 54 792 118 NOOSA 07-0819-09] A
Page 39
Sn ___ vs a Cs 7 7 al Tl if rl pt ra IF | re a7 7 TTT Ee a St ol Ig —-—~————4 "g fr |_| J. alli | || Bit hs oo ee -} = g ) re 1 eb —aps fi Hib ik - — Pe —-H a acy ee: | 3] 2 SSS bk -ar- i || Lg, - —— — | | aye] 4 a Pa | sf The 3 3] pea 3 a [| ) Pr as] = rina ane | \ Ta | Lot to! 8 ' bord \ 150x465 LGL Rafters @s0rs | & f ws wr tn =f. 3} |S S | 3 ( 1 St TA tH a a he ee . | tug tf ee ee ee s. = ne « ol : = a fora pet el ra a ri, poo AS 2g 2 Me Po it gk Se ral | ot to bot bt ql | f #igl lot tpap Seri "he Sir tt ee WP | in Pe ee ee Po Pi od tod ot 4 ee tL _ fos, a (i i 4 es | allie io ! i | ! i | aa : Bracing Required 19.1. KN : : pO BE Bracing Provided 19.2 kN oo SS)" en ee Bracing Required 20.8 kN Bracing Provided 26.8 kN Blockwork Provided 0.0 kN Total Provided 28.8 kN sracna Rewured sa un GROUND FLOOR LINTEL AND BRACING PLAN racing Require . Bracing Provided 51.8 KN ALL LINTELS SHALL BE MGP12 UNLESS NOTED OTHERWISE Blockwork Provided 99.5 kN Total Provided 1513 kN SCALE 1:100 —_—> Bracing Required Bracing Provided Blockwork Provided Total Provided Bracing Required Bracing Provided Blockwork Provided Total Provided ALL BLOCKWORK: TO HAVE Ni2 @ 1800 CRS, CORE FILLED, 2/N12 TOP COURSE 4 ‘ 27.0 KN 28.8 kN 50.3 kN 67.5 kN 61.6 KN 63.4 kN 29.2 kN 92.6 kN 10 " GROBP.DWG 07-0819-10 | A wn wn had a 8 = 8 Sys =| a= si 5 < B| i & a. “i 4182 So] a sla SF iw store oO s| zo 8 ela 3s a < us =_ = =< a 2 [= 2 [5 wm x= a. KeoRE __ f/f Be ert Ge JE AL ANT) CU EN CANE E be LINDSAY CONSULTING, 77%, (BULGER & CLENT OFF. 2C/82Z PARKER STREET, MARQOC
Page 40
~
FRAMING SCHEDULE - SHEET ROOF ALL GIRDER TRUSS TIE-DOWN SHALL
BE IN ACCORDANCE WITH
WIND CLASSIFICATION MANUFACTURER’S SPECIFICATIONS
MAXIMUM ROOF LOAD WIDTH - 5800mm NOGGINGS - 1350mm CRS MAXIMUM
STUD HEIGHTS & SIZES
ALL STUDS NOT NOTCHED
2450 - 90x35 MGP12 @ 450 CRS
2700 - 90x35 MGP12 @ 450 CRS STUDS AT OPENINGS
3000 - 90x35 MGP12 @ 450 CRS OPENING WIDTH No. OF STUDS
3600 - 90x35 MGP12 @ 450 CRS Oy
4200 - 2/90x45 MGP10 @ 450 CRS 900
4500 - 2790x45 MGP1S @ 450 CRS 1200 2
1500 2
TOP PLATES - 2/90x45 MGP12 1800 2
2100 2
TIE-DOWN SPACING - 1200mm 24.00 3
2700 3
BOTTOM PLATE - 90x35 MGP12 3000 3
3200 3
TRUSS TIE-DOWN - Mi2 RODS AT 3900 5
CORNERS, EACH SIDE OPENINGS. 4.800 5
ROOF BATTENS .
METAL ROOF BATTENS FIXED IN
ACCORDANCE WITH MANUFACTURER'S
SPECIFICATIONS
RAFTERS & ROOF TRUSSES SHALL BE TIED
DOWN WITH 1/30 x 0.8 mm Gl STRAP
S/S
18 m
1.8 m
BRACING LEGEND
INDICATES M12 CYCLONE ROD :
}
INDICATES M16 CYCLONE ROD {
INDICATES M16 BOLT i
INDICATES 180mm LENGTH OF STRUCTURAL PLY BRACING WALL (6.4kN/m). 4.5mm F27 EXTERNAL PLY SHEETING FIXED
TO ONE SIDE OF STUD WALL, STUDS TO BE AT 600mm CENTRES MAXIMUM. VERTICALLY INSTALLED SHEETING TO BE
NAILED TO TIMBER FRAME WITH 30mm x 2.8-3.15@ CLOUTS OR FLATHEAD NAILS. NAILS ARE TO BE LOCATED AT 150mm
AROUND ALL EDGES AND BUTT JOINTS AND AT 300mm CENTRES ALONG INTERMEDIATE STUDS. PROVIDE M12 CYCLONE
ROD WITHIN SOmm OF EACH END OF THE BRACING WALL CONTINUOUS FROM TOP PLATE TO SLAB/FLOOR FRAMING AND
M12 BOLTS FROM BOTTOM PLATE TO SLAB/FLOOR FRAMING AT 1200mm CENTRES MAXIMUM IN BETWEEN.
INDICATES 1800mm LENGTH OF GYPROCK BRACING WALL (3.4kN/m). 10mm PLASTERBOARD LINING FIXED TO ONE SIDE OF
STUD WALL, STUDS TO BE AT 600mm CENTRES MAXIMUM. TOP AND BOTTOM PLATES TO BE &5mm DEEP. HORIZONTALLY
INSTALLED SHEETING TO 8E NAILED TO TIMBER FRAMING, WITH &Omm PLASTERBOARD CLOUTS. CLOUTS ARE TO BE
LOCATED AT 100mm CENTRES ALONG TOP AND BOTTOM PLATES AND SHEET EOGES AND AT 225mm CENTRES ALONG
INTERMEDIATE STUDS. PROVIDE M12 CYCLONE RODS WITHIN SOmm OF EACH END OF THE BRACING WALL CONTINUOUS
FROM TOP PLATE TO SLAB/FLOOR FRAMING AND AT 1800mm CENTRES MAXIMUM IN BETWEEN.
INDICATES 1800mm LENGTH OF EXTERNAL FIBRE CEMENT BRACING WALL. (&.4kN/m) 4.Smm HARDIFLEX OR 6mm F.C. SHEETS
EXTERNAL CLADDING FIXEO TO ONE SIDE OF, STUD WALL, STUDS TO BE AT 600mm CENTRES MAXIMUM. VERTICALLY
INSTALLED CLADDING TO BE NAILED TO TIMBER FRAMING WITH 30mm x 2.0 FIBRE CEMENT NAILS (GALVANISED). NAILS
ARE TO BE LOCATED AT 150mm CENTRES ALONG CLADDING SHEET EDGES AND AT 200mm CENTRES ALONG INTERMEDIATE
STUDS. PROVIDE: M12 CYCLONE ROD WITHIN SOmm OF EACH END OF BRACING WALL: CONTINUOUS FROM TOP PLATE TO
SLAB/FLOOR FRAMING AND Mi BOLTS FROM BOTTOM PLATE TO SLAB/FLOOR FRAMING AT 1200mm CENTRES MAXIMUM IN
BETWEEN.
‘e INDICATES 150mm BLOCK WALL WITH A RACKING RESISTANCE OF 13.4kN. Y12 RODS TO BE PLACED VERTICALLY AT
CORNERS, EACH SIDE OF OPENINGS AND AT 1800 CENTRES MAXIMUM IN BETWEEN. PROVIDE 2 COURSE (MIN) BOND BEAM
CONTINUOUS AT TOP OF BRACING WALLS.
WALLS BRACED WITH STRUCTURAL PLY BOTH SIDES ACHIEVE A RACKING
RESISTANCE OF 12.8kN/m. (NOTE M16 RODS REQUIRED EACH END}
WALLS BRACED WITH PLASTERBOARD BOTH SIDES ACHIEVE A RACKING
RESISTANCE OF 6.4kN/m . : -
INDICATES 300% R.C. COLUMN WITH A RACKING RESISTANCE OF SkN IN EACH
DIRECTION. .
CANTILEVERED POST BRACING FORCE IN EACH DIRECTION. FORCES SUITABLE FOR DIA
450 X 900 DEEP CONCRETE FOOTINGS. REFER TABLE BELOW FOR VALUES
POST HEIGHT BRACING FORCE
RESISTED
0 TO 600 mm 6 KN
600 TO 1200 mm 5 kN
1200 TO 1800 mm 4 kN
LINDSA Y CONSULTING {i
=
-_
TT
= hg
oS
~~
mae
n
nw
a
4
a
< iad
wa
295
z| 3°
olf <t
=| io &
=| 5 &
48 <
aw o
-| O fF <
wl a ~”
soe Oo
oj] &o &
ea Z&
a
e| >
a| 2
zl ©
|=
Pn x
PK] |;
N a
€
SINT CLV IL BAR CaN EY
Ne
Cit ke Z
OFF. 2C/82 PARKER STREET, MAROOZHYDOR
Page 41
Sal ORE ‘ATWO
J} (tid HIM SNOGWTO TWNRGLXG oCGNGA ORE
CNY NOIS30 “JNNYA OL
UGONYH
0s 6 (HH) SSSR AN Ng
‘NOLWOUDS
SHNDS UMUDG X HON OS LL 3dil/Z
_ HUM SSSML OL SALVE JOON IGN Hd
O8KS TNYW 88d S¥ 5.0006 @ SNALLVG 4004
WIN OL CNY SNLEHS 4008 (NOGOTIO
Or NOU INI
‘(US SNOW WOOL ‘NIN
Tae tame are aera ae
Pe tie Pure Al AND Clvil PRIN oe ed
ING ?5%, [SuADER & CLENT PROJECT DESCRIPTION ANO ADDRESS |=" 2
DANNY LEACH PROPOSED RESIDENCE = far ——__
LOT 51 ASPERA PLACE raved aR | av
‘PH Sé 792 118 NOOSA 07-0819-12 | A
Page 42
EAE : _ LAND USE SECTION FEES ow MALONE , 7 RECEIPT TYPE SALE OF DOCUMENTS mc , Superseded Planning Scheme’ Documentation : §20 Copy of Permit/Approval Letter 110 The Noosa Plan Documentation - . 111. APPLICATION FEES: : , Material Change of Use - Codelimpact / Copsistent : 4 Zl do 521 Incoréistent ‘ 521 - Assessment under Superseded Planning Scheme , _ §21- Modification to a Development Permit “ $21. Extension of a Currency Period . 521 Operational Works - Landscaping . , . 521 @ ’ Bldg Work assessable against the Planning Scheme : §21 PRE LODGEMENT REVIEW . Half Hour ' 522 One Hour co 522 ADVERTISING . ; , Purchase Advertised Applications © / : 523 JETTIES © , . Jetty Application Fee 524 Jetty Bond ‘ : 51 : : (Category 4) BONDS . Performance Bond . . . . §4 : : (Category 9) SIGNS : : . Lo Registration Fee ‘ : . 222 seu FEE . : . Search of Land Use Section file 112 Liquor Licensing Request : 113 . TOTAL. $ 47S'O0 wame: _ T_ Leach Phy Ltd [nr prurt Lt Lrack faaity jut ADDRESS: £0 fox /7/2 7 Noosaville fw 44bb. | FILE NO: z007/ 100k DATE: J'-6- 7007 ‘RECEIPT NO: _- LALEEP- . Signature of TP Officer: -A AUTHORITY NO: af Z00 7 109 8/, l
Page 43
CALCULATION OF FEES APPLICATION FEE TOTAL FEES MCU - CODE ASSESSMENT Details of Development Consistent 1.0° Inconsistent 3.0 FEE CALCULATION MCU - IMPACT ASSESSMENT Details of Development Consistent 1.0 ‘|Inconsistent 3.0 FEE CALCULATION OPERATIONAL WORKS Details of Development FEE CALCULATION TOTAL FEES
Used in these records
07/1098 - MCU - Detached House [As Published]Related documentApplication case desk ↗
00154BA3.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.