INTEGRATED PLANNING ACT 1897

IDAS Assessment Checklist, Version 20, 2 Apri! 2007

 

Development within the limits ofa 12. Does the application involve development below high water mask and within the limits of a port
port” .

“For more information refer to Guide 18. For
information about prescribed tidal work refer to
Guide 24,
you answered “YES” to Q12, the application
tiggers referral to the Port Authority.

- The Port Aistharity is'a concurrence agency if the
development.is -

 

‘© within 200m of a shipping channél or an entry.

and exit shipping corridor for the port”
* within 100m of a swing basin, a commercial

shipping whart, a mooring: anchorage or spoil

grounds;

(© Within 1000m-of. a planned port actity
identified ia land-use plan approved under
- the Transport infrastructure Act 1994.

{nail other Situation the Port Authority is s an

advice agency.

under the Transport infrastructure Act 1994? .
(wH0
LD YES - complete Part M of.Form 1, or Part P of Form 1 if the work is prescribed tidal work

 

 

“Marinas > :

«For more information refer to. Guide. 18, For
‘iftormation about. whether. a‘marina is prescribed
dal work refer to Guide 24. The'local

* govermmentis thie asséssfent’ imariager for ay
prescribed tidal work:

If you answered “yES" to Q13, ‘the appléation.
“triggers referral to ueensland Fire and Rescue
‘Service as an advice agency.

 

 

 

 

 

Tidal works-in strategic ‘port land tidat
‘areas,

Fort hore information tefer to Guide .
Uniess you: answered: “NO” to Q14,'the relevant |

Port Authority is the assessment manager for, the
i open and the Environmental Piotectioh’

Agency (EPA) and Queensland Transport (QT)

  

 

.are concurrence agencies for the application.

— fF

1

3. Does the application in involve operational w work that is tidal work for a marina® with more than 6

- vessel berths? «
FNo ,

(71 YES - complete Part M of Form 1, or Part P of Form 1 ifthe tidal work is prescribed tidal work

een

4. cof the application involve tidal works within a strategic port land tidal "area? [

vero yt bee pa ae fe ate \

CYEs- complete Past M of Form t

“4 ete ty io :

 

‘Heritage
For further information refer. to Guide 1 9.

if you answered "YES" to Q15, the application

triggers referral to the’ ‘Queenstind Heritage

‘Council as concurrence. agency for the
‘application. :

“Unless you answered “none of the above” to

* Q15(b), the application involves réferral to the -

‘Environmental Protection Agency asan advice ©
agency for the application .

1

1

5. Does the application involve 6 dveopent ina heritage registered place as defined under the -
Queensland Heritage Act 1992?

NO :
DYEes- complete Part c of Form 1

15(b)The application involves: (tick applicable boxes) . :

C1 (i) a material change of use assessable against the planning scheme and the lot shares a.
common boundary with a protected area or registered place‘under the Queensland
Heritage Act 1992;

Diii) reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;,
C1 iiii) none of the above.

 

Declared catchment areas

For mare information, including a list of the
declared catchment areas within Queensland,
tefer to Guide 13.

Unless you answered “none of the above” to
Q16, the application requires assessment by the

:Department of Natural Resources.and Water
(NRW)...

 

. Ifan agency other than NRWis the assessment

“manager for the application, NRWis a
Concurrence agency for the application it in
relation to this matter.

 

1

6. The application | is in an area declared to be. a catchment area under the Water Act 2000 and
‘involves: (tick the applicable bax/es)

oO (i) reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares;

Oo (ii) . development assessable against the planning scheme involving the establishment or
.expansion of a waste water disposal system, other than a disposal system for carrying
ot out an environmentally relevant activity, under the Environmental Protection Act 1994;
(iii)

none of the above

 

18 igh water mark-is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide,
19 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995.
2% Staley port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to swalegie portland.

Page 5

Used in these records

About this file

File size
3.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1098 - MCU - Detached House [As Published].pdf · 3.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.